TO: Kathleen Collins Date: 07/18/17
3850 N. Hwy A1A #505 Job: 3850 N. Hwy A1A #505
Ft Pierce, FI.34949 TERMS: Deposit/Draws
ROVB, Inc. proposes the following scope and details for remodeling the property at the
above address:
1) Supply and install new kitchen cabinets, bathroom vanities (Customer to review and
approve design elevations and details prior to production), solid hardwood 4 panel
doors and jams, bi-pass closet with track and hardware, hinges, and door stops. Install
customer Baldwyn door knobs and slider hardware and retrofit door openings.
Beachland Millwork to supply materials and labor. Customer will visit and confirm all
details.
2) Supply and install 350' of primed baseboard 5/8" x 5 %" profile TBD and 344" of
primed casing'/<" x 3 %" profile TBD. Beachland Millwork to supply materials and labor.
3) Remove the kitchen ceiling and walls and cut the hallway wall as electric panel and
stack allows. Raise the ceiling approximately 8" or more. Frame the new ceilings and
new knee wall, tape and drywall to a level 4 finish. Remove hall and dining room
ceilings to gain same height as modified Kitchen ceiling with same process. ' t
4) Remove current duct system and replace with re -engineered ridged ducts (9) p�
allowing drop ceiling to be raised.
5) Replace all Sprinkler heads (12) throughout the unit, replace 4 existing pendants with
concealed heads and white plates in the kitchen and hall. Replace 8 sidewall heads with
white semi recessed heads and return system to service. Glue joints must set for 24
hours prior to restoring service.
6) Supply all electrical labor and basic electric hardware. (Chandeliers and specialty
lighting will be handled as time and material with Blais Electric plus 10% ROVB).
Replace all outlets and switches to Decora, move Washer/Dryer 220 line, move kitchen
switch to dining room area, remove phone outlet, move hall and bathroom switch by
bathroom door, remove 6" kitchen recessed lights, add 2 4" LED recess lights in hall,
add 6 4" LED recess lights in kitchen, remove vanity light in master bath, add 2 4"
recess LED lights over master bath sinks, add 1 4" recess LED lights in master bath
shower, replace master bath exhaust fan, replace master closet light with round LED,
Pg-1/3 Initial
add 1 4" recess LED in guest bathroom over sink, add 1 4" LED recess light over toilet
in guest bath, replace the guest exhaust fan, add closet light and switch in guest bed
room and install 6 dimmers. Materials included 13 recess cans, 1 15" LED fixture, 2
bath exhaust fans, 20 receptacles, 13 1 pole switches, 34 3 way switches, 6 LED
dimmers, 4 GFI outlets, 1 stack switch, 1 dryer outlet, wire, boxes and connectors.
7) Relocate Washer, install new valves, supplies and drains for all sinks, move water
lines and drain lines for kitchen sink, install new sink and faucet, run new ice maker line,
install and supply new Badger 5 garbage disposal. Cap and extend water lines and
drain lines in the master bath. Install new shower valve, trim and hand held slide bar,
change tub drain into shower drain and install pan for replacement shower in master
bath, install new toilet with new valves and supply line, install 2 lav faucets with new
supply lines, shut offs and p-traps. Install new shower drain and pan in guest bath,
install new shower valve with 1 shower head and trim, install 1 lave set with new valves,
supplies and drain and install new toilet with new supply and valves. Customer supplies
all fixtures and hardware. Build.com discounted Contractor pricing extended as
courtesy.
8) Remove wall paper, patch and spray orange peel to prep for paint. Caulk and putty
new woodwork and paint walls, doors and trim. Remove popcorn and texture
knockdown finish, seal and paint new ceiling. Customer to select color, n1p1prials
included.��-
9) Remove and replace living room and thn?om mirror crudes 2" bevel on every
seam. Front wall 1 cutout, back wall 4 pieces outs.
'V , n , jV4--n ti &-ys-"
10) Demo floor, both bathroom shower/tub, and all kitchen and bathroom vanities.
Rebuild bathrooms. Supply and replace/water proof Durarock, tile both baths suppling
thin set and mortar mix. Tile master including seat, comer shelf and niche. Tile Guest
including comer shelf or niche. Customer to supply tile. Shower Glass Pane in Master
and framed shower door in Guest included.
Install new the floor throughout unit supplying the cork membrane, glue and thin set. Tile
to be installed on the diagonal. Customer to supply the tile.
11) Supply and install grade 2 granite counters in kitchen and baths. Customer selects
from Stones of Italy.
12) Supply and install Impact Vinyl Horizontal Rollers and Sliding Glass Doors. White
frame insulated low E 366 glass flange- See previous quote for size and detail. Original
Quote $12,638. Revised courtesy discount $1268.
Pg- 2/3 Initial
Total $120,502.00
Does not include new appliances nor will any ROVB fee apply. ROVB has a close
working relationship with Caprdta Appliance in Melboume and will coordinate delivery
and installation of all appliances. Courtesy discount is passed on to customer.
Does not include any low voltage requirements. ROVB has a close relationship with the
Audio -Visual Guy in Palm Bay and will coordinate and work into our schedule if
required. No fee will apply and the customer pays directly to the installer.
ROVB to charge 10% of cost applicable for all customer supplied materials. Will be
shipped to Commerce Glass C/O ROVB. Fee includes delivery acceptance and
transporting to job site. Customer to copy invoices to ROVB.
PAYMENT SCHEDULE:
7 I`t
Deposit7$3 00 (Pe, and misc.)* Drawl ($15,200) - Payable upon submission
of permit o Draw 2 ($35,000)- Payable upon issuance of permit Draw 3
($45,000)- Payable upon receipt of cabinets and windows Final Payment ($22,302)
**Any ROVB labor ordered, needed or required and is not included will be will be billed @ T & M
$40 per hour.
mt,k,cr 1ANUL Or PROPOSAL —the above prices, specifications and conditions are
satisfactory and are hereby accepted. Your signature below authorizes ROVB, Inc. to do the
work as specified. Payments will be made as follows: NON RFFt�nlnecer c.ae....�;. ;
-•--• .*a.�. o..w.uamy ;ry rccr urava On Orgeled materials Any alteration to deviation
from specWcations above involving extra costs will be executed only upon written orders, and
will become an extra charge over and above the estimate. All agreements contingent upon
weather, strikes, accidents or delays beyond our control. In the event it becomes necessary for
ROVB, Inc. to institute an action to collect amounts due pursuant to this agreement, Client shall
be responsible for all legal fees and costs incurred by ROVB, Inc. incident to said action. By
signing you are agreeing to this agreement/work order and are authorizing ROVB Inc. to act on
your behalf in good faith to complete work in a satisfactorily & timely manner.
Signature Da e
RR# 282811695
ROVB.net
ROVB, Inc. Page 313
L
i
xnTME COLLINS Morgan Stanley 1001
P.O. BOX 203 ��
PURDYS, NY 10578-0203
UNITED STATES
Date
'�
Order of e l l0 )7i3 —=1VC,1
�01,
C 1
UN0 6m4.ILt Egnme
i0�6
�ma, Cep N.1ME M0"IN Aa dy—
J
1:0440008041:890 206 24331 26u'/ 100 1