Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORTi:1VI B %l ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES -D(, BY ED CNIL • STRUCTURAL •SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 St. 1 Uria l.r)1lnho 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA H3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 7/6/2018 Weather: Sunny Owner: The Sands Condo C/0 Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201,202,203,204,205 & 206 Discipline: Special ThFesheld Type of Inspection: Initial Partial Final Reinspeetien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drvwall. Tvice. Fastening. Rating, etc. Stucco Application In -Progress Stucco Apolication Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks I IWIndow & Doors I IStructural Final LX )Other (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ❑Approved ❑X Partial Approved EX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. •" 0 O & INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTli: EW. Ro If ol4 pig; rr 6 , SI 021620 �Fssili1 �"A 8 2019 iMENM B ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CM[ • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street•Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA H3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 7/6/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 104,106 203,204,205 & 206 Discipline: -- Special ThFPghSla - Type of Inspection: initial Partial Fins{ Rem&peetlao Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping rtial Approved ADDITIONAL INFORMATION ON MEN Observed the installed storm shutters. ns require a Metal Floor Metal Roof Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final X Other (Use Additional member / Area re -inspection) Pending F—lRejected INSPECTED (From inspection items VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. _�"e'o- "vsF'`9o�i� F INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 FCERTIFIID B9;W plf0 OW 7021620 4/i/ ISSll I INIM B%f ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 11/14/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: Front Entries Discipline: Special Threshold Type of Inspection: Initial Partial Pinal Reinw._two Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping pending ins I Approved a Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Bek Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. 0 'Oo. 0 i it •, (P� L INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIFIodolfo ' , m'zpf ` 1 7021620 //7//lSisi�IA\�0 8 2019 i:1VI B � ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMFNTAI. 1835 20th Street -Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Inspection Date: 12/5/2018 Weather: Sunny Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201,202,203,204,205 & 206 Discipline: Special ThFpghnld Type of Inspection: Initial Partial Final Re . .._t'.==t!=c Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. - Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections I I Wire Lath / Hock Lath etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing I IStorefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved Pending ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. ;i0 0, C, INSPECTOR: Rodolfo Villamizar, PE 61000, S1 7021620 CERTIF E¢ ;IRbdolf0_Villti 0 517021620 ////11111I MAR 0 8 2019 NUMB ENGINEERING, INC. MOIA BOWLES VILLAMIZAR a ASSOCIATES CIVII- • STRUCTURAL • SURVFYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fa : 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 12/5/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 104,106,203,204,205 & 206 Discipline: Special ThFeg.,.I., Type of Inspection: initial Partial Foal AL_4� Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses. Svstems. Bracing. UDlift Restraints, etc. Roof Sheat Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Tvoe. Fastening, Rating, etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final l Interior Framing and Firestopping I X 10ther (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ❑Approved Partial Approved MX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 o;, ERTfF1 a'ETY:Rodo/foi7�/ , SI 7021620 e i:M S ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENj(+�ANNED 1835 20ch Street • Vero Beach, FL 32960 13Y 772.S69.0035 • Fmc; 772.778.361St I I Inir ^.... _. www.mbvengcom CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 7/6/2018 Weather: Sunny Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201,202,203,204,205 & 206 Discipline: Special ' hFeghg` gig Type of Inspection: initial Partial Final Re-^� Demolition _ Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns,Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping inspections require a Approved Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Pending uRejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. �mlurll NOTES: Call back for re -inspection. — r i � ,• 5�P�EOp � INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 t30q 51 7021620 //ll)i ImIAR 0 8 E019 1 INI M B V ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.corn CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 7/6/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 104,106,203,204,205 & 206 Discipline: Special , 3hEeeheld Type of Inspection: lnitial Partial Final el � Demolition Metal Floor Decking Foundation Concrete Placement Metal. Roof Decking Concrete Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Concrete Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Structural Steel Connections Elevated Concrete Slab Concrete Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds lInsulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Storefront Framing & Glazing Roof Sheathing, Type, Fastening Window & Door Bucks Exter. Wall Framing, Blocking, Connections, etc. Window & Doors Wall Sheathing, Blocking, Vapor Barriers, etc. I Structural Final Interior Framing and Firestopping I X 10ther (Use Additional member/Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved ❑X Partial Approved [ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. v, �C, INSPECTOR: Rodolfo Villamizar, PE 61000, 517021620 FLO CERTIFIE �Y• ' qih q15 PE 10 0, 17021620 l011I IBR 0 8 2019 1E'MB'V ENGINEERING, INC. MOIA BOWLES V ILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING . ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 11/14/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villomizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villomizar, P.E. Unit #: Front Entries Discipline: Special T-h pq.,h^'a Type of Inspection: l+3i W Partial Taal °emwee4Gn Demolition Metal Floor Decking Foundation Concrete Placement Metal Roof Decking Concrete Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Concrete Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Structural Steel Connections Elevated Concrete Slab Concrete Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Insulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Storefront Framing & Glazing Roof Sheathing, Type, Fastening Window & Door Bucks Exter. Wall Framing, Blocking, Connections, etc. I 1winclow & Doors Wall Sheathing, Blocking, Vapor Barriers, etc. I Istructural Final Interior Framing and Firestopping I X 10ther (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) MXPartial Approved ^ 1 Pending nRejected MApproved ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. �"----r2,4 93 O No. _ of INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIF!DfP%RodL'c SI 7021620 //7/CSSII�t4 I:1VI B � ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 12/5/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3216 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201,202,203,204,205 & 206 Discipline: Special Th ghnldhnld Type of Inspection: Initial Partial €Ina) ;:eiAsl� Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping OF INSPECTION Approved a Metal Floor Dec Metal Roof Dec I IStructural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final X Other (Use Additional member / Area Below) Pending LiRejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the NOTES: Call back for installation work and correct the noted deficiencies. 0' 61z V1 INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIFIED 7021620 II MA"O 8 idM B' ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL. • STRUCTURAL. • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com C-A H3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 5 Inspection Date: 12/5/2018 Weather: Sunny Permit #: SLC 1704-0515 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 32165 Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 104,106,203,204,205 & 206 Discipline: Special ThFesheld Type of Inspection: {Whig{ Partial Final R^ Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping DISPOSITION OF INSPECTION Approved ADDITIONAL INFORMATION ON MEN Observed the installed storm shutters. require a I Floor Decking I Roof DecklnR Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing it Framing & Glazing & Door Bucks & Doors d Final >e Additional member / Area Pending uRejected INSPECTED (From inspection items VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. "" -A`yT- _ -71? _."�" -0. ,CppR, C., INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIf Rod' ,Ufaq}L E 10 0, 517021620 %.,,0FESS`\, x 0 8 201