STRUCTURAL INSPECTION REPORT
� lm ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR & ASSOCIATES r I oLANNED STRUCTURAL INSPECTION REPORT BY :t I I If iP ( 01inty Project Number: 17-0346 CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.003S • Fax: 772.778.3617 www.mbveng.com CA #3728 Project Name: The Sands Section 1- Building 12 Inspection Date: 6/15/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0529 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Balcony #: 102, 104, 105, 106, 201 thru 205 Discipline: Special Threshold Type of Inspection: lni W Partial Final Reinspeetien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections 2e Lath /Hock Lath lation Drywall, Type, Fastening, Rating, etc. Stucco Application Final Exterior Veneers, Size, Type,.Attachrm Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ❑Approved �X Partial Approved MX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. ,�tllllll� NOTES: Call back for Re -inspection. ����• - mono STATED C INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTIFI 1 ' rqWQJS17021620 MAR 0 8 2019 im M B V ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR & ASSOCIATES CMI.. • STRUCTURAL • SURVFYING • EWRONMF.NTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 . www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Contractor: Velocity Services Group STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1 - Building 12 Inspection Date: 6/28/2018 Weather: Sunny Permit #: SLC 1704-0529 Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201, 202, 203, 204, 205 & 206 Discipline: Special TI.regh AloI Ald Type of Inspection: IRWal Partial Final Re-mWeetien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Bek DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ❑Approved �X Partial Approved EX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. 0 8 2019 i=MB ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR S ASSOCIATES CMI. • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street -Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Contractor: Velocity Services Group STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1 - Building 12 Inspection Date: 6/28/2018 Weather: Sunny Permit #: SLC 1704-0529 Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villomizar, P.E. Unit #: 102, 104, 105, 106, 201 thru 205 Discipline: Special TI'rn...;hglvl'^I^I•' Type of Inspection: Initial Partial Final RELWARe Lion Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor De( Metal Roof Dec Structural Steel I (Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Wall Framing & Glazing Int Framing & Glazing I & Door Bucks I & Doors A Final Ise Additional member Approved ❑X Partial Approved I Pending El Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. ,��c�\.,cENSF•,r4 INSPECTOR: Rodolfo Villamizar, PE 61000, 517021620 - _*; it STAT OF [ CERTIW' d '0 100 , 517021620 77/il MAR 0 8 2019 MI M B ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMF.NTAI. 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 12 Inspection Date: 11/14/2018 Weather: Sunny Permit #: SLC 1704-0529 Contractor: Velocity Services Group Inspector: Rodolfo Villomizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villomizar, P.E. Unit #: Front Entries Discipline: Special ThFes eld Type of Inspection: initial Partial Final ReMSPectien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, HorizJ.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping IApproved Metal Floor Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Bell a re -inspection) Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re-inspection.\� �F0 tq�7/,, 6 T'QTATr OF W'�) INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 JCERT&JE' :Rqd ' I's/rfi ItE 6100 , 17021620 ��/iss °NIA �\���`�� MAR 0 8 2019 Mj� N ED STRUCTURAL INSPECTION REPORT ENGINEERING, INC. St. LUCIeColinty Project Number: 17-0346 MOIA BOW LES V ILLAMIZAR & ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONME.NTAI 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA #3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Project Name: The Sands Section 1- Building 12 Inspection Date: 6/15/2018 Weather: Sunny Permit#: SLC1704-0529 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Balcony #: 102, 104, 105, 106, 201 thru 205 Discipline: Special ThFpqntd Type of Inspection: initial Partial Final Reinspeetien Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath etc. I IStucco Application Final Attachments Wall Framing & ,nt Framing & G r & Door Bucks r & Doors al Final X IOther (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved FTIPartial Approved EX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back for Re -inspection. Kin 0 STATE INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIFIED 61ri. Ifo9L'i(l 7,fiz y' E , 1620 MAR 0 A 2019 i:MB%/` ENGINEERING, INC. MOIA BOW LES V ILLAMIZAR & ASSOCIATES CNII- • STRUCTURAL • SURVEYING • ENVIRONMF.NTAI_ 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA ft3720 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 12 Inspection Date: 6/28/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0529 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 201, 202, 203, 204, 205 & 206 Discipline: Special ThFesheld Type of Inspection: Initial Partial Final �e'� =----:'!