51
s EAVE TO PURLIN CONN MON DETAIL a SAVE OVERHANG DETAIL
si s
I EXISfIe- N� Nq ROOF
51
�rM
ma`�%wm.o��wnmam.rwm mxunrmw,an,v
u .1
iz1 PARTIAL ROOF PLAN
51 R.,'J
OP
P.
"]MID
GP0GL.1M1R. RfT
%AV. RCOf PVH INO
ocRens
9Qf N�[I
Empirical Design, LLC.
149 Oakview Circle, Lake Mary, FL32746
M���' Phone: mpirica:787i
`�. mailfalemnincal-desrgn,on
uc
Mr. John Antolic April 11, 2018
Simon Roofing
70 Karago Avenue
Youngstown, OH 44512
Email: jantolic@simonroofing.com
Subject Property: Flowers Bakery, 6599 Kitterman Road, Ft.,Pierce, FL34982
Dear Mr. Antolic:
Background:
The contract drawings dated 02i01/I018, attached for reference, included a detail which specified tack welding a
2"x6"x W plate to the top and bottom of the inside of the new eave strut in order to reinforce,the connection
to the existing roof purlin, see snip of detail below. In lieu of making the connection to the top and bottom
flanges, during construction bracket plate was used to connect the new eave strut to the existing purlin at the
midpoint. The connection to the mid -point relieves the stress concerns of making the connection to the top and
bottom (which are the points of maximum stress). The constructed detail, is sufficient to resist the applied loads
and.removes any required welding from the, project.
,SP0. AT 3' O.0 AD
PLATETOOF
PUTE TO INSIDE OF NEW
INSIDE
Ex. ADJACENT ROOF EAVE STRUT, TOP AND
PURU ROTT,
p.:x..na.ma"vn
Ew EAVE STRUT
MODIFY STRUT FLANGES
AS REO'D TO F6 EX.
PURUN,. TTP
EAVE TO PURLIN CONNECTION DETAIL
:�P unoM
Connection as Detailed in Plans Connection as Constructed
Please let us know if you have any questions or require additional assistance.
Sincerely,
Brenton Daily, P.E. _
Florida Professional Engineer License No. 81028, Expiration Date:OZM019