Loading...
HomeMy WebLinkAboutDESIGN PRESSURE CALCULATIONSPhone 954-784-2941 Aedefral 800-848-1919 & TESTING INC. Fax 954-784-7875 250 SW 13th Ave Pompano Beach, Fl- 33069 fed-ena.com BY St. Lucie County DATE: 10/13/17 Order No.: R17-596 R1 CLIENT: Advanced Commercial Roofing ADDRESS: 1924 North Elm Street: Muncie, FL 47303 PROJECT: PSL Professional Condo Association Flat Tectum Deck ADDRESS: 8479-8519 South U.S. 1; Port St Lucie, FL 34952 ASCE 7-10 DESIGN PRESSURE CALCULATIONS In Accordance with Chapter 30, Part I Prolect Information: Height = 15' Length = 475' Width= 511 Parapet Wall: < 3' Desism Calculations: Flat Tectum Deck Exposure: C Category: II Slope: < 7' Ultimate Windspeed: V.ie= 170 mph Basic Windspeed: Va,d = 132 mph K.= 0.85 Velocity Pressure: q = 0.00256*[(0.85)(1.0)(1.0)(132)1] ECEIVE. t = 37.9 pqf OCT 2 6 2017 1 Width of Pressure Coefficient: 0. 1 (5 F) = 5.1' 0.4(15') = 6.0' )use: 5. 1 R BY. - Effective Wind Tributary Area: < 1 OR2 For parapet height 3 feet or larger, zone three (3) can be treated as zone two (2) (ASCE 7-10). External Pressure Coefficient: 1) GCPl = -1.0 2) GCP2 = -1.8 3) GCP3 = -2.8 Design Pressures: Zone I Field: Zone 2 Perimeter: Zone 3 Comers: Internal Pressure Coefficient: 1) GCPi = 0.18 71 :�ii "IVA ' 01MIA I P1 = 37.9*(-1.0-0.18)= 44.7 psf P2 = 37.9*(-1.8 - 0.18) = -75.1 psf P3 = 37.9*(-2.8 - 0.18) = -113.0 psf PHAW EM MDADE Construction Material American Concrete Miami Dade Florida Department Engineering Council Institute County of Transportation !�J Page 2 10/13/17 Flat Tecoun Deck PSL Professional Condo Assn. 8479-8519 S. US I Port St Lucie, FL Pursuant to your request, Federal Engineering & Testing, Inc. has reviewed the proposed scope of services for the above referenced project site. The existing roof system consists of a cementitious wood fiber roof deck covered with a built up roof system covered with a second system consisting of EPS insulation board covered with a single ply membrane. It is our understanding that the top roof system consisting of EPS insulation covered with a single ply membrane is to be removed and disposed of. The remaining underlying roof system is to remain. Any areas of the underlying roof system needing repairs will be addressed after removal of the upper roof system. After repairs, the remaining roof system is to be covered with a Reinforced Maintenance. Coating System. Due to the fact that the underlying roof system to remain in place does not have any layers of insulation and is , placed on a porous cementitious roof deck; no trapped moisture is likely to remain within the underlying root system after removal of the upper EPS insulation and membrane system; therefore no TAS-126 moisture test would be needed. No additional fasteners are required for the .new Reinforced Maintenance Coating System which is adhered directly to the existing roof system; therefore no TAS-1 05 fastener withdrawal testing would be needed. Federal Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of yoW project. If you have any questions or comments, give us a call. S, 1 k 'Keith -.LeBlanc;,P.E. /0 ted&il Engineeiing & Testing, Inc. 'Florida Reg.-No.'59394 Certificate of' r Authorization #5471 Miami-phde:County Certification #16-0203.07