Loading...
HomeMy WebLinkAboutRESOLUTION 2017-112-FILE # 431,+204 JOR BC;'` 4 4003 PAGE 1419, Record' 06/02/2017 10:46:50 AM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 SCANNED RESOLUTION 2017-112 St. Lucie County File Number: MJSP 320175115 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF ST. LUCIE COUNTY GRANTING MAJOR SITE PLAN APPROVAL FOR MAVERICK BOAT COMPANY ON APPROXIMATELY 36.33 ACRES OF PROPERTY LOCATED IN ST. LUCIE COUNTY. WHEREAS, the Board of County Commissioners of St. Lucie County, Florida, based on the testimony and evidence, including but not limited to the staff report, has made the following determinations: 1. Maverick Boat Group, presented a petition for a Major Site Plan to be known as Maverick Boat Company for the construction of a 252,500 s.f. boat manufacturing facility to be constructed in four (4) phases in the IL (industrial, Light) zoning district on approximately 36.33 acres of land as described in Part A. 2. On May 16, 2017, this Board held a public meeting on the petition. 3. The St. Lucie County Development Review Committee has reviewed the Major Site Plan for the project and found it to meet all technical requirements and to be consistent with the Future Land Use Map of the St. Lucie County Comprehensive Plan, subject to the conditions set forth in Part B of this Resolution. 4. The proposed project is consistent with the general purpose, goals, objectives, and standards of the St. Lucie County Land Development Code, the St. Lucie County Comprehensive Plan and the Code of Ordinances of St. Lucie County. 5. The proposed project will not have an undue adverse effect on adjacent property, the character of the neighborhood, traffic conditions, parking, utility facilities or other matters affecting the public health, safety and general welfare. 6. All reasonable steps have been taken to minimize any adverse effect of the proposed project on the immediate vicinity through building design, site design, landscaping and screening. 7. The proposed project will be constructed, arranged and operated so as not to interfere with the development and use of neighboring property, in accordance with applicable district regulations. May 16, 2017 Page 1 Resolution No. 2017-112 File No.: MJSP 320175115 1 I NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of St. 2 Lucie County, Florida: 3 4 A. The property on which the Major Site Plan is being granted is described as follows: 5 6 THE NORTHWEST'/4, OF THE NORTHEAST % OF SECTION 31, TOWNSHIP 34 7 SOUTH, RANGE 40 EAST, LESS THE NORTH 98 FEET LYING IN ST. LUCIE 8 COUNTY, FLORIDA. 9 10 PARCEL IDENTIFICATION NUMBER: 1431-120-0000-000-6 11 12 B. Pursuant to Section 11.02.04 of the St. Lucie County Land Development Code, the 13 Major Site Plan for the project known as Maverick Boat Company is hereby 14 approved as shown on the site plan drawings for the project prepared by Knight, 15 McGuire and Associates, Inc. dated May 23, 2017 and date stamped received by 16 the St. Lucie County Planning & Development Services Department on May 23, 17 2017, subject to the following conditions:. 18 19 Planning and Development Services — Planning Division 20 21 1. Prior to a Certificate of Occupancy for Phase I development as depicted on the 22 site plan, the existing 30' x 60' building adjacent to the east property line shall be 23 removed from the property. 24 25 2. Prior to a Certificate of Occupancy for Phase If development as depicted on the 26 site plan, the applicant shall install the ingress turn lanes (an eastbound right -turn 27 lane and a westbound left -turn lane) within the right-of-way at the intersection of 28 St. Lucie Boulevard and Hammond Road and modify the east driveway to provide 29 exclusive left and right turn egress lanes in order to decrease the amount of 30 internal queuing during the peak hours. 31 32 3. All boat manufacturing activities shall occur within an enclosed structure. 33 34 Environmental Resources Department 35 36 1. Prior to the issuance a Vegetation Removal Permit or Exemption, a gopher 37 tortoise survey per Florida Fish and Wildlife Conservation Commission protocol, 38 shall be provided to the Environmental Resources Department. Should the 39 survey show impacts to gopher tortoises, a Florida Fish and Wildlife 40 Conservation Commission permit shall be required. 41 42 2. Prior to the issuance of a Vegetation Removal Permit associated with the 43 construction of phase one, a confirmation from the U.S. Fish and Wildlife Service 44 stating that a scrub -jay survey is not required [Comprehensive Plan Policy 45 6.1.12.5]. May 16, 2017 Resolution No. 2017-112 Page 2 File No.: MJSP 320175115 1 3. Prior to the issuance of a Building Permit, the landscape plan shall be revised to 2 provide a continuous hedge along St. Lucie Boulevard road frontage [Land 3 Development Code 7.09.04.A]. 