RE: Report of Soil Exploration
Wheel Chair Ramp
5350 Street Blvd., Fort Pierce, Florida
GFA Project No. 18-9377.00 — Rev #1
Dear Ms. Sharp:
RECENED
OCT T 5 2010
Permitting Department
St. Lucie county
rvr+
October 11, 2018
GFA International, Inc. (GFA) performed an auger boring with hand cone penetrometer testing at the
above referenced project site. The boring location is illustrated on the attached Test Location Plan.
The subsurface exploration activities were performed in accordance with Chapter 18 of the 2017
Florida Building Code, Sixth Edition and applicable ASTM standards. Detailed information for the
subsurface conditions encountered in the boring is contained on the attached boring log.
Based on the test results, the soils upon which the referenced structure will be constructed are
capable of providing a maximum allowable bearing capacity of 2,500 psf subject to the limitations
noted herein. We recommend that the footings bear at a depth of at least 12 inches below finish
grade. The depth should be measured from the lowest adjacent grade. We also recommend a
minimum footing width of 18 inches for spread footings and 16 inches for monolithic footings, but not
less than 8 inches more than the width of the imposed wall.
This report does not state or imply that the foundation soils at the bearing level will remain in the
original condition in which they were found during the subsurface exploration activities. Exposure to
the environment may weaken the foundation soils at the bearing level if the foundation excavations
remain open for an extended period, or if the foundation soils are exposed to rainfall. Consequently, it
is recommended that the excavations for the wall and column footings be performed to final grade and
footings be constructed as soon as possible to reduce the potential for deterioration of the bearing
soils.
GFA estimates that that the site is near or at design grade. The 2 feet of soils below existing grade,
below the bottom of all new footing excavations and slabs, and all fill material should be compacted to
at least 95 percent of the modified Proctor (ASTM D 1557) maximum dry density prior to placement
of concrete for the footings.
Note that differential settlement between the existing building and the proposed ramp is anticipated.
Therefore, construction joints between the existing and new structures should be considered if the
ramp will be attached to the existing building.
During site preparation, foundations and the below grade remains of any structures that are within the
footprint of the new construction should be removed. Similarly, existing utility lines should be
removed or properly abandoned so that they will not adversely impact new overlying structures.
607 NW Commodity Cove • Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax) • www.teamgfa.com
OFFICES THROUGHOUT FLORIDA
Wheel Chair Ramp
5350 Street Blvd., Fort Pierce, Florida
GFA Project No. 18-9377.00 -Rev #1
October 11, 2018
Page 2
GFA should be provided the opportunity to review the final foundation design plans and specifications
to determine whether GFA's recommendations have been properly interpreted, communicated, and
implemented. If GFA is not afforded the opportunity to participate in construction related aspects of
foundation installation as recommended in this report or any report addendum, GFA cannot accept
responsibility for the interpretation of our recommendations made in this report or in a report
addendum for foundation performance.
We appreciate the opportunity to be of service to you on this project and look forward to a continued
association. Please contact the undersigned if you have any questions or comments, or if we may
further assist you as your plans proceed.
Respectful] %ltt,;dtI
GFA IlyZt3 INC.
Florio a'.l)ja?orization No. 4930
OCENSF'•.•
�Oi ST OF
John j� p<�RiDP.•�G� jt7.11-143
�� Craig Van Collie, E.I.
Senior" "FfLk.��g��i`,aM1` Project Manager
Florida Re- ibRIMU6A o. 63218
Attachments: Test Location Plan
Auger Boring Log
Notes Related to Boring Records
Distribution: Ms. Laura Sharp - Skidoo LLC
1 pdf
C�'
IN
;opt.
.`S n-c4r s `BFvd�
300 ft
GFA Intemational
PROJECT NUMBER 18-9377.00
DATE STARTED 9/26/18 COMPLETED 9/26/18.
DRILLING CONTRACTOR GFAlntemationallnc.
