Loading...
HomeMy WebLinkAboutINSPECTION REPORTr M L Engineering, Inc. Proje:. :o. 17-139A Report No.1 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37° Avenue /+ p1n1�r� Chris Arias Daniello Const. Vero Beach, Florida 32960 SCANNED Carl Peterson SLC Bldg Dept Phone (772) 569-1257 BY File Fax neeri gine.c 41 St. Lucie Countv mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A DATE: July 12, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Unit 402 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Unit 403 The delaminated stucco on the ceiling has been removed. We discovered there are no spalls in the concrete. The area shall be patched with new stucco and feathered to match the surrounding areas. Estimated total area of stucco repair is three (3) square feet. Units 601, 603 & 604 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. Further demolition at Unit 603 is required to expose the corrosion and clean the bars. The other spalled areas' reinforcing have minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repairs is ten (10) square feet. Unit 804 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. The existing reinforcing top bars have minimal concrete coverage and may be the reason for the spalling. We _recommend tying the top bar to the bottom bar to provide more clearance from the top of slab. Estimated total area of repairs is seven and one-half (7.5) square feet. JUL 1 9 i1ECD M L Engineering, Inc. Consulting Engineers 2030 371h Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringine.com Proje.:. � o. 17-139A Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. Pic 3 Unit 403 ceiling 2 JUL 1 9 RECD ,;r \ M L Engineering, Inc. Project No. 7-139A Report No. 3 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringine.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A DATE: July 26, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at balconies. OBSERVATIONS: Unit 301— West balcony Demo of all loose concrete is complete. The reinforcing bars have surface corrosion and will require power tool cleaning and priming. The top bars were found to have less than 1" of concrete coverage. Estimated total area of repair is One (1) square foot. Unit 302 — East Balcony Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is three (3) square feet. Unit 306 — East Balconv Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is four (4) square feet. It-2. Lu6,`P:E. T i'QQ FL C) •�c :e •'.. M L Engineering, Inc. Consulting Engineers 2030 37i° Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 5694041 mlengineeringinc.com Pic 1 Unit 302 surface spall Project No. 17-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File 2 M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 ralengineeringinc.com Project No..t7-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: July 26, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at balconies. OBSERVATIONS: Unit 301— West balconv Demo of all loose concrete is complete. The reinforcing bars have surface corrosion and will require power tool cleaning and priming. The top bars were found to have less than 1" of concrete coverage. Estimated total area of repair is One (1) square foot. Unit 302 —East Balconv Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is three (3) square feet. Unit 306 — East Balconv Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is four (4) square feet. F e r M. Lurq . t •r: � �G M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc.com Pic 1 Unit 302 surface spall Project No.17-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Pic 2 Unit 306 surface spall v M L Engineering, Inc. Consulting Engineers 2030 371° Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc.com Project No. 17-139A Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc., INSPECTED BY: Mike Lue DATE: July 18, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. X 1IR MR AWN )1I8)z69I Unit 301/302 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Column snall A 3rd floor walkway stair door The loose concrete has been removed and reinforcing exposed. The bars are in serviceable condition and will require cleaning and priming. The metal doorjamb has some surface corrosion and shall be cleaned as well. The door frame and opening shall be sealed after repairs ar Pic 1 Unit 3 01/3 02 walkway .•• to �1(HOlY y ••, Pic 2 Column spall @ stair door w M L Engineering, Inc. Project No. 17-139A Report No. 2 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37 ° Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Cut Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772) 569-4041 mlengineeringinacom BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A DATE: July 18, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Unit 3 01/3 02 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Column spall P. 3`d floor walkway stair door The loose concrete has been removed and reinforcing exposed. The bars are in serviceable condition and will require cleaning and priming. The metal doorjamb has some surface corrosion and shall be cleaned as well. The door frame and opening shall be sealed after repairs rit Pic 1 Unit 301/302 walkway Pic 2 Column spall @ stair door M L Engineering, Inc. Consulting Engineers 2030 371h Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 569-4041 mlengineeringinc.com Project No. 17-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: July 26, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at balconies. . OBSERVATIONS: Unit 301— West balcony Demo of all loose concrete is complete. The reinforcing bars have surface corrosion and will require power tool cleaning and priming. The top bars were found to have less than I" of concrete coverage. Estimated total area of repair is One (1) square foot. Unit 302 — East Balcony Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is three (3) square feet. Unit 306 — East Balcony Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is four (4) square feet. Y •• G F aSy2�..�a F�.C) fie SSIOtSP; •`` �nann`� [ECDIF0VM OCT - 9 RECD 10 M L Engineering, Inc. Consulting Engineers 2030 371° Avenue Vero Beach, Florida 32960 Phone(772) 569-1257 Fax (772)569-4041 mlengineeringinc.com Project No. 17-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Pic 2 Unit 306 surface spall OCT - 9 FED 2 M L Engineering, Inc. Project No. 17-139A Report No. 2 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 371° Avenue Chris Arias Daniello Coast Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772) 569-4041 mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: July 18, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Unit 301/302 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool.cleaning and printing. Estimated total area of repair is five (5) square feet. Column sDall (a, 3`d floor walkway stair door The loose concrete has been removed and reinforcing exposed. The bars are in serviceable condition and will require cleaning and priming. The metal doorjamb has some surface corrosion and shall be cleaned as well. The door frame and opening shall be sealed after repairs Fri Pic 1 Unit 301/302 walkway F ia*2.Lu$ E. . :,�A,po Pic 2 Column mall @ stair door [ECEO E OCT — 9 REcl) M L Engineering, Inc. Projr e .do. 17-139A Report No. 1 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37a Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772) 5694041 mlengineeringine.