Loading...
HomeMy WebLinkAboutREVISION/ n wuuaern Arcmtect rA Permit 4454 Swilcan.Bridge Lane, N. `• tel (904) 329-'2510 Jadcsonville,.Flodda • fax (964)379-4978 Revision 32224,. license. AA-0603433 _ •`robert@wulbem.net DATE: January 12, 2019 To: PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 Virginia Avenue Ft- Pierce, FL 34982 e: BU WGERI KING 29752 ��QlTjjkYfofj PORT ST'. LUCIE 6598 S. U.S. Highway 1 Port Saint Lucie, Florida 34952 From: Robert C. Wulbem, RA SCANNED Proj. No: 1667.07 BY Permit No.: 1712-0227 St. Lu ie County The Roofing Underlayment installed as follows at the Standing Seam Metal Roofing locations is acceptable Item No. 1: Roofing Underlayment attachment at the Standing Seam Metal Roofing locations: 1. Attached to the plywood roof sheathing with two staggered rows in the field of the sheet with a maximum fastener spacing of 12" o.c. and one row at the end and side laps fastened 6" o.c.. 2. Underlayment attached using plastic cap nails with a nominal cap diameter of not less than 1 ". The minimum thickness of the outside edge of plastic caps is 0.035 inch. The cap nail shank is 0.083 inch min. for ring shank cap nails and 0.091 inch min. for smooth shank cap nails. The cap nail shank length of 1" is sufficient to penetrate through the roof sheathing and not less than 314 inch into the roof sheathing. This information is being submitted for review and consideration. Regards, (14� Digitally signediby 0 Fit) RobertC Wulbem -�Robert@Wulbem.ri Wulbern Arct'466t PA", t- F`.f 3433 bMRobert C. Wulber _ 'ni• �`.LQ•tr" STRED•ARGt�` b6@44 Info:- Rdbei@Wulbern:net Dete:2019.01A6" . a .. R..Wulbern Architect k 4454 Swilcan Bridge Lane, N. a tel (404) 329-2510- Jadcsonville,. Florida • fax (904) 3794978 32224 • license AA-0003433 •°robert@wulbem.net DATE: September 14, 2018 To: PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 Virginia Avenue Ft. Pierce, FL 34982 From: Robert C. Wulbem, RA Permit No.: 1712-0221 WWI=ai Revision N.E. Corner Kitterman Road St. Lucie County, Florida 34952 Proj. No: 1667.07 The following revisions have been made to the Permit Documents approved by the St. Lucie County Building Department. These revisions have been clouded and are being submitted for review and consideration. • Sheet EQ-1 (Equipment Plan): Updated plan to reflect Owner requested floor plan changes to the Drive- Thru Beverage area. • Sheet A-1 (Floor Plan): Updated plan to reflect Owner requested floor plan changes to the Drive-Thru Beverage area. • Sheet A-1.2 (Product Review Affidavit): Clarified Tie Down Fastening on Product Approval Affidavit per Building Plan Review comments. • Sheet A-1.3d (Monument Sign): Updated Monument Sign design per Building Plan Review comments. • Sheets A-1.4a & A-1.4b (Trellis Details): Added Trellis Details to package. • Sheet A-1.5 (Trash Enclosure): Added Trash Enclosure Plans and Details to package per Building Plan Review comments. • Sheet A-13b (Door & Window Fasteners): Added Door & Window Tie Down Fastening information per Building Plan Review comments. • Sheet S-1 (Foundation Plan): Updated Foundation Plan to remove Walk -in -Box slab recess. • Sheet S-2 (Roof Framing): Clarified Framing Return at Archon Towers. • Sheet S-5 (Sections): Updated Foundation Sections to remove Walk -in -Box slab recess. • Sheet S-6 (Sections: Clarified Framing Return at Archon Towers. • Sheet S-10 (Typical Details): Clarified Framing Return at Archon Towers. • Sheets P1A and P2-1 (Plumbing Drawings): Updated drawings to reflect Owner requested floor plan changes to the Drive-Thru Beverage area. • Sheet P1-1 (Plumbing Plan): Added information regarding the size of the Grease Interceptor per Building Plan Review comments. • Sheets EO-1 and EO-2 (Electrical Site Plans): Updated plans based on Permit Comments from Planning & Zoning. • Sheets E1-1, Ei-2, E2-1, E3-1 and E5-2 (Electrical Drawings): Updated drawings to reflect Owner requested floor plan changes to the Drive-Thru Beverage area. Sheet E1-2 (Power Plan): Added rough -in information for future Ordering Kiosks. • Sheet E3-1 (Technology Plan): Added rough -in information for future Ordering Kiosks.