Loading...
HomeMy WebLinkAboutINSPECTION REPORT/s M L Engineering, Inc. Project No. 17-139C Report No. 1 Consulting Engineers /1 SCANNED cc: Gene Ross Elliott Merrill 2030 37' Avenue Vero Florida 32960 IV=D Chris Arias Daniello Const. Bldg Dept Beach, Si. Carl Peterson SLC Phone (772) 569-1257 Cuc eY Crnmt�r File Fax (772)569-4041 l� mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECT NAME: Bryn Mawr—Bldg.0 CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: August 3, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Demo of all loose concrete is complete. Unit 802 Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is nine (9) square feet. Unit 805 Q,, front door The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. The top bars have minimal coverage and appears one bar was shifted during original pour when the building was constructed. Estimated total area of repair is six (6) square feet. Unit 901 Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair and will require forming and pouring. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is three and a half (3.5) square feet. Unit 905 Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during demo and will require repair. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is seven (7) square feet. m • M L Engineering, Inc. Consulting Engineers 2030 37ih Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 Pic I Unit 805 surface spall Pic 3 — Unit 905 surface spall @ door Project No. 17-139C Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. �`•�'iNOIV ••�� G 0 Lul;; :EPL . e: M M L Engineering, Inc. Consulting Engineers 2030 37" Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc.cona Project No. 17-139C Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECT NAME: Bryn Mawr —Bldg. C CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: August 3, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Demo of all loose concrete is complete. Unit 802 Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is nine (9) square feet. Unit 805 na, front door The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. The top bars have minimal coverage and appears one bar was shifted during original pour when the building was constructed. Estimated total area of repair is six (6) square feet. Unit 901 Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair and will require forming and pouring. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is three and a half (3.5) square feet. Unit 905 Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during demo and will require repair. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is seven (7) square feet. e r•V M L Engineering, Inc. Consulting Engineers 2030 37" Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 Pic 1 Unit 805 surface 4; - Pic 3 — Unit 905 surface spall (a, door Project No.17-139C Report No.1 on: Gene Ross ElliottMerrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. K 79. Dulo TM Q �O pO •.FLOR•'�C .,��FFSS�ONP. 2 W, M L Engineering, Inc. Consulting Engineers 203037' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 569-4041 mlengineeringinc.com Project No. 17-139C Report No.1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECT NAME: Bryn Mawr—Bldg.0 CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue DATE: August 3, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways. OBSERVATIONS: Demo of all loose concrete is complete. Unit 802 Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is nine (9) square feet. Unit 805 c@ front door The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. The top bars have minimal coverage and appears one bar was shifted during original pour when the building was constructed. Estimated total area of repair is six (6) square feet. Unit 901 Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair and will require forming and pouring. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is three and a half (3.5) square feet. Unit 905 Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during demo and will require repair. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is seven (7) square feet. M L Engineering, Inc. Consulting Engineers 2030 370 Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 Pic 1 Unit 805 surface Pic 3 — Unit 905 surface spall @ door Project No.17-139C Report No. 1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. ,6„1 n 1 u••+ ,,• �.. NCHO/Vy o,+ idlait� Lug �: , : COPY �•��rc,FS81ONP; �``� 2 M L Engineering, Inc. Consulting Engineers 2030 37"Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772) 5694041 mlengineeringinc.com Project No. 17-139C Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello ConsL Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECTNAME: Bryn Mawr —Bldg. C CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue WORK INSPECTED: In progress concrete repairs DATE: August 23, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny OBSERVATIONS: Unit 204 Ceiling spall at east balcony has been demo and corroded reinforcing exposed. The contractor removed the concrete up to the sliding glass door. There is a corroded bar parallel with the sliding glass door and directly above the door track. The corrosion shall be chased until clean reinforcing is found. This will require removing the sliding glass door and constructing a temporary weather wall. We will inspect again prior to concrete placement. We sounded the concrete slab above at Unit 304 and found no deficiencies. Railing posts The walkway railing post replacement is in progress. The contractor has started on the 91h floor and will work down from there. ,��unngq� F 4 . i'ct�a�d 1. Lu5 .E: T: :•d.Q' FL 0F 0 '�C� Ot"FILE CV Y ��'•.' #FSSIis, ONP� •`• L M L Engineering, Inc. Consulting Engineers 203037' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc,com Pic 1 Unit 204 ceiling spall Project No. 17-139C Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Pic 