HomeMy WebLinkAboutSCOPE OF WORKScope of Work @ Kitchen
Scope of Work @ Master Bath Flle Copy
**Lower Sink Wall (Pass Thru) RECE11'°0 SfeP 15 Z017 **Remove Existing Shower to Enlarge Closet
**Install Recess Lighting, **Convert Existing Tub to Shower
**Relocate any Switches or Outlets (if necessary) **Relocate any Switches or Outlets (if necessary)
**Repair any drywall disturbed in renovation **Repair any drywall disturbed in renovation
** **PI b N Sh V 1
**Install New Cabinetry & Counter Tops # T�_Q r~ um ew ower a ve
Plumb Kitchen Sink & Faucet ST. Li C_ C tTN _ RIJSLDI .0 DW1S1ON **Plumb New Toilet
REVIEWED FOR §jONIPLLANCE **Install New Cabinetry
1tEirlE1,YE W" MU't M11-oyou**Plumb New Vanity Sinks & Faucets
llhTE
PL N! k:\D PER'1IIT BUST BE KEPT ON JOB
r.q �Vn \JILT. EE,
V 3630
; L
BR2784POS I V071224
Kitchen
DISH406
TF64B16 W401642HR TFS4616
=Tc — TCRde=
OI Shower
Area
11b x °��
Old Tub
Area �,
lf'�o�mt I i
Master Bath
THESE PLANS AND ALL PROPOSED WOII
ARE SUBJECT TO ANY CORRECTIONS
Scope of. Work @ Other Areas REQUIRED BY nELD INSPECTORS THAT
JAAY BE NECI SSARYiN ORDER TO
**Remove Existing Flooring '✓.01;1PLY-KITH ALL kd�'�.Iudu CODES.
**Install New Vinyl Flooring (Thru-Out)-
**Install New Baseboard
**Repair any drywall disturbed in renovation Note: This drawing is an artistic
interpretation of the general
appearance of the design. It is
not meant to be an exact rendition.
Closet
;ONGEA.LED FAST ENERS OR ATTACHMENTS
ARE THE RESPONSIBILITY OF THE
CONTRACTOR OF RECORD
ama. m mum
1 :9/15/2017
9/15/2017
#: I
Ile Copy