Loading...
HomeMy WebLinkAboutGEOTECHNICAL REPORTSCANNED St. LucBY County REPORT OF GEOTECHNICAL EXPLORATION PROPOSED WATER TANK GROVE COMMUNITY ASSOCIATION 5614 TRAVELERS WAY FORT PIERCE, FLORIDA FOR GROVE COMMUNITY ASSOCIATION, INC. 5890 SOUTH US HIGHWAY 1 FORT PIERCE, FLORIDA 34982 19 91117.11 9-w71.111 NUTTING ENGINEERS OF FLORIDA, INC. 615 SW BILTMORE STREET PORT ST. LUCIE, FLORIDA 34983 ORDER NO.391.1 MAY 2016 �k�W115", a � � �.it @ G Nutting Geotechnnee i Construction Materials Engineering, Testing &Inspection Environmental Services EEngineers Offices throughout the state of Florida of Florida Inc. I Established 1967 YourProjectis Our Commitment www.nuttingengineers.com info@nuttingengineers.com Hutting e Engineers of Florida Inca Established 1967 Your Project is Our Commitment ai May 31, 2016 NMr—L-arry Allman Grove Community Association, hic. v 5890 South US Highway 1 E Fort Pierce, Florida 34982 o Phone: 772-401-7339 Email: grovecommunity@att.net w Subject: Report of Geotechnical Exploration Proposed Water Tank o Grove Community Association 5614 Travelers Way Q Fort Pierce, Florida -, 1310 Neptune Drive Boynton Beach, Florida 33426 561-736-4900 Toll Free: 877-NUTTING (688-8464: Fax: 561-737-9975 Broward 954-941-8700 St. Lucie 772-408-1050 Miami -Dade 305-557-3083 www.nuttingengineers.com 2 Dear Mr. Allman: m Nutting Engineers of Florida, Inc. (NE), has performed a Geotechnical Exploration for the v proposed water tank structure at the above referenced site in the Fort Pierce, Florida. This ~ exploration was performed in accordance with the written authorization to proceed provided by m Grove Community Association, Inc. dated May 19, 2016. This evaluation was performed to vdevelop information regarding subsurface soil conditions at specific test locations which along with proposed construction information provided were used to develop opinions regarding wproposed earthwork procedures and foundations for support of the proposed construction. This report presents our findings and recommendations based upon the information examined at the time of this evaluation. PROJECT INFORMATION ° We understand that plans include the construction of a new ground supported (at grade level) y water tank structure. The structure will hold approximately 200,000 gallons of water and will have an estimated diameter of 35 to 40 feet with a height of 25 to 30 feet. We were provided an 0 aerial indicating the general location of the tank. The tank is most likely to be designed as a mat slab shallow foundation system. The style of tank has yet to be fully determined (CROM type or other). V Y O F F I C E S Palm Beach - Miami -Dade St. Lucie `A Based on current site elevations, we estimate that approximately one to two feet of fill may be required to bring the site up to construction grade; however, the final site elevation shall be determined by a professional architect, civil engineer, or other qualified party. NE should be notified in writing by the client of any changes in the proposed construction along with a request to amend our foundation analysis and/or recommendations within this report as appropriate. GENERAL SUBSURFACE CONDITIONS Soil Survey Maps As part of the geotechnical exploration, we have reviewed available Soil Conservation Service (SCS) survey maps for St. Lucie County. These SCS maps provide qualitative information about potential general shallow soil conditions in the project vicinity. This information was derived from approximately 6 ft. deep manual auger borings, aerial photo and surface feature interpretation at some point in the past (mid 1980's to early 1970's). The SCS data may or may not reflect actual current site conditions. A review of the Soil Survey for St. Lucie County revealed that at the time the survey was conducted, the soils at the site were described as Chobee Loamy Sand, Depressional. The Chobee series consists of very poorly drained, nearly level soil in small to large depressional areas. These soils formed in unconsolidated, moderately fine marine sediment. In general the subsoils consists of dark gray to black loamy sand to sandy clay loam from the ground surface to a depth of approximately six feet or more. We note that the soil