Name of Applicant Michael Calandrillo, St. Lucie Realty Group, LLC Phone No. 954.646-6390
Mailing Address 469 Mariner Drive, Jupiter, FL 33477
TYPE OF PROJECT (CHECK ONE)-aRESIDE
Name of OWNER responsible for utility after installation 01A
Phone No Email
Ultimate OWNER does not take possession until acceptance of work.
Pennittee representative responsible for notifying St. Lucie County 48 hours prior to working in County Right -of -
Way RodedckJ. Kennedy, PE-EDO We shall commence construction of the permitted installation
within 60 days of permit issuance and complete same within 30 days thereof.
Contractor's Name Ali County Paving Phone No (REQUIRED) 561-56e-0949
Mailing Address 1190 SW 10 steel, Delray Seem, FL 33444
E-Mail Address Jcchan®allcountypavirg.com
As the Applicant, we request permission to construct road drainage, or combination drainagetutility, in Right -of -Way or easements
deeded to or maintained by St Lucie County, or dedicated to the public areas of St Lucie County, (hereinafter referred to as
"County Right -of -Way"). Type of work that is being performed in County Right -of -Way, and name of County
Road' Pdma Main a1Vd • 1 driveway clmure and 1 ddVeway aaeravon
The following MUST be submitted with an original signed copy of this application (3 COPIES OF EACH).
1) Detailed maintenance of traffic plan from FDOT's "Design Standards 600 Series". If traffic control requires detours, and/or
road closures, a Florida Registered Professional Engineer will be required to design, ",and seal said plans.
2) Show on an attached set of plans C11"xl7" or if requested 24"x 36") the location and character of the work, and detail rite aspect
of the work thaz will disturb County mainmined improvement (hereinafter referred to as "IMPROVEMENTS").
This permit and all Its attachments must be k of on the work jity and be available upon reaaest or prominently displayed
Applicant Michael Calandrilio, St Lucie Realty Group, LLC Title ManaAirg Member
f2:/2
By proceeding with installation of work covered by this permit, I agree to comply with the "GENERAL
CONDITIONS OF THE RIGHT-OF-WAY PERMIT".
Reviewed
Reviewed
The aforestated installation is hereby permitted under the following
BOARD OF COUNTY COMMISIONERS, ST.
JAN r.14 2017
JAN 10 2011
Revised October 2
Page 1 of 3
PRECUVEID
14
IW PERMIT NO. � �� +
C Ire,
,0`J�D5
.�6iN J +i9is :J
;iit l4s[ 6tllt` PROPERTYACQUISITIOIVS
Name of Applicant Michael Calandrino, St. Lucie Realty croup, LLC Phone No. 954.646.6390
Mailing Address 469 Mariner Drive, Jupiter, FL 33477 Email calmlkeoos®aol.com
TYPE OF PROJECT (CHECK ONE) ❑ORESIDENTIAL DaCOMMERCIAL ❑oUTILITYDoDEVELOPMENT ORDER
Name of OWNER responsible for utility after installation NIA
Phone No Email
Ultimate OWNER does not take possession until acceptance of work.
Permittee representative responsible for notifying St. Lucie County 48 hours prior to working in County Right -of -
Way Roderick J. Kennedy, PE -EDC We shall commence construction of the permitted installation
within 6D days of permit issuance and complete same within 30 days thereof.
Contractor's Name AI County Paving Phone No (REQUIRED) 561.588.0949
Mailing Address 1180 SW 10 Street, Delray Beach, FL 33444
E-Mail Address JCohen®allcouotypaving.com
As the Applicant, we request permission to construct road drainage, or combination drainage/utility, in Right -of -Way or easements
deeded to or maintained by St. Lucie County, or dedicated to the public areas of St. Lucie County, (hereinafter referred to as
"County Right -of -Way"). Type of work that is being performed in County Right -of -Way, and name of County
Road: Prima Vista Blvd-1 driveway closure and 1 driveway alteration
The following MUST be submitted with an original signed copy of this application (3 COPIES OF EACH).
1) Detailed maintenance of traffic plan from FDOT's "Design Standards 600 Series". If traffic control requires detours, and/or
road closures, a Florida Registered Professional Engineer will be required to design, sign, and seal said plans.
2) Show on an attached set of plans (I1"xl7" or if requested 24"x 36") the location and character of the work; and detail the aspect
of the work that will disturb County maintained improvements (hereinafter referred to as "IMPROVEMENTS").
