Loading...
HomeMy WebLinkAboutSCOPE OF WORKSCANNED STRUCTURAL BY St. Lucie County 1. Full kitchen demo. 2. Cut down and frame a 6" soffit from concrete ceiling (material provided by,GC) 3. Reinstall grate in same location after soffit built. CABINETS ST. LUCIE C01JN1Y PIJIII3NG DPlISION REVIEWED FOR COIYB'LIANCE REVIEWED ,Y 21, 1. Install cabinets per layout. DATE 2. Install cabinet hardware. PLANS AND PER 1IT MUST BE KEPT ON JOB OR NO INSPECTION WILL BE DIADE. COUNTER 1. Counter template and install by third party installer (Boynton Beach Marble 561-588-3600). APPLIANCES 1. Install range, dishwasher, refrigerator, and OTR (already on site). CONCEALED FASTENERS OR ATTACHMENTS ARETHEAESPONSIBILIflOF1HE 2. Install hammer arrestors on refrigerator and dishwasher. CONTRACTOR OF RECORD FLOORING N/A FINISH PLUMBING THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT 1. Reuse faucet. MAY BE NECESSARY IN ORDER TO 2. Reuse disposal. COMPLY WITH ALL APPLICABLE CODE6. ROUGH PLUMBING 1. Reroute water line to the refrigerator. 2. New valves and drain work for kitchen sink. FINISH ELECTRIC 1. Install four switches according to layout ROUGH ELECTRIC 1. Install (4) 4" recessed LED lights on dimmerswitch. 2. Update all electrical outlets. 3. Eliminate electrical where walls being removed PAINT Schodulo ! g�qt y,Pdt,{r� 8(1�PARSONS 1. All drywall patching on ceiling and walls. 2. Paint ceiling with flat finish paint. 3. Paint trim with semi -gloss finish paint. 4. Prime walls to paint ready with satin finish paint, MILLWORK 1. All trim work to tie into cabinetry. Schedule ! Scope of Work: RON PARSONS Fl1e Covv