Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
IMPACT FEE
Byn Mawr Summary BUliimgA Building B Building C TOTAL Surface Spall $912.45 $1,624.24 $3,197.92 Paint $294.11 $205.80 $476.51 Deck Coating $885.38 $585.00 $1,641.83 Bottom Track $201.18 $59.48 SCANNED BY Stucco Repair $27.75 St. Lucie Countv Waterproofing $1,144.36 $15.98 $185.13 Post $540.00 $3,240.00 Top cap $583.50 NOC $13.00 $13.00 $13.00 Permit $360.54 $360.53 $360.53 Mobilization $1,500.00 $1,500.00 $1,500.00 Concrete Repairs $11,751.45 $4,572.00 $7,359.59 TOTAL CO & Concrete Repairs $17,090.22 $9,476.03 $18,558.01 $45,124.26