SCOPE OF WORK
5.23.17 - REVISED 8.28.17
JOB: REED, JOHN & ROXANNE
5167 N. ALA
UNIT 101, OCEAN HAROR NORTH
FT. PIERCE, FL 34949
ROOMS: KITCHEN & MASTER BATH
CONTRACTOR:
PULL PERMIT AS NEEDED.
DISCONNECT KITCHEN SINK; REINSTALL VI
DISCONNECT AND REINSTALL BATHROOM
REINSTALL W/NEW CABINETS
REMOVE EXISTING APPLIANCES; TO BE RE]
& COUNTERTOP INSTALL.
DEMO AND DISPOSE OF EXISTING CABINET
KITCHEN AND MASTER BATH.
7722341.969 p.2
it Up Copy
Ell
1
Lu E COL7+T UILDr--G DT lSiO\
V7-VNTED FOR GaXIPLIANI C>•.
AND PERN11T 11UST BE KEPT ONJOB
D\SP_CTION IVILL BE _N' "J_"..
CABINET INSTALLATION.
FAUCETS AND
ALLED AFTER CABINETRY
COUNTERTOPS & TILE IN
YOU WILL, BE RESPONSIBLE FOR PROTECTING EXISTING HOUSE DURING
CONSTRUCTION BY SEALING OFF ADJACENT ROOMS AND CLOSING OFF AC
REGISTERS AS NECESSARY FROM SPREADING DUST THROUGH OUT
HOUSE.
ANY DRYWALL REPAIR AND/OR PAINT
PLUMBER:
REINSTALL NEW FIXTURES PER CLIENT
TOILET.
CLIENT PURCHASING PLUMBING FIXTURES
BEGINNING OF DEMO.
ELECTRICIAN:
AFTER TILE WORK IS DONE, REINSTALL EMS
REINSTALL ALL COVER PLATES AND CHECK
FUNCTION.
AS NECESSARY.
; REINSTALL EXISTING
TO BE ON JOB SITE AT
1 APPLIANCES;
OUTLETS FOR PROPER
Rug 28 2017 4:59PM PRLM ISLRND PLRNTRTION 7722341969 p.3
COUNTERTOP CONTRACTOR:
TO PROVIDE AND INSTALL NEW COUNTS
BATHROOM VANITY - PER PLAN & BACK
IN KITCHEN & MASTER
I TILE IN THE KITCHEN.
TILE CONTRACTOR:
DEMO AND DISPOSE OF DRY FLOOR TILE AN SHOWER CEILING TILE IN
MASTER BATHROOM. EXISTING CORIAN SH WER WALL TO BE ABRADED
WITH SANDER IN PREPARATION FOR NEW TI E. REMOVE SHOWER DOOR.
TOILET REMOVED BY SURFACES. TO BE RED STALLED BY OTHERS.
BLOCKING FOR GRAB BAR BEHIND EXIST
NICHES IN SHOWER IN EXISTING CORIAN,
PROVIDE AND INSTALL NEW TILE IN
PER PLAN
PAINT CONTRACTOR:
PAINTING NOT INCLUDED IN THIS
WALLS TO BE PAINTED WITH BENJAMIN
WASHABLE NO GLOSS MATTE FINISH
TRIM TO BE PAINTED WITH BENJAMIN
GLOSS.
2
CORIAN & FRAMING FOR (2)
& KITCHEN BACKSPLASH
REGAL SERIES
REGAL SERIES LATEX SEMI-
.:Rug 28 2017 4:59PM PRLM ISLAND PLANTATION 7?PP341969 P.1
WESTM
CONSTRUCTION
August 28, 2017
Fax to: 772462-1578
Mr. Graham Christie
Plans Examiner
St. Lucie County
Re: Permit 41708-0297
Reed Residence — 5167 N. AlA, Unit 101
Dear Mr. Christie:
In follow-up to our conversation this morning, attached i
performed at subject residence. This revised scope does
electric, rough plumbing, or drywall installation. Theref
requirement for inspections 140, 238, 423, and 147 shoo
None of the existing walls were removed to require new
and electric inside the walls disturbed. Tile was remove,
drywall material removed and replaced.
Please confirm that you have eliminated the stated
work as planned ,
Tha s for your cooper 'on.
Michael iiunl
Vice President/General Contractor
CGCO27968 — SLC #26759
3003 CARDINAL DRIVE, SUITE D, VERO
P 772.234,2978 F 772.234.E
RECEIVED
AUG 282017
PERMITTING
St. Lucie County, FL
the revised Scope of Work to be
tot impact rough framing, rough
re, we request that you please eliminate
t in the permit.
nor was any of the plumbing
e drywall, but there was no
and that we can proceed with
FL 32963