Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORT 1STRUCTURAL INSPECTION REPORT ,� B ENGINEERING, INC. SCANNED MOIA BOWLESVILLAMIZ R&ASSOCIATES By Project Number: 17-0346 CNII • STRUCTURAL • SURVFYING • ENVIRONMF.MFAt• Lucie Countl7 Project Name: The Sands Section 1-Build 1835 20th Street -Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Inspection Date: 3/8/2018 Weather: Sunny Permit #: SLC 1704-0517 Contractor: Velocity Services Group Inspector: Rodolfo Villamizor, P.E. Project Address: 3207 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 206,205,204,203 & 202 Discipline: Special Th pghnldhnld Type of Inspection: Initial Partial Final Rewmx%tfen Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SCIG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Final etc. Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Additional member / Area DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved nPartial Approved n Pending MRejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. Unit 202 railing is built-in with the aluminum screen enclosure and is still a work -in -progress. Unit 201 did not have the balcony rails at the time of this inspection. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. .k\\\\ .... ///7. NOTES: Call back for re -inspection. i O• tic. woou p ATE O INSPECTOR: Rodolfo Villamizar, PE 61000, SI7021620 CERfF1F'By: ill E 10 0, S17021620 0 8 2019 IMEM B V ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CNII. • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 6 Inspection Date: 3/8/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0517 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3207 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 101, 102, 103, 201, 202, 203 & 206 Discipline: Special T4.Fpgh..lFi Type of Inspection: Initial Partial Final Rekspe,.tk Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping ON OF INSPECTION (all pending inspections require a ved nPartial Approved FX ADDITIONAL INFORMATION ON MEM Observed the installed storm shutters. Floor Decking Roof Deckine Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments rtain Wall Framing & Glazing )refront Framing & Glazing ndow & Door Bucks- ndow & Doors uctural Final her (Use Additional member / Area Pending INSPECTED (From inspection items a VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 7021620 ��,��•.^10R1� 2019 ON A \\\\\\\ 10 ENGINEERING, INC. MOIA BOWLES VILLAMIZAR 8 ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 6 Inspection Date: 8/27/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0517 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3207 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo, Villamizar, P.E. Unit #: 206,205,204,203,202 & 201 Discipline: Special Threshold Type of Inspection: {nitlal Partial Final oemsp._.!_=«!=- Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc: Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping DISPOSITION OF INSPECTION rtial Approved a Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Pending It Framing & Glazing & Door Bucks & Doors I[ Final se Additional member / Area ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. W ov INSPECTOR: Rodolfo Villamizar, PE 61000, 517021620 Ep BlitdZfjfo �' tza , PE 1 Wr,.$f 7021620 -/// �SstoNF•\\\\\A R 0 8 019 i=MB'%f ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR 6 ASSOCIATES CML • STRUCTURAL • SURVFYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 6 Inspection Date: 8/27/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0517 Contractor: Velocity Services Group Inspector: Rodolfo Villomizar, P.E. Project Address: 3207 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 101, 102, 103, 201, 202, 203 & 206 Discipline: Special Thresholdm Type of Inspection: 7aitial Partial Final Relnspeetien Demolition Metal Floor Decking Foundation Concrete Placement Metal Roof Decking Concrete Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Concrete Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Structural Steel Connections Elevated Concrete Slab Concrete Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds linsulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Storefront Framing & Glazing Roof Sheathing, Type, Fastening lWindow & Door Bucks Exter. Wall Framing, Blocking, Connections, etc. Window & Doors Wall Sheathing, Blocking, Vapor Barriers, etc. Structural Final Interior Framing and Firestopping X 10ther (Use Additional member/Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved El Partial Approved EJ Pending Rejected INFORMATION ON MEMBER/AREA INSPECTED (From Observed the installed storm shutters. items VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. ����'O VILIA _= il: ; 140. F INSPECTOR: Rodolfo Villamizar, PE 61000, SI7021620 CERTIE164j': Ro of o ' EI r� 6 000, 17021620 S/O -A Atr7\ "8 20 9 11//llill(1\0 r %:MBA ENGINEERING, INC. MOIA BOWLESVILLAMIZAR &ASSOCIATES CNII. • STRUCTURAL • SURVFYING • ENVIRONMENTAL. 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #372R STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 6 Inspection Date: 11/14/2018 Weather: Sunnv Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0517 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3207 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: Front Entries Discipline: Special ''h,, ghnla Type of Inspection: lniti l Partial Final ReiasI — Demolition Foundation concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Floor Roof Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final X I Other (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved Partial Approved MX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 :.ENS No. 610uu�� 1� 9F7 I — * is 517021620 NAK^'2019 ///lllllll 0