Report No. 3
Scott Deal, M13G
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
CONSTRUCTION OBSERVATION REPORT
MAVERICK BOAT GROUP
4551 ST LUCIE BLVD. FORT PIERCE, FLORIDA 34946
SLC BUILDING PERMIT NO 1801-0678
PROJECT NAME:
Maverick Boat Group
DATE:
June 26, 2018
CLIENT:
Maverick Boat Group
LOCATION:
Vero Beach, Florida
CONTRACTOR:
R F Concrete
PROJECT MGR:
Jeremy Foulks
INSPECTED BY: Mike Lue WEATHER: Sunny, +/- 90 degrees
Partial inspection of the pre-engineered metal building framing.
KSM has completed the testing of the bolt tensioning and welds. A report will be submitted when final.
Kirby Building Systems provided an optional welded connection detail of the channel to the rigid columns or bolts.
(See attached)
OBSERVATIONS:
• All metal building components are in place, which include the rigid frames, roof purlins, wall girts, flange
braces and diagonal roof bracing and metal panel connections.
• All column anchor bolts were found to have nuts and washers in place, and the loose nut at column G34 was
corrected.
• The connections of the channel to the top of the masonry walls were partially corrected.
• The majority of channel girts have been welded to the steel columns. There are some connections that were
bolted where the bolt holes are aligned.
• There are some channel to column connections not completed and remains to be addressed.
Col J23, one side bolt not in channel or welded.
Col GI, G35, JI8 & J24 no bolts in the channel to channel connections at corners.
• Channel girls to doorjambs at OH doors not connected.
• The number of crane rails and lengths have been reduced from the permitted documents as directed by Owner.
RECOMMENDATIONS:
• Contractor to recheck and correct the channel connections to the top of the masonry walls and rigid frames.
• Re -inspect when completed.
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www mlengineerinoinc com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 3
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Pic 1
Col J23
One end of channel is welded and the other is bolted.
Bolt is not in the channel only in column flange.
Provide weld connection at both sides.
Pic 2
View looking down on top of channels at building
comer.
There are no bolts connecting the ends of the channels.
Pic 3
Channel girls to ORD jambs to be connected, similar to
all other wall girts.
Page 2 of 2
FIELD FIX FOR WIND CHANNEL SUPPORTING MASONRY WALL NOT BEING BOLTED TO COLUMNS.
NOTES:
1. (2) WELDS ARE REQUIRED AT EACH CHANNEL TO COLUMN CONNECTION AT SHOWN IN THE DETAILS BELOW.
2" OF HORIZONTAL WELD ACROSS TOP OF CHANNEL FLANGE
2" OF VERTICAL WELD DOWN THE SIDE OF CHANNEL FLANGE
2. ALL WELDS MUST BE PERFORMED BY AN AWS CERTIFIED WELDER USING MINIMUM E70XX ELECTRODES.
TYPICAL F AT TOP OF CNANNNL PLAN06
TYPICAL WBLO OONN TM
6I08 OF CNANNSL PL =
T• W W
t mlI
_WINO CNANNBL BITTING
ON NABOMY WALL
SECTION A -A
MAVERICK BOAT GROUP
FORT PIERCE, FL
KIRBY BUILDING SYSTEMS 17BOI75A
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue SCANNED
Vero Beach, Florida 32960
Phone: (772) 569-1257 BY
Fax: (772) 569-4041 St. Lucie Countv
www. mlengineerin ginc.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 2
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
CONSTRUCTION OBSERVATION REPORT
MAVERICK BOAT GROUP
4551 ST LUCIE BLVD. FORT PIERCE, FLORIDA 34946
SLC BUILDING PERMIT NO 1801-0678
PROJECT NAME: Maverick Boat Group DATE: May 30, 2018
CLIENT: Maverick Boat Group LOCATION: Vero Beach, Florida
CONTRACTOR: R F Concrete PROJECT MGR: Jeremy Foulks
INSPECTED BY: Mike Lue WEATHER: Overcast , rain
Partial inspection of the pre-engineered metal building framing .
Column grid lines G&J from 1-35
This area was inspected first because the interior framing is in process and when completed will conceal much of the
metal building components.
KSM was on site in the process of verifying the bolt tensions at the rigid frame connections.
OBSERVATIONS:
• All metal building components at this area are in place, which include but are not limited to the rigid frames,
roof purlins, wall girts, flange braces and diagonal roof bracing.
• The fire rated metal stud wall above the masonry wall up to the underside of the metal roof deck is in place
along line G from lines 18 to 24.
All column anchor bolts were found to have nuts and washers in place, with the exception of Column G34
which had a loose nut at one of the anchor bolts.
