HomeMy WebLinkAboutAPPLICATION AND CERTIFICATE FOR PAYMENT'G702:�,_,_ " 'APPLIdATION and CERTIFICATE for PAYMENT To: Oceamise Condominium 10310 S Ocean Drive Jensen Beach, Florida From: Blue coast Construction 2587 SE Monroe at Stuart, Florida 34997 Contract For: Concrete Restoration APPLICATION FOR PAYMENT Project: Oceanrise condominium Concrete ApplicationNo: 3 Restoration SCANNED App. Date: March 13, 2018 BY Period to: St. Lucie County Project No: Contract Date: Engineer: Mathers Engineering Application is made for payment, as shown below, in connection with the Contract Continuation Sheet, G703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net Change By Change Orders 168,002,88] 3. CONTRACT SUM TO DATE 168.002,881 4. TOTAL COMPLETED AND STORED TO DATE 168,00 5. RETAINAGE: a. of Completed Work b. of Stored Material TOTAL RETAINAGE 0,001 6. TOTAL EARNED LESS RETAINAGE 168,002.88 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 8. CURRENT PAYMENT DUE 14,532.93 9. BALANCE TO FINISH, INCLUDING RETAINAGE 0,001 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner 168,002.88 0.00 Total approval this Month 0.00 0.00 TOTALS 168,002.88 0.00 NET CHANGES by Change Order 168,002.88 Distribution to: 0 OWNER 0 CONSTRUCTION MGR. L1 ARCHITECT L1 CONTRACTOR Z ENGINEER The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CONTRACTOR: By: Date: State of'. County of Subscribed and sworn before me this -dayof The above personally appeared before me, the undersigned notary public, and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief. Notary Public: My Commission expires: ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Engineer certifies to the Owner that to the best of the Engineer's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and an the Continuation Sheet that are changed to conform to the amount oertified.) ENGINEER By: Date: This Certificate is not negoriable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. CAUTION: You should use an original document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. "CAUTION: You should use an original document which has his.caution printed in red. An original assures that changes will not be obscured as may occurwhen documents are reproduced. CONTINUATION SHEET G703 PROJECT. Ocearrise condominium Concrete Restoration Blue coast Construction Page 1 of 2 Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Application No: 3 Contractor's signed Certification is attached. App. Date: March 13, 2018 Use Column I on Contracts where variable retainage for line items may apply. Period to: Project No: A B C D E F G H I Item # Description of Work Schedule of Values Work C Materials Stored & Used Prior + Current Total Completed and Stored To Date % Balance to Finish Retainage From Previous Application(s) This Per ad 0.1 Permit 2,288.13 2,288.13 -2,288.13 0.2 Mobilization 5,000.00 5,000.00 -5,000.00 1 Edge Repair for Full Depth 0.00 11,660.00 0.00 11,660.00 ?1 -11,660.00 0.00 2 Half Deck repairs 0.00 2,921.80 0.00 2,921.80 ? -2,921.80 0.00 3 Full Depth Repair 0.00 74,577.60, 0.00 74,577.60 ? -74,577.60 0.00 4 #5 Dowels up to 12" 0.00 17,400.00 0.00 17,400.00 ? -17,400.00 0.00 5 Reinforcing #3 bars MMFX 6 Reinforcing #4 bars MMFX 0.00 2,381.30 0.00 2,381.30 ? -2,381.30 0.00 7 Reinforcing #5 bars MMFX 0.00 3,981.25 0.00 3,981.25 ? -3,981.25 0.00 8 Ceiling Spells (+/4 inches) 0.00 0.00 0.00 0.00 ?, 0.00 0.00 9 Beam Spalls (Lx6"x6") 0.00 0.00 0.00 0.00 ? 