HomeMy WebLinkAboutBUILDING PLANS 1GRW1C[
��
I��
CULPEPPER & TERPENING, INC.
CONSULTING ENGINEERS 1 LAND SURVEYORS
C,CT Project No.:15-057
File: SLC ENG
Sender's Email: ,;=.13;Lttlteg�n,,r,LzaLr.c_2n1
September 12, 2019
VIA: Hand Delivery
Mr. David Hays, P.E., CFM
Senior Project Engineer
St. Lucie County Water Quality Division
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982
RE: Sedona PUD — Phase 1 Construction
St. Lucie County Stormwater Permit No. 17-02
Engineer's Partial Certification — Southern Portion of Project
Dear Mr. I -lays:
This is to certify that the required infrastructure improvements for the southern portion of the
Scdona PUD Please 1 project have been completed in substantial conformance with the approved
construction plans and specifications. The completed portion includes the entire stormwater system,
detention pond and outfall, and paving and drainage infrastructure associated with Buildings 13, 14,
15, 16, 18, 19 and 20. The only minor deviation for the partial certification are as follows:
• Minor changes in final grade, and invert elevations for the project
These deviation does not affect the paving and drainage improvements of the site which are
completed in substantial accordance with the approved_ Construction Plans.
As always, should you have any questions, please do not hesitate to contact me at (772)464-3537 or
via the Email address referenced above.
`%�%J II II II)/7j/
Si`�48ie1v It P RL /'yy
CIENIS
jt{Y PEIZI'ER & TE1EjTING, INC.
F�.fAIM
S'er}t de -aor �ki.38723
P1110t
Cc: Gregg R. Wexler
RECEIVED -
SEP 13 2019
ENGINEERING
DIVISION
A LEGACY OF EXPERTISE AND EXCELLENCE
2980 SOUTH 25TH STREET I FT. PIERCE, FL 34981 1 (772) 464-3537 1 FAX: (772) 464-9497