Loading...
HomeMy WebLinkAboutCERTIFICATE OF COMPLIANCELINDA tJARTZ CHAIR DISTRICT 3 CATHY TOWNSEND VICE -CHAIR DISTRICT 5 CHRIS DZADOVSKY DISTRICT 1 SEAN MITCHELL DISTRICT 2 FRANNIE HUTCHINSON DISTRICT 4 HOWARD N. TIPTON COUNTY ADMINISTRATOR DAN MCINTYRE COUNTY ATTORNEY MAILING ADDRESS 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982 PHONE (772) 462-1707 TDD (772) 462-1428 FAX (772) 462-2362 E-MAIL DAYAN P@STLUCIECO.ORG WEBSITE WWW.STLUCIECO.GOV 2980S. 251 Street SCANNED Ft. Pierce, FL 34981 BY St. Lucie County Attention: Mr. Stefan K. Matthes, P.E. Subject: Sedona Phase 1 Ref: Stormwater Permit #17-02 CERTIFICATE OF COMPLETION Portion of Phase 1 For BLDG #13, 14, 15, 16, 18, 19, 20, 21 Clubhouse This Certificate of Completion is issued pursuant to St. Lucie County Codes and attests only that the construction shown on the approved plans or revisions for a portion of Phase 1 (as shown on the attached exhibit A) are complete and in substantial conformance to such approved plans and specifications. This certificate does not confer, or imply approval of any other aspect of the project and is offered in conjunction with the Engineer of Record certification dated September 12, 2019. The Public Works Department has obtained other appropriate County Departments/Divisions acceptance as required for this Certificate. Warranty and Guaranty contract(s) and associated bond(s) are listed below: N/A Patrick Dayan, P.E., Pater Quality Division Manager w/att cc: Daniel McIntyre, County Attorney Leslie Olson, AICP, PDS Director Gary Stepalavich, MCP, CFM, Building Codes Administrator David A. Hays, P.E., CFM Rob Krip Gregg Wexler, Edwards Landing, LLC x CULPEPPER & TERPENING, INC. CONSULTING ENGINEERS i LANDSURVEYORS CRT Project No.:15-057 File: SLC ENC Sender's Email: mia-tlltes n ct-c g.com September 12, 2019 VIA: Hand Delivery Mr. David Hays, P.E., CFM Senior Project Engineer St. Lucie County Water Quality Division St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 RE: Sedona PUD — Phase 1 Construction St. Lucie County Stormwater Permit No. 17-02 Engineer's Partial Certification — Southern Portion of Project Dear Mr. Hays: This is to certify that the required infrastructure improvements for the southern portion of the Sedona PUD Phase 1 project have been completed in substantial conformance with the approved construction plans and specifications. The completed portion includes the entire stormwater system, detention pond and outfall, and paving and drainage infrastructure associated with Buildings 13, 14, 15, 16, 18, 19 and 20. The only nunor deviation for the partial certification areas follows: • Minor changes in final grade, and invert elevations for the project These deviation does not affect the paving and drainage improvements of the site which are completed in substantial accordance with the approved Construction Plans. As always, should you have any questions, please do not hesitate to contact me at (772)464-3537 or via the Email address referenced above. ttttl IIII//," Si``rhielv,6i6 RL MqA//i/i �� gyp'.•' tGENS • , A i jtY PEI�PER & TE-4 IING, INC. 3t17 3 N Seryt t e- � ide � �•, Flor�cAa)FIAN,j }I 1� 38723 Cc: Gregg R. Wexler RECEIVED SEP 13 2019 ENGINEERING DIVISION A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET I FT. PIERCE. FL 3.1981 1 (772) 464-3537 i FAX: (772) 464-9497