This Permit and all its attachments must be kept on the work site and be a"Unble upon request or anoint nanny displayed.
Michael Calandrillo, St. Lucie Realty Group, LLC Title Managing Member
By:
By
"citi:00912 S'nd
_Date /T��Zo�%iy
permit, I agree to comply with the "GENERAL AND SPECIAL
OF THE RIGHT-OF-WAY PERMIT".
OFFICE USE ONLY
Reviewed By
ACQUISTIONS DIVISION DATE
Reviewed By
ROAD & BRIDGE DIVISION_ DATE
The aforestated installation is hereby permitted under the following provisions
BOARD OF COUNTY COMMISIONERS, ST. LUCIE COUNTY, FLORIDA
By County Engineer -enforcing official
R/W PERMIT NO. 01Z —00�
RECEIVED
Revised October 28, 2015
JAN and 2017 1
Page l of
EN 11tIVERING
APPENDIX P-I
GENERAL CONDITIONS OF RIGHT-OF-WAY PERMIT
The applicant declares that prior to filing this application, he/she has (1) ascertained the location of existing utilities that would be
affected by the proposed installation, and (2) notified such affected utility owners in writing regarding same, and (3) correlated the
proposed installation with owners of such utilities and determined that the proposed installation can be made without detriment to such
existing utilities. If granted a permit for construction of proposed installation on County rights -of -way, the applicant agrees to the
following:
1. Safety: All construction work shall comply with the safety provisions of all federal, state and local laws.
2. Traffic Control: Measures shall be provided during construction in accordance with the FDOT Design Standards 600 Series.
Traffic shall be maintained to the degree required by the County Engineer.
3. To Save Harmless the Board of County Commissioners and each and every member thereof from the payment of any
compensation or damages resulting from the exercise of rights and privileges herein granted.
4. In the event that modification or repair of the improvements on aforestated County right-of-way becomes necessary, to
promptly movelremove the installation permitted herein, as requested by the Board of County Commissioners of St. Lucie
County, Florida, at no cost to the County.
5. Removal of Installation: In the case of noncompliance with the requirements stated herein, the installation permitted herein
will be promptly brought into compliance or removed from County right-of-way by applicant at no cost to the County,
6. Repair of Improvements by Permittee• Applicant agrees to promptly repair any damage/injury to improvements on County
right-of-way caused by reason of the exercise of rights and privileges herein granted, restoring same to a condition equal to
that which existed immediately prior to the infliction of such damage or injury in a manner satisfactory to the County.
7. 'Permit Life: If this permit is granted, it shall be valid for a period of 180 calendar days from date of approval subject to
termination by the County in the event that improvements on aforestated County right-of-way are to be
constructed/reconstructed, or in the event that such right-of-way shall be closed, abandoned, vacated or discontinued.
8. The attached sketch(s) covering details of the permitted installation shall be made a part of this permit. Deviations from the
approved work or maintenance of traffic plan shall require prior approval of the County Engineer.
9. Notification to County Engineer: The County Engineer's office shall be notified twenty-four (24) hours in advance of starting
work on County rights -of -way. New construction that is discovered to have begun without notification will be subject to a stop
work order until proper permits have been acquired. Unless the work activity is accomplished in continuous work days
(excluding weekends and holidays), re -notification shall be required upon any lapses.
10. Permit on Job Site: All projects requiring a County Right -Of -Way or Driveway Permit will be required to have a copy of the
permit on the job site and be able to produce said copy when requested. Failure to do so will be considered as operating without
a valid permit and operations shall cease and desist. As in the past, field work that is classified as maintenance will not be
subject to the above. The exception on maintenance would be in the event excavation adjacent to a roadway is to be left open
ovemight. We would want notification for the purpose of inspecting for adequate barricades, lights, etc.
11. Riehts of a Prior Permittee: The construction and maintenance of aforestated installation shall not interfere with the property
and rights of a prior permittee.
12. Final Inspection: The County Engineer's office shall be notified by the applicant upon completion of the installation permitted
herein, so that a final inspection may be made.
13. Other Entities: This permit in no way waives the authority and/or jurisdiction of any other governmental entity. Applicant is
solely responsible for ensuring that all other stakeholders affected by the work or that have ownership of the work site, or
portions thereof, have been adequately notified and have given permission to perform work.
