Loading...
HomeMy WebLinkAboutBUILDING PLANS 1GRW1C[ �� I�� CULPEPPER & TERPENING, INC. CONSULTING ENGINEERS 1 LAND SURVEYORS C,CT Project No.:15-057 File: SLC ENG Sender's Email: ,;=.13;Lttlteg�n,,r,LzaLr.c_2n1 September 12, 2019 VIA: Hand Delivery Mr. David Hays, P.E., CFM Senior Project Engineer St. Lucie County Water Quality Division St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 RE: Sedona PUD — Phase 1 Construction St. Lucie County Stormwater Permit No. 17-02 Engineer's Partial Certification — Southern Portion of Project Dear Mr. I -lays: This is to certify that the required infrastructure improvements for the southern portion of the Scdona PUD Please 1 project have been completed in substantial conformance with the approved construction plans and specifications. The completed portion includes the entire stormwater system, detention pond and outfall, and paving and drainage infrastructure associated with Buildings 13, 14, 15, 16, 18, 19 and 20. The only minor deviation for the partial certification are as follows: • Minor changes in final grade, and invert elevations for the project These deviation does not affect the paving and drainage improvements of the site which are completed in substantial accordance with the approved_ Construction Plans. As always, should you have any questions, please do not hesitate to contact me at (772)464-3537 or via the Email address referenced above. `%�%J II II II)/7j/ Si`�48ie1v It P RL /'yy CIENIS jt{Y PEIZI'ER & TE1EjTING, INC. F�.fAIM S'er}t de -aor �ki.38723 P1110t Cc: Gregg R. Wexler RECEIVED - SEP 13 2019 ENGINEERING DIVISION A LEGACY OF EXPERTISE AND EXCELLENCE 2980 SOUTH 25TH STREET I FT. PIERCE, FL 34981 1 (772) 464-3537 1 FAX: (772) 464-9497