Drilling and Engineering, Inc.
SEPTEMBER 22, 2017
REPORT OF
HELICAL PIER INSTALLATION
FOR
RECEII'zD SEP 2 71017
SGHNNED
BY
3t. Lucie County
RF CONCRETE CONSTRUCTION INC.
MAVERICK BOAT GROUP
3207 INDUSTRIAL 29' STREET
FORT PIERCE, FLORIDA
1499 S.W. 30th Avenue • Suite #11 • Boynton Beach, FL 33426
Office: (561) 742-2988 • Fax: (561) 742-2987
Website: dndrilling.com • Email: Dan@dndrilling.com
0
Drilling and Engineering, Inc.
Date: September 22, 2017
Mr. Jeremy Foulks
RF Concrete Construction Inc.
664 Old Dixie Highway
Vero Beach, Florida 32962
Phone (772) 473-1057
RE: Helical Pier Installation
Maverick Boat Group
3207 Industrial 29th Street
Fort Pierce, Florida
Gentlemen:
Technicians from D & N Drilling & Engineering, Inc. witnessed the installation of the
Helical Piers at the above referenced address on Tuesday, September 19, 2017 starting at
9:30 AM and completing at 12:30 PM. The 100% on site observation of the installation
was completed as required per construction plans.
A review of the final pier installation logs with pier depths, locations and time of
installation can be found later in this report. There was also a review of the contractor's
qualifications including confirmation that the helical pier contractor was certified.
Based on onsite observation, review of pier installation logs and applicable contractor
data, we hereby certify that the helical pier foundation for the referenced residential site
was installed in substantial compliance with the requirements of the construction plans
and helical pier installation specifications.
It was a pleasure to assist you in this phase of your project. If you have any questions
about this report or need additional information, please call at your convenience.
Respectfully submitted,
D& qNG
NG&ENGINCP222011
DoAArpin, P. E.
Florida Reg. #28585
1499 S.W. 30th Avenue • Suite #1 1 • Boynton Beach, FL 33426
Office: (561) 742-2988 • Fax: (561) 742-2987
Website: dndrilling.com • Email: Dan@dndrilling.com
Customer: Maverick Boat Group
Job Address: 3207 Industrial 29t" St. FT Pierce, FL
Helical Pier/Pile
Installation Record
Installation Date:9-19-17
Page 1.
Material: MacLean Dixie P28 — D6 Combo Pile
Capacity: 7.5Ton working 15 Ton Ultimate
Pier
No.
Lead Description
Helix/Shaft Size/Length
Extensions
Termination
Torque
gauge *
PSI
Working
Capacity
Tons
Helical
Pier/Pile
Length
1
10",12",14" Lead (7')
3 — 7ft exts,
10"xl0" New Con Plate
1,500
7.5Ton
26ft
2
10",12",14" Lead (T)
2 — 7ft exts,
10"xl0" New Con Plate
1,500
7.5Ton
21.5ft
3
10",12",14" Lead (T)
2 — 7ft exts,
10"x10" New Con Plate
1,500
7.5Ton
21 ft
4
10",12".14" Lead (T)
2 — 7ft exts,
10"xl0" New Con Plate
1,500
7.5Ton
21 ft
5
10",12",14" Lead (T)
2 — 7ft exts,
10"xl0" New Con Plate
1,500
7.5Ton
21 ft
6
10",12",14" Lead (T)
2— 7ft exts,
10"x10"New Con Plate
1,500
7.5Ton
21.5ft
Note: * Hydraulic Pressure Gauge Calibrated To AB Chance Sheer Pin Indicator Shearing 6 - 500 ftlb Torque Pins Which Equates To 3,OOOftlbs Of
Installation Torque.
MacLean Dixie CERTIFIED INSTALLER: Joe Scotten
Norr Building Corp.
3866 Prospect Ave, Suite 12West Palm Beach, FL 33404