HomeMy WebLinkAboutPROPOSAL FOR KITCHENBuilding Pro l K' posa ,for. atchen / Bathroom Remodel Date: 11/19/2014 --- Contractor: Mark Murphy 9990 8l' Street, Vero Beach, FL. 32 Phone: (772)388-3894 Cell: (772)91 Remodel to be performed by Absolute Notes: 1. All work to be done under building codes presently in 2. This home will be com, good and'workmanlike 3. Absolute Building & Re Owner from liability for contract. ' 4. All prices, are for labor and 5. Acronyms used throughout o ABR- Absolute Bui o FBC- Florida o KSM- KSM Client: Leslie & Dallas Gory 3100 N. AlA Unit 606 St. Lucie County, FL. Phone: (305) 389-1145 Email-dallasgory@bellsouth.net ST. LUC.tE COUNTY BIIILDING DIVISION REVIEWED FOR CO➢ L\CE REVIEWED BY 5/44r1yAv0 & Restoration IrRAINS AMYPERNUT MUST BE KEPT ON JOB OP. NO INSPECTION WILL BE MADE. will be in the state of by Absolute Building & :r, using good quality m: is a fully arising from with the SCANNED BY St. Lucie County , Inc. in a company to protect : performance of this �HESE PLAIVS AND ALL PROPOSED WORK AND SUBJECT TO ANY CORRECTIONS unless stated othe UIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY WITH ALL APPLICABLE CODES. 1_ are as follows: Restoration ARE THE RESPONSIBILITY OF THE CONTRACTOR OF RECORD FILE COPY a Building Proposal for Kitchen / Bath I. Demolition & rebuild as follows: a. i. Protect the home !with plastic and drop cic the construction process i ii. Relocate the furniture in other parts of the I iii. Protect areas witli plastic where no work v � I iv. Disconnect all oflthe plumbing fixtures frc v. Removal of all of the eI isting counter top vi. Removal of all o!ithe a I xisting appliances vtt. Removal of all o#j the cabinetry from the ki lower cabinets viii. Removal of the ix. Removal of the 1 x. ABR will record per homeowners had this done to i this so as we can believes this can materials. II• i;:All.lf l.:Pd,ilE ai .:4 6...i.. I' II ! i. Installation of new kitche. I solid wood with dove tail i ling in the kitchen it lights in the kitch ceiling so as to ha' ation. Owner menti .ing. ABR would lil, is out. From experie for around ($1,000 .. . ice.. a cabinetry. Cabinel drawers. The lower Remodel is where needed during come as needed 11 be performed a the kitchen including upper. & :n ceiling ✓e lighting installed as med that other units e some pictures of nce stand point ABR .00) including z will be built out of it I . *Absolute- Building Proposal for Kitchen / Bathroom Remodel roll out drawers wherever possible. All drawers & doors will be soft closing. The customer to choose final lacquer color finish, (there will be an additional charge for glazing) ii. Door style to be chosen by customer (door selection provided by contractor) Upper cabinets to Ibe 14" deep instead of the standard 12" deep. This will allow the owner to store the plates flat inside the cabinet. iv. The upper cabinets on the South wall will continue over closer to the window. v. There will be crown molding installed on top of the cabinets A. There will be a "light rail trim" under the upper cabinets so as to hide the under cabinet lighting vii. All of the upper cabinets will configured and built as per homeowners final approval NIL, hi 'P:Ih 11I;1�;17' djJ�a 1i — viii. The refrigerator area will have upper cabinets pulled forward for easy access ix. Next to the refrigerator cabinet - ABR will build 1 pantry unit — these will be approximately 28" wide & go to the ceiling nest to 3il1a FILE CO 411, AbsWuie 1; 1 � I, Proposal for Kitchen / Bathroom Remodel the refrigerator (cabinet drawer designed will be finalized by owner) x. Next to the pantry there will be a cabinet built to accommodate an existing wine cooker so as to have a built in appearance A. The cabinet just right of the kitchen sink is where there will be a garbage pull out (ABR will have to verify that there is indeed enough cabinet space for the garbage pull out) If that is not the case then a set of drawer banks can be installed in its place. xii. Next to the garbage pull out under the window there will be a 36" kitchen sink cabinet. This will have a bottom drawer installed for easy access to access cleaning products. The kitchen sink is to be an 80x20 sink as per homeowners request xiii. To the left of the sink there will bean 18" cabinet. This will be a bank of drawers for utensils etc ... This is usually a bank of (3) xiv. Dishwasher cabinet will have end panels to give the dishwasher so as to have a built in appearance_ xv. Next is a Built in for 30" slide in stove cabinet (owner requested