Revised October 28, 2015
Page 2 of 3
SPECIAL CONDITIONS OF RIGHT-OF-WAY PERMIT
1. Applicant agrees that in case of future damage (test of time) to the right-of-way or pavement due to subject installation, the
applicant shall repair and restore same to condition acceptable to the County Engineer.
2. Applicant agrees that the expense for any modifications to subject utility installation required before, during or after any future
right-of-way, drainage or roadway improvements are implemented shall be borne solely by the applicant, including but not
limited to: removal, relocation, manhole adjustments, etc.
3. All work done within right-of-way shall be done Monday through Friday, 8:00 AM - 5:00 PM, excluding County observed
holidays and County closures, unless otherwise approved by the County Engineer. Any work performed after hours shall
be supervised by a County Inspector. for which the Contractor shall reimburse the County at the current Inspector
rate.
4. Any road closures shall be requested in writing, along with an accompanying traffic detour plan for review, to the County
Engineer fourteen (14) days prior to requested closure. The County Engineer reserves the right to modify the maintenance of
traffic (MOT) as needed based upon performance.
5. Any approved open pavement cut or trench cut in proposed limits of future pavement shall be restored to FDOT and St. Lucie
County standards.
6. No excavation shall take place within a minimum of five (5) feet of the edge of pavement or within the Clear Recovery Zone
(CRZ). This distance may be increased by County Engineer dependent upon posted speed limit of roadway.
7. Minimum cover of 36" under the travelway and 30" elsewhere, including swales/ditches, shall be maintained over the utility.
Conflicting utilities shall maintain 18" separation unless specifically approved by County Engineer.
8. Jack & Bore or Directional Bore installations shall be done per FDOT specifications. Casings under the travelway shall extend
a minimum of eight (8) feet beyond the edge of the travelway. Bentonite or drilling fluid shall be removed from project site
same days as drilling operations.
9. Driveways, roadways, trenches and/or sidewalks shall be restored per the detail approved on the plans or specified in this
permit. Proof of compaction shall be copied to the County Engineer.
10. Two (2) sets of certified record drawings shall be submitted to this office immediately upon completion of subject utility
installation.
11. Dependent upon the type of project, additional permits) and/or agreement(s) may be required prior to approval of the right-of-
way permit.
Revised October 28, 2015
Page 3 of 3
DISTANCE BETWEEN
SIGNS
Speed
Spacing L."A 8
a0 mph or less
350
crop
350
145
50 mpg or greater
1 500
1 500
•250 beyond the ROAD WORK AHEAD sign or
midway between Signs whichever Is less.
r— Median J
Device Spacing
Speed
,mph)
Mai. Distance Bermem. Devices (nJ
Cones or
Tubular Markers
Type I or Type 11
Larches. or Vertical
Panels or Drums
Text
I Tangent
Taper
I ran'.
25
ZS
50
25
50
3o d5
0 t
ZS
50
30
50
50 re To
25
1 50
50
100
GENERAL NOTES
I. wban a high chave of work vehicles are meeting and leering the Work Area al
Md. place an In In
ar
,,a or shave, bad 10 MH eow be posted
st
SYMBOLS
the ROAD WORKI AHEAD sign location and shift a ROAD mORKRAHEAD s/gnn
® work Area
upstream 500 ft.
2. This TCZ plan also applies to wart performed In the median more than Z but
• Channellring Gavlre(Sea Index No. 600)
less than IS from the edge or travelnay.
D work Zone Sign
3. Wben work is Win, performed On a multilane undivided re.ow., the signs
nor mall, momnee in the median (as shown) shall be warned.
b Lane IdentlfleaHon ♦ Direction or Traffic
a. WORKERS signs to be removed or full, covered when no an is being pefrmed.
S. SHOULDER WORK sign may be used as as alternate to the WORKER synowl sign
6. When a side road Intersects the highway within the ITT zone, additional TTC
devices Shall be placed in accordance with other applliable TCZ Indexes.
T. For general TCZ requirements and additional information, refer to Index No. 600.
Table II
Taper Length - Shoulder
Speed
rmpN
Pd rnd
g Ip• IP
sneer. smdr. snmr.
rcores
25
28
35
at
L. WS'
30
40
50
60
35
S5
68
02
60
40
72
90
107
45
120
150
180
L W5
50
133
16,
200
55
la>
HIT
220
60
160
200
ioo
65
l)l
217
260
TO
18T
233
280
e' coin/mum shoulder width.
VA -Length Of shoulder toper in Is.