Some loose bolts were found at the channel girt to the top of the masonry walls.
The steel channel girts at the top of the masonry walls are not bolted to the columns.
RECOMMENDATIONS:
• Contractor to recheck and correct the channel connections to the top of the masonry walls and rigid frames.
Tighten the loose nut at the anchor bolt at column G34.
Re -inspect when completed.
,t'2121e1jo.ry
�` NSHONy '•..
o?L
Page 1 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlen2ineeringine.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 2
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Pic I
View looking west from column line 25 between column
lines G & J.
View looking west from column line 23 between column
lines G & J.
Page 2 of 3
. . ,
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlengincerin.gine.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 2
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Page 3 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlenginecringinc.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 4
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
CONSTRUCTION OBSERVATION REPORT
MAVERICK BOAT GROUP
4551 ST LUCIE BLVD. FORT PIERCE, FLORIDA 34946
SLC BUILDING PERMIT NO 1801-0678
PROJECT NAME:
Maverick Boat Group
DATE:
July 17, 2018
CLIENT:
Maverick Boat Group
LOCATION:
Vero Beach, Florida
CONTRACTOR:
R F Concrete
PROJECT MGR:
Jeremy Foulks
INSPECTED BY:
Mike Lue
WEAT14ER:
Sunny, +/- 95 degrees
pre-engineered
KSM has completed the testing of the bolt tensioning, inspection of welds and other connections. See attached certified
report dated July 12, 2018
OBSERVATIONS:
• All metal building components are in place, which include the rigid frames, roof purlins, wall girts, flange
braces and diagonal roof and wall bracing and metal panel connections.
• All column anchor bolts, nuts and washers are in place.
• The channel connections at the top of the masonry walls to the rigid frames, door jambs and at comers have
been corrected.
Roof and Wall Sheathing
• The standing seam roof panels have been installed as indicated per the NOA with clips at each purlin.
• The wall panels have been installed with self drilling screws to the wall girls and framing as indicated on sheet
D4 of 5 of the Kirby Metal Building plans
Doors and windows
• All OHD, swing doors and windows have been installed as per the permit documents
Based our observations and the certification from KSM Engineering and testing, it's our opinion the structural
components of the pre-engineered building have been installed in substantial accordance with the design and permitted
documents.
Encl. KSM Certification dated July 12, 2018
Page 1 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlenginecringinc.com
Project No.17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 4
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Pic 1
Typical C8 channel to channel bolted connection at
comers with masonry walls.
Pic 2
View looking down on top of a channel clip connection
to steel overhead doorjamb.
Clips were welded to doorjamb and screwed to channel
Page 2 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37" Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineerin ginc.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 4
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Pic 4
Smaller OHD steel jamb assemblies were screwed to the
steel jambs and are acceptable
Pic 5
Roof Panel Attachment
Standing seam metal roof clips at each purlin as plan
Pic 6
Wall Sheathing Attachment
Wall panels were screwed to purlins as indicated on
sheet
Page 3 of 3
111�iYi
K'ELLER,.SCHLEICHERA MacWILLIAM ENGINEERING AND TESTING, INC-.
MARTIN (772) 337-7755 p O. BOX 78-1377 SEBASTIAN- FL 32978-1377 SEBASTIAN (772) 589-a712
PALM BEACH (561) 845-7445 ' ' MELBouF NE (321) 768-8488
FAX '(Sr1) 645-8876 www.ksmengineedng:net ST. LUGIE,(772) 228.9 A
E-Mail: KSM®KSMENGINEERING.NET
CA: 5693 FAX:(772) 589-6469
July 12, 2018
RF Concrete Construction, Inc. j
P. O. Box 650789
Vero Beach, FL 32965
Re: Maverick Boat
131,000 SF Steel Building
4561 St. Lucie Boulevard
Ft. Pierce, Florida
Permit #: 1801-0678
KSM #: 162366-11 insp
Dear Sir:
As requested, we have re -inspected the primary structural steel bolted
connections, that were found to be loose and the block wall top plate which was
not attached to the steel columns during our May 23, 30 and 31,12018
inspections at the referenced project. We also inspected the monorail support
bracket attachment to the steel frame of the building for the proposed monorail
beam (by others).
Based on our June 21, and July 12, 2018 inspections, this letter shall serve as
confirmation that the primary structural steel bolted and welded connections,
steel framing and wind bracing was installed in accordance to the structural
drawings excluding the monorail beam .
If you have any questions, please feel free to contact the office.
Ronald G. Keller, P.E.:,37293 /.SI Lic, Nosh 860 / Julie E. Keller. P.E.: 68366
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringine.com
Project No. 17-122 Report No. 4
Client:
Scott Deal, MBG
Jim Leffew, MBG
Architect:
John Brenner, Brenner & Assoc.