surveys were typically penetrated to a depth of approximately six feet. Subsurface Exploration NUTTING ENGINEERS OF FLORIDA, INC. was requested to perform three Standard Penetration Test (SPT) borings (ASTM D-1586) to depths of thirty to forty feet below land surface as indicated in the foundation plan provided to our office. The locations of the test borings are indicated on the boring location plan presented in the Appendix of this report. The boring locations were identified in the field using approximate methods; namely, a measuring wheel and available surface controls. As such the soil boring locations should be considered to be approximate. Test Boring Results In general, the soil boring locations revealed a surface layer of loose brown to gray silty sand in the upper four to five feet, underlain by medium dense to dense gray silty sand to gray clayey sand to a depth of thirteen to fifteen feet. Below the clayey sand soils very loose to medium dense brown to tan sand was encountered to a depth of forty feet, the maximum depth explored. - Please see the enclosed soil classification sheet in the Appendix of this report for additional Nutting Engineers 3 of Florida Inca Established 1967 NOTICE OF COMMENCEMENT N Permit No. N )° - 02 to-� . Tax Folio No. ,/() �-- f1� - 0S:: • Q 3. (� /" State of Florida County of St. Lucie The undersigned hereby gives notice that improvement will be made to certain real property, and in the following information is provided in this Notice ofCommencemt WHITE CITY S/D 10 36 40 FROM 31 E 1075.g5 FT FOR POB,TH Nt Legal Description of Property: (and General description Owner Informs}ion or U Name �28Yc Address 59?40_ S 99 5! e) (OR OATa1L PT- A, _"i• if the Lessee contracted for the improvement: Interest in property: Name and address of fee simple titleholder (if different from Owner listed above): 1. Florida Statutes, 0124 13E 7A t1i� n Contractor's Name: j'LOJ6AJk 97t,1457' Contractor Address: JV71,1 MW hAkA A-r V ii Phone Number: a(o% g 4"'twD ,664M AATOdJ, & 5g4451 Surety (if applicable, a copyof the paymentbond is attached): Amount of bond:$ Name and address: Phone number: a o n_ M A m M. Lender Name: Phone Number: o N c = Lender's address: o m a u�a0 Persons within the State of Florida designated by owner upon whomnotices or other. documents may be served as provided by Se; y o y o ON�yn 713.13(1)(a)7.,.Florida Statutes: N o < m Name: Phone Number: v x N Address: 0 ,� N In addition to himself or herself, owner designates of to receive a copy zi _ S m On Uenors Notice as provided in Section 713:13(1)(b), Florida Statutes. ��5 ` Phone number of person or entity designated by owner: e 0 Expiration date of notice of commencement: (the expiration date may not be before the completion of construction and final paymer z n 0 p contractor, but will be 1 year from the date of recording unless a different date is specified) ~ WARNING TO OWNER: ANY PAYMENTS MADE BYTHE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CON - IMPROPER PAYMENTS UNDER CHAPTER 713, PART (,SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE I _ _- IMPROVEMENTSTOYOURPROPERTY.A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ONTHEJOBSITEBEFOREI INSPECTION. IFYOUINTENDTO OBTAIN FINANCING, CONSULT WITH YOUR LENDER ORAN ATTORNEY BEFORE COMMENCING WORK RECORDING YOUR NOTICE OF COMMENCEMENT. c� Under penalty of perjury, I declare that I have read the foregoing notice of commencement and that the facts stated therein are true to the best of The foregoing instrument was acknowledged before me this S' day of J A IJ. , 2d%, //// / /q By �DU�iE /1FSMDVt% as VIGC!