Loading...
HomeMy WebLinkAboutPRE-BUILDING PERMIT ADDENDUM- 2431 SE Dixie Highway RECEIV.tuart, FL34996 r JULJUl 1 2017 SCANNED Phone: (772) 287-0525 MATHERS ENGINEERING BY EB#004456 CORPORATION BY Lucie County PRE -BUILDING PERMIT ADDENDUM 35Pl7o 7- oV.S2 Date: July 18, 2017 BUILDING DIVISION REVIEWED FOR To: St. Lucie County Building Department REVIEWED BYCOMPLI 2300 Virginia Avenue DATE 7.-/ Fort Pierce, FL 34982 LANs qN PEP� IT — MUST BE KEPT OhVJOB OR NO INSPECTION WILL BE MADE Referenced Project: Concrete Restoration for Exterior Balconies For Units' 103, 203, 205, 305, 208, 308, 507, 607, 603, 703, 607, 707, 610 and 710 For Atlantis III by The Sea Condominium Located at 10200 S. Ocean drive, Jensen Beach, FL 34957 THr SE PLANS AND ALL PROPOSED WON ARE SUBJECT TO ANY CORRECTIONS Contractor: Blue Coast Construction RcOUIRED BY FIELD INSPECTORS THAT Stuart,Monroe Street 1 LAY BE NECESSARY 114 0,9 TO Stuat, FL 34997 Background: COUIPLY WITH ALL A,ppliCAS1.E CCi3E3. The removal and restoration of deteriorated concrete and steel within beams, columns, decks and adjacent walls will comply with the IRCI Guideline No. 03730 (a copy of which is attached hereto) or as modified by Engineer as work progresses. The anticipated work involves the initial demolition, and then the removal, replacement and restoration of concrete and reinforcement as required. The degree of restoration is currently unknown, until such time as the initial demolition has begun. The anticipated sequence of repairs is as follows: FILE • Shoring required for repairs of all columns, beams and decks (if required by engineer) e Removal and restoration of concrete and reinforcement steel within beams, columns and decks. (ICRI Guideline No. 03730) • Minor chipping and patching of areas not requiring full depth repairs. • Applied deck coating. The following materials are approved for anticipated use in this restoration (see attached manufacturers specifications): • Sikacrete 211 Concrete Mix. • SikaTop 123 PLUS. • Sika Armatee 110 EpoCem bonding agent and rebar coating. • Sika FerroGard 903. • Sikagard 701 W. • BASF MasterSeal 550 — cementitious membrane. • BASF MasterSeal® Traffic 1500 MasterSeal M 200 SLV (self -leveling base coat). • BASF MasterSeal® Traffic 1500 MasterSeal TC 225 HT (Tint Base Coat). �.4 MATHERS ENGINEERING CORPORATION 2431 SE Dixie Highway Stuart, FL 34996 Phone: (772) 287-0525 EB#004456 The above sequence is general in nature and will be modified as restoration work progresses. Observations of the initial demolition will determine any required modifications to the above procedures and materials selected for the final restoration process. Based on initial visual observations, repairs will not require shoring; however, in the event the demolition work reveals that shoring will be required, the engineer will instruct the contractor to shore the area as well as the number of levels required. The instructions given to the contractor will be submitted to the Building Department with the final close-out documents. . We have been authorized by the Association to work with the contractor during the restoration and, will inspect work partially completed as well as observe results of the new demolition prior to field authorizing the repairs to be completed. The proposed concrete restoration work, except as authorized by the engineer's modified instructions, will comply with specifications outlined in the IRCI Guideline No. 03730, as well as the applicable minimum building codes and the applicable fire safety standards as determined by the local authority in accordance with Chapter 553 and Chapter 633 of the Florida Statutes where applicable to concrete restoration. Approved ���p,THFRs; �N SE ;w= _ ;z= William J. Mathers, PFESSIO�\��� Florida License #19658 Special Inspector FL License #SI-155 o„t Pa