Contractor:
Jeremy Foulks, BF Concrete
SLC Bldg Dept
Mr. Joe Cicio, SLC Bldg. Dept.
File
File
CONSTRUCTION OBSERVATION REPORT
MAVERICK BOAT GROUP
4551 ST LUCIE BLVD. FORT PIERCE, FLORIDA 34946
SLC BUILDING PERMIT NO 1801-0678
PROJECT NAME: Maverick Boat Group
CLIENT: Maverick Boat Group
CONTRACTOR: R F Concrete
INSPECTED BY: Mike Lue
Final inspection of the pre-engineered metal building framing.
DATE:
LOCATION:
PROJECT MGR:
WEATHER:
July 17, 2018
Vero Beach, Florida
Jeremy Foulks
Sunnv. +/- 95 degree
KSM has completed the testing of the bolt tensioning, inspection of welds and other connections. See attached certified
report dated July 12, 2018
OBSERVATIONS:
• All metal building components are in place, which include the rigid frames, roof purlins, wall girts, flange
braces and diagonal roof and wall bracing and metal panel connections.
• All column anchor bolts, nuts and washers are in place.
• The channel connections at the top of the masonry walls to the rigid frames, doorjambs and at corners have
been corrected.
Roof and Wall Sheathing
• The standing seam roof panels have been installed as indicated per the NOA with clips at each purlin.
• The wall panels have been installed with self drilling screws to the wall girts and framing as indicated on sheet
D4 of 5 of the Kirby Metal Building plans
Doors and windows
• All OHD, swing doors and windows have been installed as per the permit documents
Based our observations and the certification from KSM Engineering and testing, it's our opinion the structural
components of the pre-engineered building have been installed in substantial accordance with the design and permitted
documents.
r�.•�•�•r,c
OR
Encl. KSM Certification dated July 12, 2018
I
JUL 19 2018
PerMittin•epa
I
Page 1 of 3
.,
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
w v.mleneineerineinc.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File
Report No. 4
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Typical CS channel to channel bolted connection at
corners with masonry walls.
View looking down on top of a channel clip connection
to steel overhead doorjamb.
Clips were welded to doorjamb and screwed to channel
Pic 3
The larger OHD steel anglejamb assemblies were plug
welded to the steel jambs and are acceptable
Page 2 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlemineeringinc.com
eineeringinc.com
Project No. 17-122
Client:
Architect:
Contractor:
SLC Bldg Dept
File .
Report No. 4
Scott Deal, MBG
Jim Leffew, MBG
John Brenner, Brenner & Assoc.
Jeremy Foulks, RF Concrete
Mr. Joe Cicio, SLC Bldg. Dept.
File
Pic 4
Smaller OHD steel jamb assemblies were screwed to the
steel jambs and are acceptable
Pic 5
Roof Panel Attachment
Standing seam metal roof clips at each purlin as plan
Pic 6
Wall Sheathing Attachment
Wall panels were screwed to purlins as indicated on
sheet
Page 3 of 3
. 1 l .. '
IWO
i11i.7jYi
KELLER, S.CH;LEICHER &, MacWILLIAM ENGINEERING. AND TESTING, INC:
MARTIN (772) 337:7755 RO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEeASTlM(772) 589-0712
PALM BEACH (561) 845-7445 wwwAsmengineering.net MELBOURNE (321) 768-8488
FAX (561) 845-8876 E-Mail:KSM®KSMENGINEERING.NET S . LUCIE (772) 229:9093
C.A.: 5693' FAX (772) 589-64.69
July 12, 2018
s
RF Concrete Construction, Inc.
P. O. Box 650789
Vero Beach, FL 32965
Re: Maverick Boat
131,000 SF Steel Building
4661 St. Lucie Boulevard
Ft. Pierce, Florida
Permit #: 1801-0678
KSM #: 162366-11insp
Dear Sir:
As requested, we have re -inspected the primary structural steel bolted
connections, that were found to be loose and the block wall top plate which was
not attached to the steel columns during our May 23, 30 and 31,> 2018
inspections at the referenced project. We also inspected the monorail support
bracket attachment to the steel frame of the building for the proposed monorail
beam (by others).
Based on our June 21, and July 12, 2018 inspections, this letter shall serve as
confirmation that the primary structural steel bolted and welded
steel framing and wind bracing was installed in accordance to
drawings excluding the monorail beam .
If you have any questions, please feel free to contact the office.
I
connections,
the structural
Ronald G. Keller, P.E..'31293 / SI Lic. No.: 860' / Julie.E.•Keller. P.E.:.68366