/1`65 for A-005 (G�drAUvi z/ �Ssc�i Namme of Persrson�� ;cn� Type of authority (e.g.officegtrustee) Party on behalf of whom instrument was executied NORA MAE ROSCCi91n Ily known Vor produced Identification_ (Signature of Notary Public -State of Florida) ; 1 MY COMMISSION t1FF096482 (Print, Type, or5tampCommissioned Name of No rµ7 ', EXPIRES June 17, I Identificationproduced JOSEPH E. SMITH, CLI _ OF THE CIRCUIT COURT - SAINrrUCIE COUNTY FILE # 4270064 OR BOOK 3955 PAGE 2772, Recorded 01/25/2017 10:27:58 AM NOTICE OF COMMENCEMENT r r� 1�►a D ta�. --SUS-p3:��p3Q- 7� PermitNo. Tax Folio No._3%/Q State of Florida County of St. Lucie The undersigned hereby gives notice that improvememwill be made to certain real property, and in accordance vdth Chanter 7I3. Florida Statutes, the following Information is provided in this Notice of Commencemr WHITE CITY SID 10 36 40 FROM SW COR OF LOT 253 RUN N 0124 31 E 1075.85FTFOR POD TH N 001122 W 250 FT, TH N 89 52 13 E Pro 30o FT,THS 00 00 13 E 167.90 FrTH S 893947 W 7.73 FT TO PC OF Legal Description p of Property-. (and street address If available): "CURVE CONC SELY,R OF 137 FT AND CA 66.40 38,TH ALG ARC Generaldestrintionofimorovement: 6/%A7'6/G YLAn7T Kc/SLA.LE.L+f.t$ 6a CvLtAvA wS7"4ePJ4.66 /AJV/t. Owner fnformdtton or less%e information H the Lessee contracted for the Improvement: Name 20Y6 NNQ,fi ,71! .(5M tLk Address .5A90�E[:ee!E Fr 3etq Interest In property: Name and address of fee simple titleholder (if different from Owner listed above): o cn, m = rn�cm f �f Contractors Name: )' LOB/AR f[ 1• (Lr L/ LO,US/ b% /N 2 M 9 `c5 Contractor Address: N7.� 2 YAJ aA gT6AU �i/ D Phone Number: / 9 -AVOO es BOa f ,EAT6.V, � 8356j N v = = M z �= Surety (If applicable, a copy of the payment bond is attached): Amount of bond: $. ,`�� rn m 9 a Name and address: Phone number. n< o n. n a Lender Name: Phone Number. c' v -fit Lenders address: < _ a � N Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by section ;vs 713:13(1)(a)7., Florida. statutes: m v Name: Phone Number: In addition to himself or herself, Owner designates of Uenors Notice as provided in Section 713:13(1)(b), Florida Statutes. -Phone number of person or entity designated by owner to receive a copy 'Expiration date of notice of commencement: (the expiration date may not be before the completion of construction and final payment to the. contractor, but will be 1 year from the date of recording unless a different date Is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE E OmATiON OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, ANDCAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE 1011 SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under penalty of perjury, I declare that) have read the foregoing notice of commencement and that the facts stated therein are true to the best of The foregoing instrument was acknowledged before methis aSS dayof D_AO , 20'7, By ,Gayy-ig D/ SMo,yo as ✓f� 1ip&� for AOVv5«,rrzi firs >n Name of Persoonn.7� _ - Type of authority(e.g.of0certrustee) Party on behalf of whom lnstrumem was e,ecutie 7( 'Z' / �CR.P �-rGl.�cL y`.je-•"Yr, NORA MAE ROSOMMIlly knownar produced IdentiRwtion__(Signature of Notary Public -State of Florida) {//�J�• MY COMMISSION OFF0(Print, Type, or Stamp Commissioned Name of No r i r) EXPIRES Juno 17, �YPfl�dentification produced important information regarding these descriptions, the field evaluation and other related information. Note: Substantially different subsurface conditions may exist at other areas of the site. Buried debris may or may not be identified or adequately delineated by soil borings. Test pit excavation can provide more insight into such conditions and rock lithology if present. Such conditions may be revealed during site development activities (e.g. proof rolling, utility & foundation excavation activities) or other related activities. Should additional assurance be desired by the client, further subsurface investigation could be performed. Groundwater Information The immediate groundwater level was measured at the boring locations at the time of drilling. The groundwater level was encountered up at depth of three and a half feet below the existing ground surface at the time of drilling. The immediate depth to groundwater measurements presented in this report may not provide a reliable indication of stabilized or more long term depth to groundwater at this site. Water table elevations can vary dramatically with time through rainfall, droughts, storm events, flood control activities, nearby surface water bodies, tidal activity, pumping and many other factors. For these reasons, this immediate depth to water data should not be relied upon alone for project design considerations. ANALYSIS AND RECOMMENDATIONS Storage Tank Analysis The borings performed for the proposed