Loading...
HomeMy WebLinkAboutMISC LETTERCULPEPPER & TERPENING, INC. CONSULTING ENGINEERS I LAND SURVEYORS C,CT Project No.:15-057 File: SLC F.NG Sender's September 12, 2019 VIA: HmdDeGvery Mr. David Hays, P.E., CFM Senior Project Engineer St. Lucie County Water Quality Division St. Lude County 2300 Virginia Avenue Ft. Pierce, FL 34982 RE: Sedona PUD — Phase 1 Construction St. Lucie County Stormwater Permit No. 17-02 Engineer's Partial Certification — Southern Portion of Project Dear Mr. I -lays: This is to certify that the required infrastructure improvements for the southern portion of the Sedona PUD Phase 1 project have been completed in substantial conformance with the approved construction plans and specifications. The completed portion includes the entire stormwater system, detention pond and outfall, and paving and drainage infrastructure associated with Buildings 13, 14, 15, 16, 18, 19 and 20. The only minor deviation for the partial certification areas follows: • Minor changes in final grade, and invert elevations for the project These deviation does not affect the paving and drainage improvements of the site which are completed in substantial accordance with the approved Construction Plans. As always, should you have any questions, please do not hesitate to contact me at (772)464-3537 or via the Email address referenced above. \1�tt ii 1111/�T�, Si\krihic]vyiARR gygA�ii�i yli PEI�PER & TEI2�lE>JING, INC. 387 3 N -13 bf {.�Yf`� Sett , deny Flocidaf ot���38723 ) IIII111 Cc: Gregg R. %Wexler RECEIVED HP 13 2019 ENGINEERING DIVISION A LEGACY OF EXPERTISE AND EXCELLENCE. 2980 SOUTH 25TH STREET I FT. PIERCE, FL 3,1981 I (772) 464.3537 1 FAX:(772) 464-9497 Joe Cicio From: Joe Cicio Sent: Tuesday, June 05, 2018 10:43 AM To: 'weeksfarmsfl4@gmail.com' Cc: 'Gregg Wexler'; Joe Cicio Subject: Review Comments for Permit Numbe 805-03^ 7 Attachments: Report -FL Review_Comments_Noncompliant-jrf (1).pdf Dear St Lucie County Permit Applicant, Thank You for choosing to do business and invest in St Lucie County. St Lucie County is committed in assisting you to navigate the building review process. Please know that county staff is committed to customer service and part of that service is providing assistance and guidance with our processes. Please do not hesitate to contact us further to discuss your building project as needed. ' Please see the attached plan review comments which have been generated for your permit. As soon as we receive the modified plans and any additional required documents back from the Design Professional, Contractor, Fire Department or Owner we will forward the permit package to our permitting department for issuance. Thank You ,70e, k14. Gicio Plans Examiner II Standard Building Inspector Building Plans Examiner One nand Tcvo Aa nilyDwellingInspector One ,and Two Family Plans Examiner St. Lucie County Planning and Development Services 772-462-6453 2010 8, 20i7 • totwdk .Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to the public and media upon request. It is the policy of St. Lucie County that all County records shall be open for personal inspection, examination and / or copying. Your e-mail communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e-mail and delete all materials from all computers. l632 � 1701 South 371" Street (34547) PO aox 3191, Fort Pierce, FL 34948 May 10, 2017 Stefan Mathes, P,E Culpepper & Terpening, Inc 2890 South 250' Street Fort Pierce, FL 34981 Phone., 7%2.466.1600 Fax: 772.468.2414 Water/Wastewater Engineering "committed to Qualiiy" SUBJECT: Sedona PUD, Phase 1 SW Comer of 25' St, and Edwards Rd Intersection Fort Pierce, FL 34981 Dear Mr. Mathes, RECMVED JUL R U 2016 Permitting Department St. Lucie County As requested, Fort Pierce UtilltiesAuthority (FPUA) would like to confirm the availability of water and wastewater service to the above -referenced project. Capacity is currently available for the 78 units proposed in Phase 1 at FPUA's Water Treatment Plant and Water Reclamation Facility, The capacity reserved is contingent upon an approved supply agreement between the owner and FPUA, as well as an executed annexation agreement. Available capacity beyond the 78 units proposed in Phase 1 will be determined and dependent on a new supply agreement between the owner and FPUA. Said supply agreement will outline the rights and requirements of the owner and FPUA in any necessary upgrades to existing facilities, wastewater lift station and/or force main to accommodate additional units. Sincerely, Richard Mutterback Environmental Engineer INKS, w� sr mi.rasa>ua.:ca IeWon(r m rfmi= ur cu:t=ers wt?. ete+ iae relaedc xm Taerdy unee fn a Ccrtlrc o effort m trnarce tr( m qw ce rife in w cx mn jw. From: Gregg Wexi;ui'grwexier@aol.com Subject: Sedona_AvailabilityLetter 5-10-17.pdf Date: Jul 27, 2018 at 12:40:54 PM To: grwexler@aol.com