Loading...
HomeMy WebLinkAboutPLANS 1n EAVE 0VVERHANG DETAIL 51 s EAVE TO PURLIN CONN MON DETAIL a SAVE OVERHANG DETAIL si s I EXISfIe- N� Nq ROOF 51 �rM ma`�%wm.o��wnmam.rwm mxunrmw,an,v u .1 iz1 PARTIAL ROOF PLAN 51 R.,'J OP P. "]MID GP0GL.1M1R. RfT %AV. RCOf PVH INO ocRens 9Qf N�[I Empirical Design, LLC. 149 Oakview Circle, Lake Mary, FL32746 M���' Phone: mpirica:787i `�. mailfalemnincal-desrgn,on uc Mr. John Antolic April 11, 2018 Simon Roofing 70 Karago Avenue Youngstown, OH 44512 Email: jantolic@simonroofing.com Subject Property: Flowers Bakery, 6599 Kitterman Road, Ft.,Pierce, FL34982 Dear Mr. Antolic: Background: The contract drawings dated 02i01/I018, attached for reference, included a detail which specified tack welding a 2"x6"x W plate to the top and bottom of the inside of the new eave strut in order to reinforce,the connection to the existing roof purlin, see snip of detail below. In lieu of making the connection to the top and bottom flanges, during construction bracket plate was used to connect the new eave strut to the existing purlin at the midpoint. The connection to the mid -point relieves the stress concerns of making the connection to the top and bottom (which are the points of maximum stress). The constructed detail, is sufficient to resist the applied loads and.removes any required welding from the, project. ,SP0. AT 3' O.0 AD PLATETOOF PUTE TO INSIDE OF NEW INSIDE Ex. ADJACENT ROOF EAVE STRUT, TOP AND PURU ROTT, p.:x..na.ma"vn Ew EAVE STRUT MODIFY STRUT FLANGES AS REO'D TO F6 EX. PURUN,. TTP EAVE TO PURLIN CONNECTION DETAIL :�P unoM Connection as Detailed in Plans Connection as Constructed Please let us know if you have any questions or require additional assistance. Sincerely, Brenton Daily, P.E. _ Florida Professional Engineer License No. 81028, Expiration Date:OZM019