0.00 0.00 10 Column Spalls (Lx6"x6") 0.00 0.00, 0.00 0.00 ? 0.00 0.00 11 Stucco repairs 0.00 0.00 0.00 0.00 ? 0.00 0.00 12 Shutters Removal 0.00 4,914.00 0.00 4,914.00 ? -4,914.00 0.00, 13 Shutters Re -Install 216.00 4,698.00 4,914.00 -4,914.00 14 Doo Frame Removal/Re-Install 1,200.00 2,520.00 3,720.00 -3,720.00 15 Doo Framing bottom Track Removal 0.00 0.00 0.00 0.00 9 - 0!2 0.00 16 Tile Removal / old membrane 0.00 174.90 0.00 174.90 -17� go 0.00 17 Rust Spots 1 0.00, 540.00, 0.00, 1 540.001 ?1 -540.00 0.00 PAGE 1 TOTAL: 1 0.001 127,254.981 7,218.001 1 134,472.981 ?1 -134,472.981 0.0 A=Une Item Number B=Brlef Item Description C=Total Value of Item D=Total of D and E From Previous Application(s) (if Any) E=Total Work Completed For This Application F=Materials Purchased and Stored for Project G=.Total of All Work Completed and Materials Stored for Project H=Remaining Balance of Amount to Finish I=Amount Withheld from G TORGO SO�ARE �.TbrgoScftware.wm 01996-2013 �L RIGHTS RESERVED CONTINUATION SHEET G703 PROJECT., Oceanrlse condominium Concrete Restoration Blue coast Construction Page 2 of 2 Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing Application No: 3 Contractor's signed Certification is attached. App. Date: March 13, 2018 Use Column I on Contracts where variable retainage for line items may apply. Period to: Project No: A B C D I E F G H I Item Description of Work Schedule of Values Work C mpleted Materials Stored & Used Prior + Current Total Completed and Stored To Date % Balance to Finish 1 Retainage From Previous Application(s) This Period 18 Wall Cracks (Caulking) 0.00 0.00 0.00 0.00 ? 0.00 0.00 19 Gardrail post Pocket repairs 0.00 0.00 0.00 0.00 ? 0.00 0.00 20 Interior Dust Wall Installation and Removal 0.00 3,440.00 0.00 3,440.00 ? .3,440.00 0.00 21 Gardrall Screen Removal / Re -install 0.00 4,700.00 0.00 4,700.00 ? -4,700.00 0.00 22 Concrete Beam Repair 0.00 3,055.00 0.00 3,055.00 ? -3,055.00 0.00 23 Concrete Column Repair 0.00 7,134.40 0.00 7,134.40 ? -7,134.40 0.00 25 Grinding Decks 0.00 2,358.00. 0.00 2,358.00 ?. -2,358.00 0.00 26 Drip Edge Installation 0.00 196.50 0.00 196.50 ?1 -196.50 0.00 27 Winclow Barrier during Hurricane 0.00 0.00 0.00 0.00 ? 0.00 0.00 28 Cathodic Protection 0.00 0.00 0.00 1 0.00 ? 0.00 0.00 29 Screen Anchor Removal 0.00 0.00 0.00 R3,5000 0.00 ? 0.00 0.00 30 Waterproofing Membrane 0.00 7,074.00 0.00 7,074.00 ? -7,074.00 0.00 32 Flashpatching 33 Sika Ferroguard 903 0.001 2,072.00 .0 000 2,072.00 ? -2,072.00 0.00 34 Balcony walls and ceiling paint 1 000 3.500.00, -3,500.00, PAGE 2 TOTAL: 1 0.001 30.029.901 3,500.001 1 33,529.901 ?1 -33,529.901 0.001 GRAND TOTAL: 1 0.001 157,284.881 10,718.001 1 168,002.881 ?1 -168.002.881 0,001 A=Une Item Number B=Brief Item Description C=Total Value of Item D=Total of D and E From Previous Application(s) (If Any) E=Total Work Completed For This Application F=Materials Purchased and Stored for Project G=Total of All Work Completed and Materials Stored for Project H=Remaining Balance of Amount to Finish I=Amount Withheld from G TORGO SOFTWARE �.TorgoSoftwam.wm 01996-2013ALL RIGHTS RESERVED . I ,;� -, .� .