BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECT NAME: Bryn Mawr—Bldg.0
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
DATE: August 3, 2017
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
WORK INSPECTED: In progress concrete repairs at walkways.
OBSERVATIONS: Demo of all loose concrete is complete.
Unit 802
Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion
and will require power tool cleaning and priming.
Estimated total area of repair is nine (9) square feet.
Unit 805 Q,, front door
The existing reinforcing has minor surface corrosion and will require power tool cleaning and
priming. The top bars have minimal coverage and appears one bar was shifted during original
pour when the building was constructed.
Estimated total area of repair is six (6) square feet.
Unit 901
Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair
and will require forming and pouring. The existing reinforcing has minor surface corrosion and
will require power tool cleaning and priming.
Estimated total area of repair is three and a half (3.5) square feet.
Unit 905
Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during
demo and will require repair. The existing reinforcing has minor surface corrosion and will
require power tool cleaning and priming.
Estimated total area of repair is seven (7) square feet.
m
•
M L Engineering, Inc.
Consulting Engineers
2030 37ih Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
Pic I Unit 805 surface spall
Pic 3 — Unit 905 surface spall @ door
Project No. 17-139C Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Re -inspection will be required after all reinforcing have cleaned and coated.
�`•�'iNOIV ••��
G
0
Lul;; :EPL
. e:
M
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.cona
Project No. 17-139C Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECT NAME: Bryn Mawr —Bldg. C
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
DATE: August 3, 2017
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
WORK INSPECTED: In progress concrete repairs at walkways.
OBSERVATIONS: Demo of all loose concrete is complete.
Unit 802
Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion
and will require power tool cleaning and priming.
Estimated total area of repair is nine (9) square feet.
Unit 805 na, front door
The existing reinforcing has minor surface corrosion and will require power tool cleaning and
priming. The top bars have minimal coverage and appears one bar was shifted during original
pour when the building was constructed.
Estimated total area of repair is six (6) square feet.
Unit 901
Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair
and will require forming and pouring. The existing reinforcing has minor surface corrosion and
will require power tool cleaning and priming.
Estimated total area of repair is three and a half (3.5) square feet.
Unit 905
Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during
demo and will require repair. The existing reinforcing has minor surface corrosion and will
require power tool cleaning and priming.
Estimated total area of repair is seven (7) square feet.
e r•V
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
Pic 1 Unit 805 surface
4; -
Pic 3 — Unit 905 surface spall (a, door
Project No.17-139C Report No.1
on: Gene Ross ElliottMerrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Re -inspection will be required after all reinforcing have cleaned and coated.
K 79. Dulo TM Q
�O
pO •.FLOR•'�C
.,��FFSS�ONP.
2
W,
M L Engineering, Inc.
Consulting Engineers
203037' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 569-4041
mlengineeringinc.com
Project No. 17-139C Report No.1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECT NAME: Bryn Mawr—Bldg.0
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
DATE: August 3, 2017
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
WORK INSPECTED: In progress concrete repairs at walkways.
OBSERVATIONS: Demo of all loose concrete is complete.
Unit 802
Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion
and will require power tool cleaning and priming.
Estimated total area of repair is nine (9) square feet.
Unit 805 c@ front door
The existing reinforcing has minor surface corrosion and will require power tool cleaning and
priming. The top bars have minimal coverage and appears one bar was shifted during original
pour when the building was constructed.
Estimated total area of repair is six (6) square feet.
Unit 901
Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair
and will require forming and pouring. The existing reinforcing has minor surface corrosion and
will require power tool cleaning and priming.
Estimated total area of repair is three and a half (3.5) square feet.
Unit 905
Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during
demo and will require repair. The existing reinforcing has minor surface corrosion and will
require power tool cleaning and priming.
Estimated total area of repair is seven (7) square feet.
M L Engineering, Inc.
Consulting Engineers
2030 370 Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
Pic 1 Unit 805 surface
Pic 3 — Unit 905 surface spall @ door
Project No.17-139C Report No. 1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const
Carl Peterson SLC Bldg Dept
File
Re -inspection will be required after all reinforcing have cleaned and coated.
,6„1 n 1 u••+
,,•
�.. NCHO/Vy o,+
idlait� Lug �: , : COPY
�•��rc,FS81ONP; �``�
2
M L Engineering, Inc.
Consulting Engineers
2030 37"Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772) 5694041
mlengineeringinc.com
Project No. 17-139C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello ConsL
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECTNAME: Bryn Mawr —Bldg. C
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED: In progress concrete repairs
DATE: August 23, 2017
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
OBSERVATIONS:
Unit 204
Ceiling spall at east balcony has been demo and corroded reinforcing exposed. The contractor
removed the concrete up to the sliding glass door. There is a corroded bar parallel with the
sliding glass door and directly above the door track. The corrosion shall be chased until clean
reinforcing is found. This will require removing the sliding glass door and constructing a
temporary weather wall. We will inspect again prior to concrete placement.
We sounded the concrete slab above at Unit 304 and found no deficiencies.
Railing posts
The walkway railing post replacement is in progress. The contractor has started on the 91h floor
and will work down from there.
,��unngq�
F
4
.
i'ct�a�d 1. Lu5 .E: T:
:•d.Q' FL 0F 0 '�C�
Ot"FILE CV Y
��'•.' #FSSIis, ONP� •`•
L
M L Engineering, Inc.
Consulting Engineers
203037' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc,com
Pic 1 Unit 204 ceiling spall
Project No. 17-139C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Pic 2 Unit 204 corroded bar @ ceiling
F I i ' �"%OFY
. LE C
2
IVlit: IL.upy
M L Engineering, Inc.