=c Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz I.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking _ Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath Insulation Drvwall, Tvoe. Fastening. Rating. etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final X I Other (Use Additional member / Area Below) DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved El Partial Approved MX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the rear balconies and rear/front windows/sgd's. Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railings installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. ��� OS •""r F Iu ter%/� /i. INSPECTOR: Rodolfo Villamizar, PE 61000, 51 7021620 BY: //// °�n i��44R 0 8 2019 MEN =MBit ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL- • SURVEYING • ENVIRONMENTAL 1635 20th Street -Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA Jl3728 STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 12 Inspection Date: 6/28/2018 Weather: Sunny Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Permit #: SLC 1704-0529 Contractor: Velocity Services Group Inspector: Rodolfo Villamizar, P.E. Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Qualified By: Rodolfo Villamizar, P.E. Unit #: 102, 104, 105, 106, 201 thru 205 Discipline: Special T a Type of Inspection: initial Partial Fins{ R m&peegem Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections I (Wire Lath / Hock Lath Insulation I IDrywall, Type, Fastening, Rating, etc. Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Bek DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) ❑Approved El Partial Approved MX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed storm shutters. VERBAL INSTRUCTIONS: Contractor to continue the shutters installation work and correct the noted deficiencies. NOTES: Call back forre-inspection. ���c��iOE'ys4 �i_ INSPECTOR: Rodolfo Villamizar, PE 61000, 51 7021620 CERTL9 7021620 * = MAR 082019 oSTATE OF ;'if =M B f ENGINEERING, INC. MOIA BOWLES VILLAMIZAR &ASSOCIATES CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL 1835 20th Street • Vero Beach, FL 32960 772.569.0035 • Fax: 772.778.3617 www.mbveng.com CA H3728 Owner: The Sands Condo C/O Elliott Merrill Comm Mgmt Contractor: Velocity Services Group Project Address: 3215 S Lakeview Cir., Ft Pierce, FL Unit #: Front Entries STRUCTURAL INSPECTION REPORT Project Number: 17-0346 Project Name: The Sands Section 1- Building 12 Inspection Date: 11/14/2018 Weather: Sunny Permit #: SLC 1704-0529 Inspector: Rodolfo Villamizar, P.E. Qualified By: Rodolfo Villamizar, P.E. Discipline: Special T ego Type of Inspection: I+3itia{ Partial Fkhg _^ Demolition Foundation Concrete Placement Concrete Slab (SOG) Reinforcing Steel Placement Concrete Slab (SOG) Concrete Placement Elevated Concrete Slab Reinfor. Steel Placement; forms, etc. Elevated Concrete Slab Concrete Placement Concrete Columns, Walls Reinf. Steel, Formwork, Embeds Concrete Placement for column(s) CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R. Concrete Masonry Unit Fill Cell grouting Concrete Beam Reinf. Steel, Formwork, Embeds, etc. Concrete Placement for Beam(s) Roof Trusses, Systems, Bracing, Uplift Restraints, etc. Roof Sheathing, Type, Fastening Exter. Wall Framing, Blocking, Connections, etc. Wall Sheathing, Blocking, Vapor Barriers, etc. Interior Framing and Firestopping Metal Floor Decking Metal Roof Decking Structural Steel Column(s) Erection Structural Steel Horizontal Framing Structural Steel Connections Wire Lath / Hock Lath . Insulation Drywall, Type, Fastening, Rating, etc. Stucco Application In -Progress Stucco Application Final Exterior Veneers, Size, Type, Attachments Curtain Wall Framing & Glazing Storefront Framing & Glazing Window & Door Bucks Window & Doors Structural Final Other (Use Additional member / Area Bek DISPOSITION OF INSPECTION (all pending inspections require a re -inspection) Approved ❑X Partial Approved EX Pending Rejected ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): Observed the installed railings on the front/entries of the building. VERBAL INSTRUCTIONS: Contractor to continue the railines installation work and correct the noted deficiencies. NOTES: Call back for re -inspection. '\` 0,1-1 _ ; .:-�!54.'/i_ STATE INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 CERTIFIE6 �fOfYi /i///°NIA 0� ���` MAR 0 8 2019