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — Bldg. A DATE: July 12, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways OBSERVATIONS: Unit 402 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Unit 403 The delaminated stucco on the ceiling has been removed. We discovered there are no spalls in the concrete. The area shall be patched with new stucco and feathered to match the surrounding areas. Estimated total area of stucco repair is three (3) square feet. Units 601. 603 & 604 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. Further demolition at Unit 603 is required to expose the corrosion and clean the bars. The other spalled areas' reinforcing have minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repairs is ten (10) square feet. Unit 804 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. The existing reinforcing top bars have minimal concrete coverage and may be the reason for the spalling. We recommend tying the top bar to the bottom bar to provide more clearance from the top of slab. Estimated total area -of repairs_ is. seven -and -one-half (7.5) square feet. OCT - 9 RFn r M L Engineering, Inc. Consulting Engineers 2030 37i° Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 569-4041 nalengineeringinc.corn Project No.17-139A Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. Pic 3 Unit 403 ceiling 2 Pic 2 Unit 603 Further demo @ corroded bar �ECEWE OCT - 9 RECD M L Engineering, Inc. Project No. 17-139A Report No. 2 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37i6 Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringine.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr —Bldg.A CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: July 18, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Unit 301/302 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Column spall@ 3`d floor walkwav stair door The loose concrete has been removed and reinforcing exposed. The bars are in serviceable condition and will require cleaning and priming. The metal doorjamb has some surface corrosion and shall be cleaned as well. The door frame and opening shall be sealed after repairs are complete. Pic 1 Unit 3 01/3 02 walkway Pic 2 Column spall @ stair door FOC7::]o 1 M L Engineering, Inc. Project No. 17-139A Report No. 3 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37" Avenue Chris Arias Danielle, Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr —Bldg. A DATE: July 26, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at balconies. OBSERVATIONS: Unit 301 —West balcony Demo of all loose concrete is complete. The reinforcing bars have surface corrosion and will require power tool cleaning and priming. The top bars were found to have less than 1" of concrete coverage. Estimated total area of repair is One (1) square foot. Unit 302 — East Balcony Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is three (3) square feet. Unit 306 — East Balcony Surface spall near the sliding glass door has been chipped. Bars have surface corrosion and require cleaning and priming. Estimated total area of repair is four (4) square feet. tc)'P' S•CG� F•. rvG , I OCT 2 3 AECD 'SSIOt`1P;< M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 569-4041 mlengineeringine.com Pic I Unit 302 surface spall Project No. 17-139A Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File 2 M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772)569-1257 Fax (772)569-4041 mlengineeringinc.com Project No. 17-139A Report No. 1 cc: Genc Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0046 PROJECT NAME: Bryn Mawr — CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: DATE: July 12, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny Unit 402 Demo of all loose concrete is complete for two (2) concrete surface spalls. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is five (5) square feet. Unit 403 The delaminated stucco on the ceiling has been removed. We discovered there are no spalls in the concrete. The area shall be patched with new stucco and feathered to match the surrounding areas. Estimated total area of stucco repair is three (3) square feet. Units 601, 603 & 604 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. Further demolition at Unit 603 is required to expose the corrosion and clean the bars. The other spalled areas' reinforcing have minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repairs is ten (10) square feet. Unit 804 Demo is complete for five (5) surface spalls and corroded reinforcing exposed. The existing reinforcing top bars have minimal concrete coverage and may be the reason for the spalling. We recommend tying the top bar to the bottom bar to provide more clearance from the top of slab. Estimated total area of repairs is seven and one-half (7.5) square feet. �EQ[EOVc OCT 2 3 AEC'D M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)5694041 mlengineeringinc.com Project No. 17-139A Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. Pic 1 Unit 603 walkway Pic 3 Unit 403 ceiling Pic 2 Unit 603 Further demo @ corroded bar M L Engineering, Inc. Project No. 17-139A Report No. 4 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772) 5694041 mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. A 5061 NORTH HIGHWAY A FT. PIERCE, FLORIDA THRESHOLD INSPECTION RE SLC BUILDING PERMIT NUMBER l 11 '-0046 PROJECTNAME: Bryn Mawr —Bldg. A DATE: October 18, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Final inspection on all repairs OBSERVATIONS: The following repairs have been completed and are in accordance with design documents. Column spall: Walkway stair door Surface spalls: Balconies @ units 101, 102, 104, 301, 302, 306, 501, 606, 802 & 804 Walkway @ units 301/302, 402, 601, 603, 604 & 804 Ceiling spalls: Walkway @ unit 403 was not a spall and only stucco repair Slab edge repair: Unit 301 balcony @ north elevation Deck Coating: Balconies @ units 101, 201 & 204 Walkway @ units 203, 802 & 805 •',1p1111ftrt .•• NSHONy F. %A'Q''• F L O 4: n OCT 2 3 RECD