Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORTBV SCABN1NED STRUCTURAL INSPECTION REPORT MM E N G IN E E R I N G, INC. St. Lucie CO o etct Number: 15-320 MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL. STRUCTURAL• SURVEYING . ENVIRONMENTAL Project Name: Treasure Cove Dunes 1835 20th Street . Vero Beach, FL 32960 772.569.0035 . Fax:772.778.3617 Inspection Date: 8/29/2017 www.mbveng.com Utl 728 Weather: Sunny Owner: Treasure Cove Dunes Permit #: Bldg 3: SLC 1702-0343 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 4100 N A1A, Bldg 3 Short Rails Qualified By: Rodolfo Villamizar, P.E. Catwa Iks343,341,333,331,323,321,313, Balcony #: 311,344(NW),334(NW) Discipline: —Spee:a-- ThFP9hA'a Type of Inspection:•` ' Partial Final n Demolition Post Tension Lock Out Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Structural Final Other (Use Additional member/Area Bek DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved EX Approved as Noted l Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Railing punch list inspection. VERBAL INSTRUCTIONS: Rail post of short rail by Unit 313 installed over hollow sounding concrete surface. GC to verify condition and complete the installation. NOTES: r\\1111 I11 /� f -Short-rails by Units 344(NW) and 334(NW) are still pending installation. North catwalk and NW short rails by Units 345, 335, 325, 324 and 314 are still pending installatiNsF L6STATEUJ— or; Zy FLOFt �0 INSPECTOR: Rodolfo Villamizor, P.E. 61000, 517021620 CERTIFIED BY: Rodolfo Villamizar, P. t18,� iMMBV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING . ENVIRONMENTAL 1835 20th Street . Vero Beach, FL 32960 772.569.0035 . Fax:772.778.3617 www.mbveng.com CA&3)28 Owner: Treasure Cove Dunes STRUCTURAL INSPECTION REPORT Project Number: 15-320 Project Name: Treasure Cove Dunes Inspection Date: 7/21/2017 Weather: Rainy Permit #: Blda 3: SLC 1702-0343 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 4100 N A1A, Bldg 3 Short Rails Qualified By: Rodolfo Villamizar, P.E. Catwa I ks343,341,333,331,323,321,313, Balcony#: 311,344(NW),334(NW) Discipline: Special T-'a Type of Inspection: InUmal Partial Final— °m;&pee4eri Post Tension Lock Out Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, HorizJ.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping a as Noted Metal Floor Metal Roof I IStructural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Pending Final etc. Attachments Wall Framing & Glazing *al Final Jse Additional member / Area Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Railing punch list inspection. VERBAL INSTRUCTIONS: Re -tighten wires as instructed. Caulk ends of �1to) III *i= ---Short-rails by Units 333, 323, 321, 313, 311, 344(NW) and are still inserts. ding installation. \\\ J\? =0; r. 5 .FLOE'-' V INSPECTOR: Rodolfo Villamizar, P.E. 61000, 517021620 CERTIFIED BY: Rodolfo Vi I r, .E. 1 0;l�ll�8m i=MBV ENGINEERING, INC. MOW BOWLS VILLAMIZ AR&ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL STRUCTURAL INSPECTION REPORT Project Number: 15-320 Project Name: Treasure Cove Dunes 1835 20th Street• Vero Beach, FL 32960 772.569.0035 . Fax:772.778.3617 Inspection Date: 6/16/2017 www.mbveng.com CA037n Weather: Sunny Owner: Treasure Cove Dunes Permit #: Bldg 3: SLC 1702-0343 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 4100 N A1A, Bldg 3 Railings Qualified By: Rodolfo Villamizar, P.E. 342(E),332(E),322 (E),312(E),335 (N E),32 Balcony#: 5(NE),315(NE) Discipline: -3pedal-- T''ncinmvhAld-'a Type of Inspection: Initial Partial Final mar Demolition Post Tension Lock Out Floor Slab (SOG) Reinforcing Steel Placement Floor Slab (SOG) Concrete Placement Elevated Slab Concrete Placement Elevated Slab