Inspection Date: May 24, 2017
Saint Lucy County SCANNED
Planning a& Development Services BY
Building & Code Regulation Division St. LuCle COUrity
2300 Virginia Avenue
Fort Pierce, FL 34982
Subject:
Special Inspection Report 1 of 1 (Final)
Permit:
SLC 1701-0143
Sprint Site:
M160XC244-A (Midway Tower)
Site Address:
375 E Midway Read, Fort Pierce, FL 34982
APX Project:
17-0135.02
Dear Building Official:
a PA
141;r-2rr4arr�a rrn
APX Engineering Group, LLC (APX) performed observations of the Sprint telecommunication facility
located at the above -referenced site. The purpose of these observations was to inspect the following:
1. Relocation of three existing antennas.
2. Installation of three proposed antennas.
3. Relocation of six existing Remote Radio Units (RRUs).
4. Installation of three proposed RRUs.
5. Installation of one proposed distribution unit.
6. Installation of one proposed hybrid cable.
The installation of the above -mentioned items was visually inspected and compared with the approved
construction drawings by CALTROP Corporation dated November 14, 2016. Based on these
observations and to the best of my knowledge and belief, the above -described construction of all
structural load -bearing components complies with the permitted documents.
Should you have any questions or wish to discuss any aspect of this letter, please do not hesitate to
contact the undersigned.
Sincerely,
APX Engineering Group, LLC
Michael A. Phillips, P.E.
Chief Engineer
Florida License 968312
Inspection Date: May 24, 2017
Saint Lucy County
Planning a& Development Services
Building & Code Regulation Division
2300 Virginia Avenue
Fort Pierce, FL 34982
ENGINEERING GROUP
Sect:
Permit:
Speciallnts ection Report 1 of 1 (Final)
S CL 1701=0193
Spnnt Site:
Site Address:
MI60XC24$=A(Midway Tower)
375 E Midway Read, Fort Pierce, FL 34982
APX Project:
17-0135.02
Dear Building Official:
APX Engineering Group, LLC (APX) performed observations of the Sprint telecommunication facility
located at the above -referenced site. The purpose of these observations was to inspect the fallowing:
1. Relocation of three existing antennas.
2. Installation of three proposedantennas.
3. Relocation of six existing Remote Radio Units (RRUs).
4. Installation of three proposed RRUs.
5. Installation of one proposed distribution unit.
6. Installation of one proposed hybrid cable_
The installation of the above -mentioned items was visually inspected and compared with the approved
construction drawings by CALTROP Corporation dated November 14, 2016. Based on these
observations and to the best of my knowledge and belief, the above -described construction of all
structural load -bearing components complies with the permitted documents.
Should you have any questions or wish to discuss any aspect of this letter, please do not hesitate to
contact the undersigned.
Sincerely,
APX Engineering Group, LLC
Michael A. Phillips, P.E.
Chief Engineer
Florida License #68312