Job start, kettle set up, build trash box tear off and Install 1 st
7
9
91
area
j
marvin
Run lull for equipment load, trash removal supervise kettle man
1
8
8 LL
and qc work on roof periodically through the day
1. Men arrived at 7 had to wait for fingerprint screening of crew to begin working. Kettle is set up and running
crew is gridding off roof to match court administrator diagram for scheduling
2 Drains are rusted and not re -usable will need to replace with 5" retro fits
Bolt all snapped while removing ring on first drain can only assume the rest will be in the same condition. 11
drains total on high roof 1 on the lower
.,...i- y._._..x l i q;U:;.
o�i
Powered by 1 of 4 1 sic courthouse
i
{
•
Powered by E 3 Of 4 1 sle courthouse
1, Chris Bleicher, have reviewed and completed this report.
C� I is B I 06.� I OPM
Powemd by 4 of 4 1 sic courthouse
I
1 2. Any schedule delays occur?
3. Did weather cause any delays?
4. Any visitors on site?
S. Any areas that can't be worked on?
6. Any equipment rented on site?
❑
❑.i
❑
Fingerprint scanner g done by sherriffs
❑
❑
0 Dept.
cirris ')4/U2./lfi j II ---;,AM
❑
❑�/
❑
❑
❑d
❑
❑
❑.i
❑
❑ ❑ 2 Lull and dumpsters