Reinfor. Steel Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping re a as Noted Metal Floor Metal Roof I IStructural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Pending Final etc. Attachments Wall Framing & Glazing 'al Final Jse Additional member/Area Below) Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Railing punch list inspection. VERBALINSTRU NOTES: INSPECTOR: Rodolfo Villamizar, P.E. 61000, S17021620 . At ' i iT =c, ao. _� ; W= CC , �` i FL \\\ BY: Rodolfo Villamizar, P.E. 6 f066,'JS1 7021620 ,=MBV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR&ASSOCIATES CIVIL • STRUCTURAL • SURVEYING . ENVIRONMENTAL 1835 20th Street. Vero Beach, FL 32960 772.569.0035 . Fax: 772.778.3617 www.mbveng.com ( 93728 STRUCTURAL INSPECTION REPORT Project Number: 15-320 Project Name: Treasure Cove Dunes Inspection Date: 5/30/2017 Weather: Sunny Owner: Treasure Cove Dunes Permit #: Bldg 3: SLC 1702-0343 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 4100 N A1A, Bldg 3 Railings Qualified By: Rodolfo Villamizar, P.E. 343(E),333 (E),323(E),313 (E),344(E),334 Balcony #: (E),314(E) Discipline: Speeia! ThT m. ntd Type of Inspection: Partial Final— Rekspeet[an Demolition Metal Floor Decking Post Tension Lock Out Metal Roof Decking Floor Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Floor Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Slab Concrete Placement Structural Steel Connections Elevated Slab Reinfor. Steel Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Insulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. Cmu wall Erection/Placement, Fill Cell Rebar, Horiz J.R. IStucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Wall Sheathing, Blocking, Vapor Barriers, etc. Structural Final nterior Framing and Firestopping . X Other (Use Additional member / Area Belc POSITION OF INSPECTION (all pending inspections require a re -inspection) as Noted ADDITIONAL INFORMATION ON M Railing punch list inspection. VERBAL INSTRUCTIONS: Pending Rejected INSPECTED (From inspection items above): C4 �.O q . INSPECTOR: Rodolfo Villamizar,P.E. 61000, S17021620 CERTI IED BY: Rodolfo'Villdrwzl;a .E. 6 000} St 7021620 MBV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street . Vero Beach, FL 32960 772.569.0035 . Fax:772.778.3617 www.mbveng.com C .37B STRUCTURAL INSPECTION REPORT Project Number: 15-320 Project Name: Treasure Cove Dunes Inspection Date: 5/23/2017 Weather: Sunny Owner: Treasure Cove Dunes Permit #: Bldg 3: SLC 1702-0343 Contractor: Daniello and Associates Inspector: Rodolfo Villamizar, P.E. Project Address: 4100 N A1A, Bldg 3 Railings Qualified By: Rodolfo Villamizar, P.E. Balcony #: 331(S),331(SE),321(S),321(SE) Discipline: Speed— Threshold Type of Inspection: '—,.,:f,o''-' Partial —Final— Demolition Metal Floor Decking Post Tension Lock Out Metal Roof Decking Floor Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Floor Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Slab Concrete Placement Structural Steel Connections Elevated Slab Reinfor. Steel Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Insulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. Cmu wall Erection/Placement, Fill Cell Rebar, Horiz 1.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Wall Sheathing, Blocking, Vapor Barriers, etc. Structural Final Interior Framing and Firestopping X Other (Use Additional member/Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved Approved as Noted Pending Rejected ❑X ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Railing punch list inspection. VERBAL INSTRUCTIONS: NOTES: , %W l I 1111 ///, . e��', ZZ — INSPECTOR: Rodolfo Villamizar, P.E. 61000, 517021620 (CERTIFIED BY: Rodolfo Villamizar, P.Ej 61000, 517021620 1