HomeMy WebLinkAboutMISC LETTERr
CULPEPPER & TERPENING, INC.
CONSULTING ENGINEERS I LAND SURVEYORS
C&T Project No.:15-057
File: SLC ENG
Sender's Email:.soia hs 2ct-en�,��r�l
September 12, 2019
VIA: Hand Delivery
Mr. David hays, P.E., CFM
Senior Project Engineer
St. Lucie County Water Quality Division
St. Lucie County
2300 Virginia Avenue
Ft. Pierce, FL 34982 .
RE: Sedona PUD — Phase 1 Construction
St. Lucie County Stormwater Permit No. 17-02
Engineer's Partial Certification — Southern Portion of Project
Dear Mr. Hays:
This is to certify that the required infrastructure improvements for the southern portion of the
Sedona PUD Phase 1 project have been completed in substantial conformance with the approved
construction plans and specifications. The completed portion includes the entire stormwater system,
detention pond and outfall, and paving and drainage infrastructure associated with Buildings 13, 14,
15, 16, 18, 19 and 20. The only minor deviation for the partial certification are as follows:
• Minor changes in final grade, and invert elevations for the project
These deviation does not affect the paving and drainage improvements of the site which are
completed in substantial accordance with the approved Construction Plans.
As always, should you have any questions, please do not hesitate to contact me at (772)464-3537 or
via the Email address referenced above.
\\\\tllllllJ�� / -
Si\Zr>s4elvg�ARL li?gr''i., A;unoo alaq -1�
jtff PETER & TE?tE1�TING, INC. �8
.387 3 N aEINNVOR
Floiida)1 itt\ 38723
Cc: Gregg R. Wexler
RECEIVED
SEP 13 2019
ENGINEERING
DIVISION
A LEGACY OF EXPERTISE AND EXCELLENCE
2980 SOUTH 25TH STREET I, FT. PIERCE-, FL 34081 ; (772) 464.3537 1 FAX:(772) 464-9407