Loading...
HomeMy WebLinkAboutREPORT OF INSTALLATIONG 01.r '; f SLG /l05-6/,2,e1 Drilling and Engineering, Inc. SEPTEMBER 22, 2017 REPORT OF HELICAL PIER INSTALLATION FOR RECEII'zD SEP 2 71017 SGHNNED BY 3t. Lucie County RF CONCRETE CONSTRUCTION INC. MAVERICK BOAT GROUP 3207 INDUSTRIAL 29' STREET FORT PIERCE, FLORIDA 1499 S.W. 30th Avenue • Suite #11 • Boynton Beach, FL 33426 Office: (561) 742-2988 • Fax: (561) 742-2987 Website: dndrilling.com • Email: Dan@dndrilling.com 0 Drilling and Engineering, Inc. Date: September 22, 2017 Mr. Jeremy Foulks RF Concrete Construction Inc. 664 Old Dixie Highway Vero Beach, Florida 32962 Phone (772) 473-1057 RE: Helical Pier Installation Maverick Boat Group 3207 Industrial 29th Street Fort Pierce, Florida Gentlemen: Technicians from D & N Drilling & Engineering, Inc. witnessed the installation of the Helical Piers at the above referenced address on Tuesday, September 19, 2017 starting at 9:30 AM and completing at 12:30 PM. The 100% on site observation of the installation was completed as required per construction plans. A review of the final pier installation logs with pier depths, locations and time of installation can be found later in this report. There was also a review of the contractor's qualifications including confirmation that the helical pier contractor was certified. Based on onsite observation, review of pier installation logs and applicable contractor data, we hereby certify that the helical pier foundation for the referenced residential site was installed in substantial compliance with the requirements of the construction plans and helical pier installation specifications. It was a pleasure to assist you in this phase of your project. If you have any questions about this report or need additional information, please call at your convenience. Respectfully submitted, D& qNG NG&ENGINCP222011 DoAArpin, P. E. Florida Reg. #28585 1499 S.W. 30th Avenue • Suite #1 1 • Boynton Beach, FL 33426 Office: (561) 742-2988 • Fax: (561) 742-2987 Website: dndrilling.com • Email: Dan@dndrilling.com Customer: Maverick Boat Group Job Address: 3207 Industrial 29t" St. FT Pierce, FL Helical Pier/Pile Installation Record Installation Date:9-19-17 Page 1. Material: MacLean Dixie P28 — D6 Combo Pile Capacity: 7.5Ton working 15 Ton Ultimate Pier No. Lead Description Helix/Shaft Size/Length Extensions Termination Torque gauge * PSI Working Capacity Tons Helical Pier/Pile Length 1 10",12",14" Lead (7') 3 — 7ft exts, 10"xl0" New Con Plate 1,500 7.5Ton 26ft 2 10",12",14" Lead (T) 2 — 7ft exts, 10"xl0" New Con Plate 1,500 7.5Ton 21.5ft 3 10",12",14" Lead (T) 2 — 7ft exts, 10"x10" New Con Plate 1,500 7.5Ton 21 ft 4 10",12".14" Lead (T) 2 — 7ft exts, 10"xl0" New Con Plate 1,500 7.5Ton 21 ft 5 10",12",14" Lead (T) 2 — 7ft exts, 10"xl0" New Con Plate 1,500 7.5Ton 21 ft 6 10",12",14" Lead (T) 2— 7ft exts, 10"x10"New Con Plate 1,500 7.5Ton 21.5ft Note: * Hydraulic Pressure Gauge Calibrated To AB Chance Sheer Pin Indicator Shearing 6 - 500 ftlb Torque Pins Which Equates To 3,OOOftlbs Of Installation Torque. MacLean Dixie CERTIFIED INSTALLER: Joe Scotten Norr Building Corp. 3866 Prospect Ave, Suite 12West Palm Beach, FL 33404