2 Unit 204 corroded bar @ ceiling F I i ' �"%OFY . LE C 2 IVlit: IL.upy M L Engineering, Inc. Consulting Engineers 2030 37' Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinacom Project No. 17-139C Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION QIZ1r SLC BUILDING PERMIT NUMBER: 17i7.0,05. PROJECT NAME: Bryn Mawr— Bldg. C CLIENT: Elliott Merrill Community Mgt. CONTRACTOR: Daniello & Assoc. INSPECTED BY: Mike Lue WORK INSPECTED: In progress concrete repairs DATE: August 23, 2017 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias WEATHER: Sunny OBSERVATIONS: Unit 204 Ceiling spall at east balcony has been demo and corroded reinforcing exposed. The contractor removed the concrete up to the sliding glass door. There is a corroded bar parallel with the sliding glass door and directly above the door track. The corrosion shall be chased until clean reinforcing istfound„This will require removing the sliding glass door and constructing a temporarj ' weather WalI .Nye will inspect again prior to concrete placement. We sounded the concrete -slab above at Unit 304 and found no deficiencies. Railing posts The walkway railing post replacement is in progress. The contractor has started on the 9th floor and will work down from there. U a 5 V Ad� e x4 .� r M L Engineering, Inc. Consulting Engineers 2030 37" Avenue Vero Beach, Florida32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinc.com Project No. 17-139C Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Pic 1 Unit 204 ceiling spall t ) 2 M L Engineering, Inc. Project No. 17-139C Report No. 2 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue Chris Arias ` Daniello Const Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringinacom BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AlA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECT NAME: Bryn Mawr —Bldg. C DATE: August 23, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: In progress concrete repairs OBSERVATIONS: Unit 204 Ceiling spall at east balcony has been demo arid corroded reinforcing exposed. The contractot removed the concrete up to the sliding glass door. There is a corroded bar parallel with the sliding glass door and directly above the door track. The corrosion shall be chased until clean reinforcing is found. This will require removing the sliding glass door and constructing a temporary weather wall. We will inspect again prior to concrete placement. We sounded the concrete slab above at Unit 304 and found no deficiencies. Railing posts The walkway railing post replacement is in progress. The contractor has started on the 9th floor and will work down from there. • sF •GF,t F1;pR�• i {( b 3i�`+ Aft M L Engineering, Inc. Consulting Engineers 2030 37 ° Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 rulenginecringinc.com Pic 4 — Project No. 17-139C Report No. 2 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File post replacement in progress M L Engineering, Inc. Project No. 17-139C Report No.1 Consulting Engineers cc: Gene Ross Elliott Merrill 2030 37' Avenue Chris Arias Daniello Const. Vero Beach, Florida 32960 Carl Peterson SLC Bldg Dept Phone (772) 569-1257 File Fax (772)569-4041 mlengineeringinc.com BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBER: 1706-0045 PROJECT NAME: Bryn Mawr —Bldg. C DATE: August 3, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: In progress concrete repairs at walkways OBSERVATIONS: Demo of all loose concrete is complete. Unit 802 Surface spalls at 2 areas have been demo. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is nine (9) square feet. Unit 805 g front door The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. The top bars have minimal coverage and appears one bar was shifted during original pour when the building was constructed. Estimated total area of repair is six (6) square feet. Unit 901 Demo of all loose concrete is complete. A portion of the spall has turned into a full depth repair and will require forming and pouring. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is three and a half (3.5) square feet. Unit 905 Surface spalls at 2 areas have been demo. Two conduit PVC casings have been damaged during demo and will require repair. The existing reinforcing has minor surface corrosion and will require power tool cleaning and priming. Estimated total area of repair is seven (7) square feet. M L Engineering, Inc. Consulting Engineers 2030 37 ° Avenue Vero Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 Project No. 17-139C Report No.1 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File Re -inspection will be required after all reinforcing have cleaned and coated. .e`'��NONy''•. PL0R1,� ml 2 e 1 M L Engineering, Inc. Consulting Engineers 2030 371h Avenue Vern Beach, Florida 32960 Phone (772) 569-1257 Fax (772)569-4041 mlengineeringinacom Project No.17-139C Report No. 3 cc: Gene Ross Elliott Merrill Chris Arias Daniello Const. Carl Peterson SLC Bldg Dept File BRYN MAWR CONDOMINIUMS - BLDG. C 5055 NORTH HIGHWAY AIA, FT. PIERCE, FLORIDA THRESHOLD INSPECTION REPORT SLC BUILDING PERMIT NUMBE . 106-Q045 PROJECT NAME: Bryn Mawr IMAM DATE: October 18, 2017 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Assoc. PROJECT MGR: Chris Arias INSPECTED BY: Mike Luc WEATHER: Sunny WORK INSPECTED: Final inspection on all repairs OBSERVATIONS: The following repairs have been completed and are in accordance with design documents. Surface spalls: Balconies @ units 404, 501, 502 & 904 Walkway @ units 203, 204, 304, 404, 503, 604, 605, 701/702, 703, 802, 805, 901 & 905 Ceiling spalls: Balconies @ units 204 & 801 Slab edge repair: Balcony @ unit 306 (Northeast elevation) Deck coating: Walkway @ 151 floor south stair & unit 904 Railing post: lst floor north stair, units 302 (x2), 303, 305, 404, 502, 504 (x3), 505, 604 (x2), 702, 703, 901, 902/903 & 904 ill ir" .. a ...O &-I,i S •0`� C F .� ��520 ,;iry 0cA �;\�Q �IEcIDF.0dIE OCT 2 3 RECD 10