Loading...
HomeMy WebLinkAboutSTRUCTURAL INSPECTION REPORTi=M B V STRUCTURAL INSPECTION REPORT ENGINEERING, INC. 6GANNE® MOIA BOWLESVILLAMIZAR&ASSOCIATES BY Project Number: 17-0346 CIVIL • STRUCTURAL • SURVEYING . ENviRONMFNFAt. I I lr.iP. COunty Project Name: The Sands Section 1-Building 7 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA 03728 Inspection Date: 7/2/2018 Weather: Sunnv Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0520 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3218 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201, 202, 203, 204, 205 & 206 Discipline: Special ThFpq ...'.J Type of Inspection: Initial- Partial Final Rem&peet m Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping a rtial Approved Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Rating, etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Pending & Doors II Final se Additional member / Area ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for INSPECTOR: Rodolfo Villamizar, PE 61000, 517021620 Ir11// ,... `... R o 1 ce, 61 � o 1 B*, R4,olfo Villgrrp/i3 , ///// UP ES S10"N' V i01MB)l ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR & ASSOCIATES CMII- • STRUCTURAL • SURVEYING . ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 7 Inspection Date: 7/2/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0520 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3218 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villomizar, P.E. Unit #: 101, 102, 104, 203 & 204 Discipline: Special Txeshnid Type of Inspection: Initial Partial Final Reinspeetien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Partial Approved ADDITIONAL INFORMATION ON MEM Observed the installed storm shutters. a Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drvwall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Pending INSPECTED (From inspection items above): VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 aSE V; v -0( C`O. 0- 11 �i"///Opess I i-=M B ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CML • STRUCTURAL • SURVEYING • ENARONMENTAI. 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Contractor: Velocity Services Group Project Address: 3218 S Lakeview Cir., Ft Pierce, FL STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 7 Inspection Date: 11/14/2018 Weather: Sunny Permit #: SLC 1704-0520 Inspector: Rodolfo Villamizar, P.E. Qualified By: Rodolfo Villamizar, P.E. Unit #: Front Entries Discipline: Special ThFpghnld Type of Inspection: Initial Partial Fna4 Reinspectien Demolition Foundation Concrete Placement Concrete Slab (SOG),Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping - Metal Floor Metal Roof I IStructural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Final etc. Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Use Additional member / Area ❑Approved ❑X Partial Approved [ Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. I,_"`_"!M/,'�/�, 16OF _ t� INSPECTOR: Rodolfo Villamizar, PE 51000, S17021620 CERTIK tJiod�g f /rfi E 1 00, 7021620 ���i/Fssio4 \ 6 8 2019 i� M BV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CNIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street -Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com STRUCTURAL INSPECTION REPORT Project Number: 17-0346 SCANNED By Project Name: The Sands Section 1- Building 7 St. Lucie Cotinty Inspection Date: 7/2/2018 Weather: Sunny CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0520 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3218 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201, 202, 203, 204, 205 & 206 Discipline: Special :F nPghRla Type of Inspection: Initial Partial Final Peirispectio, Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, H_oriz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping OF INSPECTION ns Metal Floor Dec Metal Roof Dec (Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drvwall. TVDe. Fastening. Rating. etc. Final I I Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Additional member / Area Approved El Partial Approved EX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. c � giPjE PLO' INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CER Ifs ei�r 51 7021620 MAR 0 8 2019 IMIMBV ENGINEERING, INC. MOIA BOWLES VILLAMIZAR & ASSOCIATES CIVIL . STRUCTURAL • SURVEYING . ENVIRONMFNTAL 1835 20th Street • Vero Beach. FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA 113728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 7 Inspection Date: 7/2/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0520 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3218 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 101, 102, 104, 203 & 204 Discipline: Special Thfesheld Type of Inspection: Initial Partial Final Rem&p.eti--'.=n Demolition Metal Floor Decking Foundation Concrete Placement Metal Roof Decking Concrete Slab (SOG) Reinforcing Steel Placement Structural Steel Column(s) Erection Concrete Slab (SOG) Concrete Placement Structural Steel Horizontal Framing Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Structural Steel Connections Elevated Concrete Slab Concrete Placement Wire Lath / Hock Lath Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Insulation Concrete Placement for column(s) Drywall, Type, Fastening, Rating, etc. CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Stucco Application In -Progress Concrete Masonry Unit Fill Cell grouting Stucco Application Final Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Exterior Veneers, Size, Type, Attachments Concrete Placement for Beam(s) Curtain Wall Framing & Glazing Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Storefront Framing & Glazing Roof Sheathing, Type, Fastening Window & Door Bucks Exter. Wall Framing, Blocking, Connections, etc. I JWIndow & Doors Wall Sheathing, Blocking, Vapor Barriers, etc. I Structural Final Interior Framing and Firestopping I X 10ther (Use Additional member/Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) rX1Partial Approved rX Pending Rejected ❑Approved ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for A INSPECTOR: Rodolfo Villamizar, PE 61000, SI7021620 CERTIFIED,B J %ASE, c ` cN� Sf gQdolj�4ki) aaii , I /11111111\ 246Y009,f S17021620. o a tots INI M B ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street -Vero Beach, FL 32960 772.569.0035 • FEuc: 772.778.3617 www.mbveng.com CA #3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 7 Inspection Date: 11/14/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0520 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3218 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: Front Entries Discipline: Special Told Type of Inspection: Initial Partial Final R ".==".=R Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. - Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Columns) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final X I Other (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved �X Partial Approved EX Pending Rejected ❑ ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. ,� y1111 I I I ll/,l� NOTES: Call back for re-insoection. .\W .1\LLAMn 77i. INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 "ASE ICW)F4( (BY:1#'�' 'PY6'1000, S17021620 SS �i�//FI o\\\ \\\