about having a cook top with a wall oven bellow ABR will have to � 1 •i l-t + 3: - Building IV. a•::; Proposal for Kitchen / Bathroom Remodel cabinetry as per the homeowners request due to the height restrictions vi. Grout all of the tile with the XL grout that already has the sealer inside the grout for the greatest protection vii. Installation of wooden baseboards & the cabinet toe kick plate viii. Grout all of the flooring this is to be the excel grout, this has the sealer already in the grout. So that the grout is sealed all the way thru and not just a topical grout. i. Installation of a solid surface counter top with an 80/20 undermount sink ii. Installation of a tile back splash and grout to finish Installation of under cabinet lighting iv. Installation of the kitchen overhead lighting V. V. Paint the kitchen to finish (owner to choose final color) i. Removal & store the bathroom entrance door ii. Removal of the vanity plumbing fixtures for the. bathroom Removal of the existing vanity lighting above the mirror iv. —Removal of the mirror in the bathroom v. Removal of the vanity back splashes & counter top vi. Removal of the vanity from the bathrooms vii. Removal of the toilet in the bathroom 61Pi1; AbsohAt,e Buildini Proposal for Kitchen / Bathroom Remodel viii. Removal of the glass door from the tub��� ix. Removal of the bathtub wall / floor file x. Removal of the bathtub fixtures xi. Removal of the wallboard that surrounds the bathtub & around the toilet area where the new tile will be installed xii. ABR will check to see if the bump out wall in the bathroom was built to accommodate the bathtub, or if it is a chase wall for the rest of the condos. If the wall can be removed ABR will remove to increase the size of the shower area. xiii. Address the electrical outlets, vanity lighting and the exhaust fan in the bathroom and reconfigure as needed xiv. Removal of the medicine cabinet to accommodate a makeup mirror VI. !.1; IN i i. ABR needs to run a dedicated GFI for the TOTO toilet from the breaker box. The owner is also requesting that while the electrical work is being performed that ABR will install an additional electric for a future.closet area next to the breaker box ii. Installation of a shower curb with a knee wall that will be approximate 3ft wide by 44" tall. This is so that the shower area -- - - can be turned -into a walk-in shower without having a shower door iii. Frame out shower area for the soap niches (owner to finalize the placement) 71 I',i Building Resh 11(,1 11 Proposal forKitchen / Bathroom Remodel iv. The knee wall will be capped with the same solid surface material used for the vanity & niche. v. A frameless glass panel will be installed on top the knee wall A. Installation of the shower fixtures in the knee wall so that the homeowner can turn on the fixtures without having to enter the shower area vii. Make all necessary drywall repairs in the bathroom as needed viii. Installation of a square ebb drain for the shower. This will have a key to remove the drain to access the hair catch. ix. Installation of the rubber shower pan as per the FBC x. Installation of the concrete dry pack as per the FBC xi. Installation of �jz concrete Hardie board where file will be installed on the bathroom walls xii. ABR will use mold resistant tape for the concrete board seams. ABR will tape and thin -set the corners of the walls for greatest moisture protection xiii. Installation of the shower wall tile as per the manufactures recommendation (layout approved by owner) xiv. Grout all of the walls with the excel grout, this has the sealer in it - -- --- - for the greatest protection xv. Installation of the bathroom floor file as per manufactures recommendations 811'a; Building Proposal for Kitchen / Bathroom Remodel xvi. Installation of new vanity in the bathroom— the cabinets will be built out of solid wood. Owner will have a vessel sink installed, this will allow for a couple of drawers to be installed for the vanity xvii. Installation of the counter top & backsplash in the master bathroom xviii. Installation of solid surfaces / sink fixtures / mirrors / light fixtures / toilet & frameless glass for the shower area xix. Prime & paint the bathroom (owner to choose colors) i. ABR will provide a dump trailer for all waste removal ii. All waste will be dumped at the local county landfill ABR will maintain a clean work site at all times and protect the rest of the home during the construction process Owner's Responsibilities; o Owner to provide all of the fixtures such