construction revealed loose silty sand in the upper five feet, underlain by medium dense to dense silty or clayey sand to a depth of thirteen to fifteen feet. Below fifteen feet very loose to medium dense sand was encountered to a depth of forty feet, the maximum depth explored. We performed a settlement analysis based on conventional compaction and construction methods. Based on the underlying soil conditions our results indicate that as long as total settlements on the order of approximately one to two inches are acceptable, the tank may be supported on a shallow foundation system once an intense compaction procedure is implemented. Based on similar tank construction, we anticipate that Us is acceptable. Once the site has been prepared in accordance with our site preparation recommendations presented in this report, the proposed water storage tank may be supported on a shallow foundation system using an allowable bearing pressure of 2,000 pounds per square foot. Once plans are more finalized for the proposed construction, we should review the plans to determine whether additional details or changes to our recommendations are warranted. Nutting E Engineers 4 of Florida Inc I Established 1967 Based on the soil boring information and the project information provided we have calculated that a modulus of subgrade reaction (k-value) of 175 pounds per cubic inch (Pei) may be used for the design of the shallow foundation. If footings are part of the tank design, we recommend a minimum width of 24 inches for continuous footings and 30 inches for individual footings, even though the soil bearing pressure may not be fully developed in all cases. We recommend that the bottom of footings be at least 12 inches below the lowest adjacent finished grade. Settlement Evaluation — Storage Tank We have compared the field test data obtained in this exploration with our experience with similar structures and empirical —relationships for bearing and settlement. Using a bearing pressure on the order of 2,000 sf e have estimated that the total settlement of the tank will be on the order of approximately two inches. This settlement is primarily the result of elasto-plastic compression of the upper sandy soils and most of this settlement should occur upon the filling of the tank. Distortions that occur along the wall footings due to differential settlement should not be more than 1 in 500. Site Preparation The surfrcial organic soils, wood and tree debris, tree root balls, and any'unsuitable soils as determined by the Geotechnical Engineer will need to be completely removed within the construction area and to a lateral distance of at least 5 feet beyond the footprint limits and potentially further based upon depth. A Nutting Engineer's representative should be present to observe that the stripping operations are performed as we have discussed herein. For the tank slab and foundations, the foundation and slab area should be excavated and the footings formed. Upon approval by the geotechnical engineer, the stripped surface should then be thoroughly soaked with water and compacted with at least 20 overlapping passes of a vibratory compactor having a minimum dynamic force of 10 tons operated no faster than at a slow walking pace. The roller coverage's should be equally divided into two perpendicular directions. The compaction operations must be observed by a representative of Nutting Engineers. In addition, the surface should also be com acted until a density equivalent to at least 98 erce offthe modified Proctor maximum dry density (ASTM D=155i7i) achieved to a depth of at least Nutting Engineers 5 of Florida Inch Established 1967 Any structural fill needed to bring the site to construction grade may then be placed in lifts not exceeding twelve inches in loose thickness. Each lift should be thoroughly compacted until densities equivalent to at least 98 percent of the modified Proctor maximum dry density are uniformly obtained. Fill should consist of granular soil, with less than 10% passing the No. 200 sieve, free of rubble, organics (5% or less) clay, debris and other unsuitable material. The fill should have ASTM designation (D-2487) of GP, GW, SP, or SW, with a maximum particle size of