HomeMy WebLinkAboutTHESHOLD INSPECTIONSThreshold Inspections
Special Inspection Plan
May 4, 2018
Proj ect:
Owner's Representative
Structural Engineer of Record
SCANNED
BY
St. Lucie County
Bryn Mawr —Bldg. A
5061 N. AIA
Ft. Pierce, Florida 34949
Elliott Merrill Community Management
Gene Ross
835 20' Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37 h Ave
Vero Beach, Florida 32960
M L Engineering Inc.
2030 37c Ave
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772) 569-4041
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and. Contractor. All discrepancies shall be brought to the
Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought
to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. Job site safety means and methods are solely the responsibility
of the Contractor.
Michael A. Luc,
Florida P.E. No. 47520 -
Special Inspector No. 1061
M L Engineering, Inc.
2030 37u' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Bryn Mawr— Building A
5061 N. Al A
Ft. Pierce, Florida 34949
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The special inspector shall be qualified as a building inspector under Part XII of
Chapter 468, Florida Statutes, or certified as a special inspector under Chapter 471 or 481,
Florida Statues
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inch
2030 37u' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
2
Special Inspection Plan
Bryn Mawr — Building A
5061 N. Al A
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of concrete spalls at walkways
2. Replace cracked railing posts at common walkways.
3. Repair of deck coating on walkway floors.
4. Repair cracks in top rails at common walkways.
5. Provide expansion joints in top rails at common walkways.
Concrete Repairs
1. Verify location and quantity of repairs.
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete repair products.
4. Observation of concrete placement for repair areas in accordance with the Contract Documents.
M L Engineering, Inc.
2030 37a' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
Ntwv. mlen¢i neerineinc.com
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 4
Mr. Gene Ross —Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS —2018 — BLDG A
5061 NORTH HWY. AIA, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 1806-0271
PROJECT NAME: Bryn Mawr Condos 2018 — Bldg A DATE: September 26, 2018
CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Daniello & Associates PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Final
OBSERVATIONS:
All decifiencies from previous report has been corrected. A final certification letter will follow this report.
�SI,•1111r1•.,• SCANNED
NTHONy '•., BY
• sE •.,6` St. Lucie County
G
Page 1 of 1
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37" Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineerineinc.com
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 4
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Danielle, & Assoc.
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS — 2018 — BLDG A
5061 NORTH HWY. AIA, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 1806-0271
PROJECT NAME:
Bryn Mawr Condos 2018 — Bldg A
DATE:
September 26, 2018
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Daniello & Associates
PROJECT MGR:
Chris Arias
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Final
OBSERVATIONS:
All decifiencies from previous report has been corrected. A final certification letter will follow this report.
n
� h „r Y n`/ •r
7OCT - 5 RECD
%8~Jw-� -0 7/
Page 1 of I
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineeringinc.com
PROJECT NAME:
CLIENT:
CONTRACTOR:
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 3
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS — 2018 — BLDG A
5061 NORTH HWY. AIA, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 1806-0271
Bryn Mawr Condos 2018 — Bldg A
Elliott Merrill Community Mgt.
Daniello & Associates
DATE: September 6, 2018
LOCATION: Ft. Pierce, Florida
PROJECT MGR: Chris Arias
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Final walkthrough
OBSERVATIONS:
We performed a final walk through of all repaired areas. All surface spalls included in repair documents have been
completed and decorative topping applied to match surrounding areas. The walkway railing posts have been replaced
and painted to match.
DEFICIENCIES:
1. The crack repairs and new expansion joint in the top rail of the walkways at the 91 floor was not repaired. 'Ibis
will be included in the 2019 repair list.
2. Debris along the landscape at the west elevation needs to be cleaned up.
3. Walkway topping needs to be painted to match surrounding areas at the replaced posts.
'P�,j'CHOIVy�
SSE•
�:.
FL 0(�
�3SIONP;
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlenginecringinc.com
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 3
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
Pic 1
West elevation: Debris in landscaping.