4 5 4. Prior to issuance of a Certificate of Occupancy, all Category I listed invasive 6 species shall be eradicated from the site. 7 8 Public Works Department, Engineering Division 9 10 1. Prior to the issuance of a Building Permit for Phase One improvements as 11 depicted on the Site Plan, on -site construction (engineering) plans shall be 12 submitted to the Engineering Division for review and approval. 13 14 2. Prior to the issuance of a Building Permit for Phase Two improvements as 15 depicted on the Site Plan, off -site construction (engineering) plans shall be 16 submitted to the Engineering Division for review and approval. 17 18 C. The approvals and authorizations granted by this Resolution shall expire on May 16, 19 2019 unless a building permit is secured or a site plan extension is granted in 20 accordance with Section 11.02.06(B)(2), St. Lucie County Land Development Code. 21 22 D. The property owner, including any successors in interest, shall obtain all applicable 23 development permits and construction authorizations from the appropriate State and 24 Federal and local regulatory agencies including, but not limited to, the United States 25 Army Corps of Engineers, the Florida Department of Environmental Protection, 26 Florida Department of Transportation, South Florida Water Management District, 27 and the St. Lucie County Environmental Resources and Building Departments prior 28 to the commencement of any development activities on the property described in 29 Part A. Issuance of this permit by the County does not in any way create any rights 30 on the part of the developer to obtain a permit from a state or federal agency and 31 does not create any liability on the part of the County for issuance of this permit if 32 the developer fails to obtain requisite approvals or fulfill the obligations imposed by a 33 state or federal agency or undertake actions that may result in a violation of state or 34 federal law. 35 36 E. The conditions set forth in Part B are an integral non -severable part of the site plan 37 approval granted by this Resolution. If any condition set forth in Part B is 38 determined to be invalid or unenforceable for any reason and the developer declines 39 to comply voluntarily with that condition, the site plan approval granted by this 40 resolution shall become null and void. 41 42 F. A Certificate of Capacity, a copy of which is attached hereto as Exhibit B and made 43 a part hereof the Resolution, was granted by the Planning $ Development Services 44 Department Director on May 16, 2017. 45 May 16, 2017 Resolution No. 2017-112 Page 3 File No.: MJSP 320175115 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 G. A recorded copy of this Resolution shall be attached to the site plan drawings described in Part A, which plan shall be placed on file with the St. Lucie County Planning & Development Services Department Director. H. ADOPTION After motion and second, the vote on this resolution was as follows: Chairman Chris Dzadovsky AYE Vice -Chairman Tod Mowery AYE Commissioner Frannie Hutchinson AYE Commissioner Linda Bartz AYE Commissioner Cathy Townsend AYE PASSED AND DULY ADOPTED this 16th day of May, 2017. May 16, 2017 Page 4 BOARD OF COUNTY COMMISSIONERS ST. LUCIE COUNTY, FLORIDA APPROVED AS TO FORM AND CORRECTNESS: Resolution No. 2017-112 File No.: MJSP 320175115 E-1 10 11 12 13 14 15 16 17 18 19 20 EXHIBIT "A" LOCATION MAP Maverick Boat Group MJSP-320175115 (P Subject parcel + Igo. St Lucie Blvd L JuanitagveLr-� Angle.Rd C-25 Canal N FF May 16, 2017 Page 5 Resolution No. 2017-112 File No.: MJSP320175115 12 May 16, 2017 Page 6 EXHIBIT "B" CERTIFICATE OF CAPACITY Resolution No. 2017-112 File No.: MJSP 320175115 EXHIBIT ° g " St Lucie County Certificate of Capacity Date 5/24/2017 Certificate No. 2987 This document certifies that concurrency will be met and that adequate public facility capacity exists to maintain the standards for levels of service as adopted in the St Lucie County Comprehensive Plan for: 1. Type of development Major Site Plan Number of units 3 Number of square feet 252,500 2. Property legal description & Tax ID no. 1431-120-0000-000-6 4551 St. Lucie Boulevard Maverick Boat Company 3. Approval: Resolution No. 2017-112 4. Subject to the following conditions for concurrency: As per Resolution 2017-112 Owner's name Maverick Boat Group Address 3207 Industrial 29th Street Fort Pierce FL 34946 6. Certificate Expiration Date This Certificate of Capacity is transferable only to subsequent owners of the same parcel, and is subject to the same terms, conditions and expiration date listed herein. The expiration date can be extended only under the same terms and conditions as the underlying developm t orderissued with this certificate, or for subsequent develo�men orders; slued for the same property, use and size as described herein. Signed Planning and Development Services Director St Lucie County, Florida