Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
IMPACT FEE
Byn Mawr Summary Surface Spall Paint Deck Coating Bottom Track Stucco Repair Waterproofing Post Top cap NOC Permit Mobilization Concrete Repairs TOTAL CO & Concrete Repairs � ,v Building A Bulld n B Building C $912.45 $1,624.24 $3,197.92 $294.11 $205.80 $476.51 $885.38 $585.00 $1,641.83 $201.18 $59.48 $27.75 $1,144.36 $15.98 $185.13 $540.00 $3,240.00 $583.50 $13.00 $13.00 $13.00 $360.54 $360.53 $360.53 $1,500.00 $1,500.00 $1,500.00 $11,751.45 $4,572.00 $7,359.59 6L;ANNED BY 3t Luce COUr?ty TOTAL $17,090.22 $9,476.03 $18,558.01 $45,124.26