VI meth or total shoulder In fee
(combined pawed and embeeee width)
DURATION NOTES
1. Signs and formalizing devices me, be omiued it all of the
S = Pasted speed Most !mph)
following conditions are mew
a. Wort operations are 50 minutes or less.
b. Vehicles In the wart area have high-imensin. rotating.
!lashing. oscfli&ia,. or strobe lights operating.
CONDITIONS
WHERE Any VEHICLE, EQUIPMENT.
WORKERS On THEIR ACTIVITIES
ENCROACH THE AREA CLOSER THAN
15' BI? NOT CLOSER THAN 2 TO
THE EDGE OF TRAVEL WAY.
PAST 20 DESCRIPTION: INOEX 5HEET
gEYISION N FY ZDl7-1B
FDOTT MULTELANEt WORK ON SHOULDER n0. rvo.
01/01/16 a 1 DESIGN STANDARDS 612 1 Of 1
CONSTRUCTION PLANS AND SPECIFICATIONS
FOR
PORT SAINT LUCIE SHOPPING CENTER
SECTION 22, TOWNSHIP 36S, RANGE 40E
ST. LUCIE COUNTY, FLORIDA
LOCATION MAP
VICINITY MAP
El
ENGINEERING DESIGN
S CONSTRUCTION, INC.
D
19mNCIff wuu
Ff. PI CE,m N95o
Cch.n,.
M452-x455
imcTlx<at-za54
Project
Locnllon 'a
3,
yCi
INDEX OF SHEETS
1. COVER
2. DEMOLITION PLAN
3HORIZONTAL CONTROL AND STRIPING PLAN
.Z PAVING, GRADING, & DRAINAGE PLAN
5. UTILITY PLAN
5. PAVING, GRADING, & DRAINAGE DETAILS
7. STORMWATER POLLUTION PREVENTION PLAN
8. STORMWATER POLLUTION PREVENTION DETAILS
9. SPECIFICATIONS
,r— xovo•.."r
N
O
m
0 � GOi
�P �Ii1ij
� i illst°
t z� gill ° d
�l
g6pp9'. g
L.
I
gg'(
U.S. HIGHWAY NO. 1
PORT SAINT LUCIE
E ENGINEERING DESIGN
SHOPPING CENTER-s,�.,.,
D
18 CONSTRUCTION, INC.
fB.TUCKER COURT
FT. PIERCE, FL ]1IIEC
UTILITY PLAN
m
"•"
C
DKore: 7,2i"4,6E
taa: nx<uau�
t!T. LUCIE
EX. Ix
8 P
T
0
tl
a
PORT SAINT LUCIE
SHOPPING CENTER
PAVING, GRADING &
DRAINAGE DETAILS
xx
H
iP
0i
5!a�
6
A2
a
cA
E ENGINEERING DESIGN
& CONSTRUCTION, INC.
D FT. .PIERFL &961
C f n2463 xe6e 55
E1f2pgec011E3`dg8�{PSLSIIv�p»amhutlml +"+:Bs1123i8 En9in"-M,Cry, IMPPP. 1=1016&QA M. Jenia, EF In
zl//
/ Pr
! l
--191
_-- - - --._._ -.so— —
1 pry����1i I
I �f/'� J � n FrwN '�' �,s�F FE•�2�
ltI
r I I+ II
h
J J .III
L
w _
I ��� }� to �k � `�� •G
y
TIP
.` 71c'-
I 13I,
r1 I
I � I
I
P
\\111111 / r' `\ Illy
71
r ; ENGINEERING DESIGN
i PORT SAINT LUCIE EI
g� SHOPPING CENTER _ . IgmCONSTRUCTION, COURTINC.
D 1951IDCKERCOYRT
[ FT. PIERCE. FL U959
STORMWATER POLLUTION o .... ph..M62245
CF ru:"2sazaau
//11111111 PREVENTION PLAN
°T ST. LUCIE COYNTY FLOPIOR T ��'
§
Ln
�
�
�
) <00
§!;MOT
!.
; §;.A
; !§_
\�
; rir
. ,, ; \\
� z §o ;5 ;
°9, m!
§( !ob§
ƒ\SHOPPING CENTER
POLLUTION%$STORMINATER <PREVENTION
4
]
#
JI-a
»
(
e I ,,|
§ | 111
®|)
_
\
—EDESIGN D/!§,.
��cpho \2�2-2455
_
6i06
-------------
A 1! 11 111