Consulting Engineers
2030 37' Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinacom
Project No. 17-139C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION QIZ1r
SLC BUILDING PERMIT NUMBER: 17i7.0,05.
PROJECT NAME: Bryn Mawr— Bldg. C
CLIENT: Elliott Merrill Community Mgt.
CONTRACTOR: Daniello & Assoc.
INSPECTED BY: Mike Lue
WORK INSPECTED: In progress concrete repairs
DATE: August 23, 2017
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
WEATHER: Sunny
OBSERVATIONS:
Unit 204
Ceiling spall at east balcony has been demo and corroded reinforcing exposed. The contractor
removed the concrete up to the sliding glass door. There is a corroded bar parallel with the
sliding glass door and directly above the door track. The corrosion shall be chased until clean
reinforcing istfound„This will require removing the sliding glass door and constructing a
temporarj ' weather WalI .Nye will inspect again prior to concrete placement.
We sounded the concrete -slab above at Unit 304 and found no deficiencies.
Railing posts
The walkway railing post replacement is in progress. The contractor has started on the 9th floor
and will work down from there.
U
a 5 V
Ad� e x4
.� r
M L Engineering, Inc.
Consulting Engineers
2030 37" Avenue
Vero Beach, Florida32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinc.com
Project No. 17-139C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Pic 1 Unit 204 ceiling spall
t ) 2
M L Engineering, Inc. Project No. 17-139C Report No. 2
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37' Avenue
Chris Arias ` Daniello Const
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772)569-4041
mlengineeringinacom
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECT NAME:
Bryn Mawr —Bldg. C DATE: August 23, 2017
CLIENT:
Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR:
Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY:
Mike Lue WEATHER: Sunny
WORK INSPECTED: In progress concrete repairs
OBSERVATIONS:
Unit 204
Ceiling spall at east balcony has been demo arid corroded reinforcing exposed. The contractot
removed the concrete up to the sliding glass door. There is a corroded bar parallel with the
sliding glass door and directly above the door track. The corrosion shall be chased until clean
reinforcing is found. This will require removing the sliding glass door and constructing a
temporary weather wall. We will inspect again prior to concrete placement.
We sounded the concrete slab above at Unit 304 and found no deficiencies.
Railing posts
The walkway railing post replacement is in progress. The contractor has started on the 9th floor
and will work down from there.
• sF •GF,t
F1;pR�•
i {(
b 3i�`+ Aft
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
rulenginecringinc.com
Pic 4 —
Project No. 17-139C Report No. 2
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
post replacement in progress
M L Engineering, Inc. Project No. 17-139C Report No.1
Consulting Engineers
cc: Gene Ross Elliott Merrill
2030 37' Avenue
Chris Arias Daniello Const.
Vero Beach, Florida 32960
Carl Peterson SLC Bldg Dept
Phone (772) 569-1257
File
Fax (772)569-4041
mlengineeringinc.com
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1706-0045
PROJECT NAME:
Bryn Mawr —Bldg. C DATE: August 3, 2017
CLIENT:
Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR:
Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY:
Mike Lue WEATHER: Sunny
WORK INSPECTED: In progress concrete repairs at walkways
OBSERVATIONS: Demo of all loose concrete is complete.
Unit 802
Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion
and will require power tool cleaning and priming.
Estimated total area of repair is nine (9) square feet.
Unit 805 g front door
The existing reinforcing has minor surface corrosion and will require power tool cleaning and
priming. The top bars have minimal coverage and appears one bar was shifted during original
pour when the building was constructed.
Estimated total area of repair is six (6) square feet.
Unit 901
Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair
and will require forming and pouring. The existing reinforcing has minor surface corrosion and
will require power tool cleaning and priming.
Estimated total area of repair is three and a half (3.5) square feet.
Unit 905
Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during
demo and will require repair. The existing reinforcing has minor surface corrosion and will
require power tool cleaning and priming.
Estimated total area of repair is seven (7) square feet.
M L Engineering, Inc.
Consulting Engineers
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
Project No. 17-139C Report No.1
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
Re -inspection will be required after all reinforcing have cleaned and coated.
.e`'��NONy''•.
PL0R1,�
ml
2
e 1
M L Engineering, Inc.
Consulting Engineers
2030 371h Avenue
Vern Beach, Florida 32960
Phone (772) 569-1257
Fax (772)569-4041
mlengineeringinacom
Project No.17-139C Report No. 3
cc: Gene Ross Elliott Merrill
Chris Arias Daniello Const.
Carl Peterson SLC Bldg Dept
File
BRYN MAWR CONDOMINIUMS - BLDG. C
5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBE . 106-Q045
PROJECT NAME: Bryn Mawr IMAM DATE: October 18, 2017
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias
INSPECTED BY: Mike Luc WEATHER: Sunny
WORK INSPECTED: Final inspection on all repairs
OBSERVATIONS:
The following repairs have been completed and are in accordance with design documents.
Surface spalls: Balconies @ units 404, 501, 502 & 904
Walkway @ units 203, 204, 304, 404, 503, 604, 605, 701/702, 703, 802,
805, 901 & 905
Ceiling spalls: Balconies @ units 204 & 801
Slab edge repair: Balcony @ unit 306 (Northeast elevation)
Deck coating: Walkway @ 151 floor south stair & unit 904
Railing post: lst floor north stair, units 302 (x2), 303, 305, 404, 502, 504 (x3), 505, 604 (x2),
702, 703, 901, 902/903 & 904
ill
ir" .. a ...O &-I,i
S •0`�
C F
.� ��520 ,;iry
0cA
�;\�Q
�IEcIDF.0dIE
OCT 2 3 RECD 10