DRILLING METHOD Auger Boring - LOGGED BY CHECKED BY CVC
NOTES
BORING NUMBER AB-1
PAGE 1 OF 1
PROJECT NAME WheelChairRamp
PROJECT LOCATION 5350 Steel Blvd. Fort Pieroe
LATITUDE 27.49116 LONGITUDE-80.3808.6
GROUND WATER LEVELS:
ATTIMEOFDRIWNG —
AT END OF —
AFTER DRILLING —
w
w
UE"
0.0.
W�
wm
a s a
0.0
MATERIAL DESCRIPTION.
O
a0
Z
c.mL)
=av_O
Q
gl
80
80
80
Dark
80
80
80
NOTES RELATED TO BORING RECORDS AND
GENERALIZED SUBSURFACE PROFILES
1. Groundwater levels (if encountered) were recorded either during or following the boring completion on
the date indicated. Fluctuations in groundwater levels are common - see the report text for a discussion.
2. The boring locations were identified in the field by estimated distances and offsets from existing reference
marks and/or other site landmarks.
3. The completed boreholes were backfilled to adjacent site grade using drilling spoils and patched with
asphalt cold mix in pavement areas.
4. The Log of Boring records represent our interpretation of soil conditions based on visual classification of
the soil samples recovered from the borings.
5. The Log of Boring records are subject to the limitations, conclusions, and recommendations presented in
the report text.
6. The StandardPenetrationTest (SPT) N-values contained on the Log of Boring records refer to the total
blow counts of a 140-pound drop hammer falling 30 inches required to drive a split -barrel sampler a total
distance of 12 inches into soil strata at speck depth intervals.
7. The Hand Cone Penetrometer (HCP) values contained on Log. of Boring records and the Cone
Penetration Test (CPT) values contained on the Cone Penetration Sounding logs refer to the cone tip
resistance recorded when pushing the cone tip into the soil strata at specific depth intervals.
8. The soil and/or rock strata interfaces shown on the Log of Boring records are approximate and may vary
from those shown on the logs. The soil and/or rock descriptions shown on the Log of Boring records refer
to conditions at the speck location tested. Soil/rock conditions may vary between test locations.
9. Relative density for coarse -grained soils.(sands/gravels) and consistency for fine-grained soils (silts/clays)
are described as follows:
Coarse Grained Soils (Sands and Gravels)
Fine Grained Soils (Silts and Clays)
HCP Value
(kg/cm) ..
CPT Value
(tsf)
Relative
Density
SPT
N-Value
HCP Value
(kg/cmz)
CPT Value
(tsf)
Consistency
- 6
-2
Very Loose -
0-2
-3
Soft
17-36
21-40
Loose
3-4
21-35-
4-6
Soft
L3150
37-116
41-120
Med. Dense
5-8
>35
7-12
Firm
117-196
121-200
Dense
9-15
-
13-25
Stiff
> 196
>200
Very Dense
16-30
26-50
Very Stiff
>30
>50
Hard
10. Grain size descriptions areas follows:
Description - _
Particle Size Limits
Boulder
Greater than 12 inches
Cobble
3 to 12 inches -
Coarse Gravel
/4 to 3 inches -
Fine Gravel
No. 4 sieve to 3/4 inch
Coarse Sand
No. 10 to No. 4 sieve
Medium Sand
No. 40 to No. 10 sieve
Fine Sand
No. 200 to No. 40 sieve
Fines(Silt/Clay)
Smaller than No. 200 sieve
11. Definitions for modifiers used in soil/rock descriptions:
Proportion
Modifier
Approximate Root Diameter
Modifier
<5%
Trace
Less than /3z"
Fine roots
5% to 12% . _
Little
V3i' to �1, - -
Small roots
12% to 30%
Some
1 1/4- to 1"
Medium roots.
30% to 50%
And
I Greater than 1"
Large roots
Organic Soils; Soils containing vegetative tissue in various stages of decomposition having a fibrous to amorphous
texture. Usually having a dark brown to black color and an organic odor.
Organic Content Modifiers: <25%: Slightly to Highly Organic; 25% to 75%: Muck; >75%: Peat _
GfH