no more than 3 inches or as otherwise approved by Nutting Engineers. The bottom of foundation excavations should be compacted after excavation to develop a minimum density requirement of 98 percent of the modified Proctor maximum dry density (ASTM D-1557) is achieved to a depth of at least two (2) feet below the bottom of the footing depth, as determined by field density compaction tests. GENERAL INFORMATION Our client for this geotechnical evaluation was: Mr. Larry Allman Grove Community Association, hic. 5890 South US Highway 1 Fort Pierce, Florida 34982 The contents of this report are for the exclusive use of the client and the client's design team for j this specific project exclusively. Information conveyed in this report shall not be used or relied upon by other parties or for other projects without the expressed written consent of Nutting Engineers of Florida, Inc. This report discusses geotechnical considerations for this site based upon observed conditions and our understanding of proposed construction for foundation support. Environmental issues including (but not limited to), soil and/or groundwater contamination, and other environmental issues are beyond our scope of service for this project. As such, this report should not be used or relied upon for evaluation of environmental issues. Prior to initiating compaction operations, we recommend that representative samples of the structural fill material to be used and acceptable in -place soils be collected and tested to determine their compaction and classification characteristics. The maximum dry density, optimum moisture content, gradation and plasticity characteristics should be determined. These tests are needed for compaction quality control of the structural fill and existing soils, and to determine if the fill material is acceptable. If conditions are encountered which are not consistent with the findings presented in this report, or if proposed construction is altered or moved from the location investigated, this office shall be Nutting E Engineers 6 of Florida Inca Established 1967 notified immediately so that the condition or change can be evaluated and appropriate action taken. The vibratory compaction equipment may cause vibrations that could be felt by persons within nearby buildings and could potentially induce structural settlements. Additionally, preexisting settlements may exist within these structures that could be construed to have been caused or worsened by the proposed vibratory compaction after the fact. Pre- and post conditions surveys of these structures along with the vibration monitoring during vibratory compaction could be performed to better evaluate this concern. The contractor should exercise due care during the performance of the vibratory compaction work with due consideration of potential impacts on existing structures. If potential vibrations and impacts are not considered tolerable, then alternate foundation modification techniques should be considered. Nutting Engineers of Florida, Inc. shall bear no liability for the implementation of recommended inspection and testing services as described in this report if implemented by others. Nutting has no' ability to verify the completeness, accuracy or proper technique of such procedures if performed by others. Excavations of five feet or more in depth should be sloped or shored in accordance with OSHA and State of Florida requirements. The Geotechnical Engineer warrants that the findings, recommendations, specifications, or professional advice contained herein, have been presented after being prepared in accordance with general accepted professional practice in the field of foundation engineering, soil mechanics and engineering geology. No other warranties are implied or expressed. We appreciate the opportunity to provide these services for you. If we can be of any further assistance, or if you need additional information, please feel free to contact us. Sincerely, NUTTING ENGINEERS OF FLORIDA, INC. Richard C. Wohlfarth, P.E. Director of Engineering Appendix: Boring Location Plan Test Boring Results Limitations of Liability Soil Classification Criteria REP GROVE COMMUNITY 200K GAL TANK FT PIERCE CEG Nutting Engineers