as the appliances, tile, solid surfaces & accessories such as door handles, sink/faucet, lighting etc... o Owner to pack up all personal belongings o Owner will receive contractor pricing where available ABR's Responsibilities: o ABR to provide all of the permits & county inspections o ABR to provide all tools and materials -as outlined -above _ o ABR to provide all of the cabinetry for the kitchen & bathroom, all of the non -fixture items like drywall, baseboards, crown molding, outlets & switches, paint, screws, nails, screws, floor protection - etc... o ABR will maintain a CLEAN WORK SITE AT ALL TIMES BILE COPY >m,BuIlding, Absolul a - ;n 11 Proposal for Kitchen / Bathroom Remodel o ABR will provide experienced craftsmen that are employed with ABR and have provided these services for our customers with the upmost Professionalism Home Construction Remodeling Cost: The Contractor proposes to furnish all labor and material necessary for the completion of the following specifications described above for the sum of: (Modification of Master Bath addition to contract for 17,000.00 added on to the existing contract. This does not include any fixtures or fine finishes. All fine finishes are supplied by owner. Owner is adding on master closet materials to our scope at cost and will be submitted in forest of receipt as a change order.) This contract is not inclusive of options to be sent and confirm as option add ons. These items are Wallppaer removal in Master Bederoom, removal of popcorn ceiling. Painting of ceiling in master bedroom. New Casing and baseboard option. Total time for completion approximately 4 weeks start to finish - Start date: Total cost for the kitchen & Bathroom remodel: Payment Details as outlined below: -✓ •' 10%Down ($2;900.00) To lock in the contract for permitting . start finish date and to finalizing the cabinetry with the customer ($6,500.00) ,Six Thousand Five Hundred Dollars -For building of the cabinetry this is for materials & milling of the cabinets L20 COPY Building & Peek, ,f fill Proposal for Kitchen / Bathroom Remodel • ($4,000.00) Four Thousand Dollars, • Due on the start of the demolition of the kitchen & Bathroom: Master Bath Demo, Wine Closet Demo, and Master Closet Demo. $2,700 Two Thousand Seven Hundred Dollars ($4,500.00) Four Thousand Naive Hundred Dollars: - Due for the rebuilding $ �°� of the bathroom • ($5,000) Five Thousand Dollars: Due for Rebuilding of the Master bathroom, Wine Closet, and Master Bedroom Closet. • ($4,500.00) Four Thousand Five hundred: - Due for the Installation of the tile for the bathroom & bathroom fixtures p 9.JC;k^ Master Bath Fixtures, Wine Closet, and Master Closet : Five_ Thy Dollars - $5,000.00 r am ire41 ($4,500.00) Four Thousand Five Hundred Dollars: - Due for the installation of kitchen cabinets, hardware, appliances, painting & final fix installed tures to be installed Master Bath, Wine Closet, and Master Closet ($4,300.00) FourThousand Three Hundred Dollars — Due for installation of vanities, hardware and Fine finishes. • The final ($2,775.00) Two Thousand Seven Hundred & Seventy Five Dollars: Due upon completion Absolute -, •- WBuilding & Restoration, Inc. Proposal for Kitchen / Bathroom Remodel Additional information: All material is guaranteed to be as specified and the work will be completed in a workmanlike manner in accordance to specifications. Any and all alterations or deviations from the sorted specifications involving extra costs and materials will be executed upon verbal or written change orders billed @ $45.00 per hr plus materials. These changes turn into an extra charge, over and above the estimate, All agreements are contingent upon strikes, accidents or delays beyond contractor's control. Owner of property to ate. fire, regimen, and other necessary insurance. Our workers are fully covered by workmen compensation insurance. 6, tO either party commences legal action to enforce its rights pursuant to this agreement, the prevailing party in said legal action shall be entitled to recover its reasonable attomey,s fees and costs of litigation relating to said legal action & highest amount of interest as determined by a court of competent jurisdiction. Submitted by: Mark Murphy - Contractor enntrant..� Acceptance of Proposal As stated in the above specifications, the costs, materials and specifications are satisfactory and are hereby accepted. I authorize the contractor to perform the work as specified and payments will be made as described above. Customer Signature Date: 121�... FIU'111,OPY