Pic 2
Railing post replacement: Topping requires painting to
match surrounding areas.
Page 2 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlenginceringinc.com
PROJECT NAME:
CLIENT:
CONTRACTOR:
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 2
Mr. Gene Ross —Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS — 2018 — BLDG A
5061 NORTH HWY. AIA, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 1806-0271
Bryn Mawr Condos 2018 — Bldg A
Elliott Merrill Community Mgt.
Daniello & Associates
DATE:
July 12, 2018
LOCATION:
Ft. Pierce, Florida
PROJECT MGR:
Chris Arias
INSPECTED BY: Mike Luc WEATHER: Sunny
WORK INSPECTED:
Surface spalls
OBSERVATIONS:
Demolition has been completed and all loose concrete has been removed at the surface spalls located at the following
areas:
Unit 102 — Concrete spall approx 8 square feet. During demo and after the screen enclosure was removed, a
crack was visible in the concrete column adjacent to the surface spall. The loose concrete was removed and
corrosion was found on the vertical reinforcing bars. The bars will require power tool cleaning and coating.
The repair shall be formed and poured with Sika 211 SCC Plus. The approx area of column repair is 1.5 cubic
feet.
• Unit 205 — Concrete spall approx 3 square feet
• Unit 305 — Concrete spall approx 4 square feet
All reinforcing bars have some surface corrosion and require power tool cleaning and coating with an approved
corrosion inhibitor.
Reinforcing is in accordance with design documents and is approved for concrete pour.
Concrete pour is scheduled for Friday July 13' @ I Iam.
FL OR
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37t' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
N w .mleneineerineinc.com
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 2
Mr. Gene Ross —Elliott Merrill
Mr. Cart Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
Pic 1
Unit 102: Exposed reinforcing at surface & column spall.
Pic 2
Unit 205: Surface corrosion on reinforcing bars.
Unit 305: Surface spall near front door.
Page 2 of 2
_1V __
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mleneineerinainc.com
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No.1
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS — 2018 — BLDG A
5061 NORTH HWY. AIA, FT. PIERCE, FL 34949
SLC BUILDING PERMIT NUMBER: 1806-0271
PROJECT NAME:
Bryn Mawr Condos 2018 — Bldg A
DATE:
July 5, 2018
CLIENT:
Elliott Merrill Community Mgt.
LOCATION:
Ft. Pierce, Florida
CONTRACTOR:
Daniello & Associates
PROJECT MGR:
Chris Arias
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Surface spalls & loose decorative topping.
OBSERVATIONS:
Demolition has been completed and all loose concrete has been removed at the spalls located at the following areas:
Unit 405 — Concrete spall approx 2 square feet
Unit 605 —Concrete spall approx 6.5 square feet
Unit 702 — 2 spalls were located at the door and window (11.5 square feet)
Unit 703 —No spall was found, only loose topping (12 square feet)
Unit 801— Loose concrete was removed at spall. Reinforcing bars have minimual clearance to the top of slab.
Wire ties shall be added to hold the top bars down from the top of slab (11 square feet)
Unit 903 —No spall was found, only loose topping (I I square feet of repair)
All reinforcing bars have some surface corrosion and require power tool cleaning and coating with an approved
corrosion inhibition.
Reinforcing is in accordance with design documents and is approved for concrete pour.
Concrete pour is scheduled for Friday July 61 @ 9am.
''10iHON'`
,aW S F '
FLo?'..
�.ceint�lP�_
Page 1 of 2
T
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 371h Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlengineeringincxom
Project No. 18-124 A
Client:
Building Official:
Contractor:
File
Report No. 1
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson, SLC Bldg. Dept.
Mr. Chris Arias, Daniello & Assoc.
Unit 605
Exposed reinforcing at surface spall
Pic 2
Surface corrosion on reinforcing bars
Pic
Unit 702: Large surface spall @ front door
Page 2 of 2