of Florida Inca Established 1967 E. k i n � ' ^ � ate•• -' - -Pw+3 .. Tom'- _ -t ..a�.y( a f f` • �+tikJ y,lw t `T�"` 1 ,♦ �r 1 e, 1 J _• • l �. w .. k ilo_ M Y k ail: .41 4++ `a :...ter' A �r •. i'- — ;n201,5.kGoo9lID fi w k 4 ri 70 I - NUttltly 1310NeptuneDrive BORING NUMBER B-1 EagincFta qp Boynton Be' T, 33426 PAGE 1 OF 1 eeer Telephone: .'736-4900 1j"sTa .,R"-trrjE brai iw Fax: 561-737-9975 rmkR pu=tm mm r PROJECT NUMBER 391.1 CLIENT Grove Community Association, Inc. PROJECT NAME Proposed Water Tank PROJECT LOCATION 5614 Travelers Way, Fort Pierce Florida DATE STARTED 5/31/16 COMPLETED 5/3V16 SURFACE ELEVATION REFERENCE ^-1'-2' below Road Crown DRILLING METHOD Standard Penetration Boring GROUND WATER LEVELS: LOGGED BY D. Tyson CHECKED BY C. Gworek -AT TIME OF DRILLING 3.5 ft APPROXIMATE LOCATION OF BORING As located on site plan w ♦ SPT N VALUE UP4 10 20 30 40 PL MC LL I— • I a z a p MATERIAL DESCRIPTION P' Wj Blows ° WQ'-' z 20 40 60 80 ❑ FINES CONTENT (%) ❑ V' 0 m 20 40 60 80 Gray fine silty SAND SS 1 1-2-3-3 5 ♦ i SS 3-4-4-5 8 :S ♦: 2 8 19-14-18-20 32 5 Brown fine SAND S4 10-8-8-7 16 i i ♦ `. 6 6-5-4-4 9 Gray silty fine SAND i 10 SS 6 4-3-6-9 9 7S 4-1-1 2 Dk brown fine SAND 15 i Lt. brown fine SAND SS 8 3-4-4 8 i 20 i i L SS 4-5-6 11 25 7 9 i u e ♦ ' 10 5.7-7 14 u 30 z Bottom of hole at 30.0 feet. Y a z i n L Disclaimer Nutting Engineers of Florida Inc accepts no liability for the consequences of the independent interpretation of drilling logs by others. 1310 Neptune Drive BORING NUMBER B-2 NUM119 '; �^�e` Boynton Bt, L, 33426 PAGE 1 OF 2 EfIgeers Telephoner f7364900 B rD1.`�} anawxuyjxbUllvdis Fax: 561-737-9975 1r,wPxkabO c.?r.M PROJECT NUMBER 391.1 CLIENT Grove Community Association, Inc. PROJECT NAME Proposed Water Tank PROJECT LOCATION 5614 Travelers Way, Fort Pierce, Florida DATE STARTED 5/3V16 COMPLETED 5/31/16 SURFACE ELEVATION REFERENCE -1'-2' below Road Crown DRILLING METHOD Standard Penetration Boring GROUND WATER LEVELS: LOGGED BY D. Tyson CHECKED BY C. Gworek aAT TIME OF DRILLING 3.5 ft APPROXIMATE LOCATION OF BORING As located on site plan w ♦ SPT N VALUE p � r, v 10 20 30 40 PL MC LL a w o. O MATERIAL DESCRIPTION a Blows > o 0 z 20 40 80 ❑ FINES CONTENT (OA) ❑ 0 20 40 60 80 Brown silly fine SAND SS 1 1-1-1-2 2 2S 3-4-5-6 9 Isz SS-9-12-16 3 21 5 Brown slightly silty fine SAND SS 4 12-9-8-8 17 ♦: Brown clayey fine SAND SS 5 9-10-10-11 20 10 ' Brown silty fine SAND SS ' 6 7-8-8-8 16 A ♦' SS 7 7-5-3 8 15 Tan fine SAND SS 8 3-5-6 11 20 .'. :♦ SS 9 6-5-7 12 25 r `• SS 10 5-7-9 16 30 SS 11 9-12-14 26 35 (Continued Next Pagge Disclaimer Nutting Engineers of Florida Inc accepts., Iia ility for the consequences of the independent interpretation of drilling logs by others. F a u 1310 Nephma)rive _ BORING NUMBER B-2 Wuti_ing ',FI., Boynton Be" 33426 ��Ilnecrs Yp PAGE 2 OF 2 rDtae 6 Telephone:, .'736-0900 - ' avmorjtr:wd,�a asp Fax: - 561-737-9975 reu�roktt�amccmm�wm. PROJECT NUMBER 391.1 CLIENT Grove Community Association, Inc. PROJECT NAME Proposed Water Tank PROJECT LOCATION 5614 Travelers Way, Fort Pierce Florida w ♦ SPT N VALUE c7 N. m 10 20 30 40 PL MC LL = c x o n. o MATERIAL DESCRIPTION w Blows �' ov �J z 20� 40 60 80 ❑ FINES CONTENT 0A) ❑ 35 20 40 60 80 Tan fine SAND ilcontlnued) A SS 12 10-10.15 25 Brown medium SAND 40 ;' i i i i i i i i Bottom of hole at 40.0 feet. Disclaimer Nutting Engineers of Florida Inc amepts no liability for the consequences of the independent interpretation of drilling logs by others. Ncnu!itlrrolig 1310NeptBoynton fneDriv BORING NUMBER B-3 33426 Engo��ers Telephone; .A736-4900 PAGE I OF ,. ��yy mnoM1talnc;rnWGhN rso Fax: 561-737-9975 v .v o c�mrm. r PROJECT NUMBER 391.1 CLIENT Grove Community Association, Inc. PROJECT NAME Proposed Water Tank PROJECT LOCATION 5614 Travelers Way, Fort Pierce, Florida DATE STARTED 5/31/16 COMPLETED 5/31/16 SURFACE ELEVATION REFERENCE —1'-2' below Road Crown DRILLING METHOD Standard Penetration Boring GROUND WATER LEVELS: LOGGED BY D. Tyson CHECKED BY C. Gworek QAT TIME OF DRILLING 3.5 ft APPROXIMATE LOCATION OF BORING As located on site elan W ♦ SPT N VALUE 0 a W „ 10 20 30 40 PL�MC_�L lEgLu aQ O MATERIALDESCRIPTION a Blows [L --� z 20 40 60 80 ❑ FINES CONTENT W ❑ 0 20 40 60 80 Brown silty fine SAND SS 1 1-1-2-2 3 2 2 2-3-4-5 7 SZ i I 5 Gray slightly silty fine SAND SS 3 7-8-9-10 17 SS 4 8-9-10-10 19 i i Brown clayey fine SAND 5 5 7-7-8-9 15 i ♦ i 10 I SS 6 6-6-7-8 13 i ♦ i Brown silty fine SAND '• i► 5-5-6 11 i 15 7 7 Brown medium SAND i SS 8 4-4-5 9 `. Ii 20 i i i i SS 9 4-5-6 11 25 .'. i i i SS 10 5-5-6 11 r 30 y ' Bottom of hole at 30.0 feet. i 0 i i r Disclaimer Nutting Engineers of Florida. Inc. accepts no liability for the consequences of the independent interpretation of drilling logs by others. LIMITATIONS OF LIABLILITA WARRANTY We warranty that the services performed by Nutting Engineers of Florida, Inc. are conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession in our area currently practicing under similar conditions at the time our services were performed. No other warranties, expressed or implied, are made. While the services of Nutting Engineers of Florida, Inc. are a valuable and integral part of the design and construction teams, we do not warrant, guarantee or insure the quality, completeness, or satisfactory performance of designs, construction plans, specifications we have not prepared, nor the ultimate performance of building site materials or assembly/construction. SUBSURFACE EXPLORATION Subsurface exploration is normally accomplished by test borings; test pits are sometimes employed. The method of determining the boring location and the surface elevation at the boring is noted in the report. This information is represented in the soil boring logs and/or a drawing. The location and elevation of the borings should be considered accurate only to the degree inherent with the method used and may be approximate. The soil boring log includes sampling information, description of the materials recovered, approximate depths of boundaries between soil and rock strata as encountered and immediate depth to water data. The log represents conditions recorded specifically at the location where and when the boring was made. Site conditions may vary through time as will subsurface conditions. The boundaries between different soil strata as encountered are indicated at specific depths; however, these depths are in fact approximate and dependent upon the frequency of sampling, nature and consistency of the respective strata. Substantial variation between soil borings may commonly exist in subsurface conditions. Water level readings are made at the time and under conditions stated on the boring logs. Water levels, change with time, precipitation, canal level, local well drawdown and other factors. Water level data provided on soil boring logs shall not be relied upon for groundwater based design or construction considerations. LABORATORY AND FIELD TESTS Tests are performed in general accordance with specific ASTM Standards unless otherwise indicated. All criteria included in a given ASTM Standard are not always required and performed. Each test boring report indicates the measurements and data developed at each specific test location. Nutting i:nginnKs Your Protect is 0ur Cemmitmem ANALYSIS AND RECOMMENDATIONS The geotechnical report is prepared primarily to aid in the design of site work and structural foundations. Although the information in the report is expected to be sufficient for these purposes, it shall not be utilized to determine the cost of construction nor to stand alone as a construction specification. Contractors shall verify subsurface conditions as may be appropriate prior to undertaking subsurface work. Report recommendations are based primarily on data from test borings made at the locations shown on the test boring reports. Soil variations commonly exist between boring locations. Such variations may not become evident until construction. Test pits sometimes provide valuable supplemental information that derived from soil borings. If variations are then noted, the geotechnical engineer shall be contacted in writing immediately so that field conditions can be examined and recommendations revised if necessary. The geotechnical report states our understanding as to the location, dimensions and structural features proposed for the site. Any significant changes of the site improvements or site conditions must he communicated in writing to the geotechnical engineer immediately so that the geotechnical analysis, conclusions, and recommendations can be reviewed and appropriately adjusted as necessary. CONSTRUCTION OBSERVATION Construction observation and testing is an important element of geotechnical services. The geotechnical engineer's field representative (G.E.F.R.) is the "owner's representative" observing the work of the contractor, performing tests and reporting data from such tests and observations. The geotechnical engineer's field representative does not direct the contractor's construction means, methods, operations or personnel. The G.E.F.R. does not interfere with the relationship between the owner and the contractor and, except as an observer, does not become a substitute owner on site. The G.E.F.R. is responsible for his/her safety, but has no responsibility for the safety of other personnel at the site. The G.E.F.R. is an important member of a team whose responsibility is to observe and test the work being done and report to the owner whether that work is being carried out in general conformance with the plans and specifications. The enclosed report may be relied upon solely by the named client. OIL AND ROCK CLASSIFICATION CRI',, ..!A SAND/SILT CLAY/SILTY CLAY N-VALUE (bpO RELATIVE DENSITY 0-4 Very Loose 5- 10 Loose 11-29 Medium 30-49 Dense >50 Very dense 100 Refusal ROCK N-VALUE (bpf) UNCONFINED COMP. STRENGTH(tst) CONSISTENCY <2 <0.25 v. Soft 2-4 0.25-0.50 Soft 5-8 0.50 - 1.00 Medium 9-15 1.00-2.00 Soft 16-30 2.00-4.00 v. Stiff >30 >4.00 Hard N-VALUE (bpt) RELATIVE HARDNESS ROCK CHARACTERISTICS N> 100 Hard to v. hard Local rock formations vary in hardness from soft to very hard vithin short verti- cal and horizontal distances and often contain vertical solution holes of 3 to 36 inch diameter to varying depths and horizontal solution features. Rock may be brittle to split spoon impact, but more resistant to excavation. 25<N < 100 Medium hard to hard 5<N <25 Sof[ to medium hard PARTICLE SIZE Boulder >12 in. Cobble 3 to 12 in. Gravel 4.76 nun to 3 in. Sand 0.074 mm to 4.76 mm Silt 0.005 min to 0.074 min Clay <0.005 mm DESCRIPTION MODIFIERS 0-5% Slight trace 6-10% Trace 11-20% Little 21-35% Some >35% And Major Divisions Group Symbols Typical agmee Labgrafory classification criferia : �en (D_0 ') _9 GW well -graded gmeh, gravelsand E Ca = greater flan 4; Ca = benreenl and3 = mixer ,altle °. no (Inca ° a - Dta D1orOW GP Poorly graded grovel;gravelsand seixNrey Kill. or me fire Not meeting all gradation requirements for GW 8 a _ o _ d O`Z a r _- - Gw• Silly graveb,9mval-eand-sill _ e a us AOerberg limibbelow •q• u 5 `u mixmro n line or P.J.less than 4 Above 'A" lino wish P.I. 3- F c E between 4 and ] are border. a _ a a E L firms can'squirin9 use °t $ 'a a' o GC Ci,a, 9rweb, 9ra+els°nd-clay mixtures U U b = Anerber9limits above •A' one PJ. than ] dwl symbol,. o a t5 m i F y =. wish greater 5- = sw well.gradad sandy gravelly sands, O g (D;n)' Ce= n greaterdan6;C,= benmenland3 m-us "a °• i u c ? e_ little ar no fine. m'9� Dia Dla-rDm sF Poorlly graded sands, gravelly m m rs - _ - and,gnle or no fines - a °-° goj Not meeting all gradation requirements for SW c .5 -y° °c sM• Silty, sand,,,and.,in mixtures Atterberg limits below •A' ° n ° c n y p F d = _ _ - - L foe or PJ. less than 4 omits planNg in hatched ..no r o S o o E � B: o with PJ. between 4 and ] ore berecterrinquiring me S E SC Clayey sands, sand day mixturm o .� o Atterberg limits above •A" auolroaem.casea line with P.I. more than ] Inorganic LIB and very fine sands, ML rack Pa., silty or dayoy fine a ands or dare, Lib wilh slight Plasticity 60 ei Inorganic days of law to medium sa - oCL Picalk , gravelly days, sandy, . F day, silly days, Ivan days d ? ell OL Organic 11H and organic sat, days of law Plaslicily Inoranc sls, micaeove or dioloo. e off.1. ¢ -- MH ro fine sandy ar silty sail, elmastic Q, - ultsIf o W a c m E CH Inerg°nc days or high PhsAficfat y, 10 H up days E ML endoL 1+ OH day, of medium l° high meOr,mme 0 30 ell 50 60 70 00 90 100 - j Pla9ids,°rganle silo 0 10 20 t9°td 11.1 s a - - PT Peat and other highly organic soils = Plaslicily Chart o Engineers Emulling �E regoneers -1•