G702 APPLICATION AND CERTIFICATION FOR PAYMENT
vac r
700WNER: Elliot Merril Community Magm[ Bryn Mawr Condominium APPLICATION NO: REI'AINAOR 5 Dittibutionto:
835 th Place
Vero Duch, FL 32960 DOWNER
Application Data. PERIDDTO: 09/27/18 eENGINCER
FROM CONTRACTOR: VLI ENGINEER: MLEngineering Inc 09/27/18 CONTRACTOR
Danielle, SaLTar&Sons 2030Awm.e , NOTALUMPSUMDID:Thcamcnet is based
2700N.Im UcaUan Ave.,Ste 9 Vero Beach. FL 32960 uPonwr tcdgaontltimilswdtnflhibl[AQuandty SrENule.Theamouotpald
Wont Palm Bc Concr 33407 will be hued upon actual gwntubt/wark performed at rates In ErMbitA.
CONTRACT; Cencrem Rastoratloo Repairs CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certinesthattothe beg oftheContrazmrsknowledge,
Application IS made for payment, asshown below, in connection with the Contract Information and belief the Workcovered by misAppllotion for Payment has been
Conlinumlon SheetShoe[ G703, Is attached. completed In accordance with the Contract Doeumonts,thatall amounts have been paid by
the Contractor par Work lorwhich previous CertineatesforPayment were issued and
payments received from the Owner, and thatcurt.at payment shown herein is now due.
1. ORIGINAL CONTRACTSUM
2. Netcbange by Orange Orders
3. CONTRACT SUM TO DATE (Line 1 t 2)
4. TOTAL COMPLETED & STORED TO
DATE (Column 12 on G703)
5. RlrrAINAGE
a. 10 %of Completed Work S
b._%ofslared Material $
Total Retalnage (Lines5a+Sb or
Total In Column 15 ofG703)
6. TOTAL EARNED LESS RETAINAGE
(Line 4 Lass Line 5 Total)
7. LESS PREVIOUS CERTIFICATES FOR
PAYMENT (Line 6 from prior Certificate)
8. CURRENT PAYMENT DUE
9. DALANCETO FINISH, INCLUDING ROTAINAI
(Line 3 I= Line 6)
$_ 33,429:60
S 7,454.29 CONTRA--"
S 40;88329
S 40,883.29
0y:
State of
Subscribed and sworn to before
Nanny Public
My Commission expires: fi.
$ 0.00 ENGINEER'S CERTIFICATE FOR PAYMENT
S 40,883.29 In accordance with the Contract Documents, based on on -site observations and the data
comprising the application. the Engineer certifies to the Owner that to the best of the
Engineer's knowledge, information and belief the Work has progressed as indicated,
S 38,253.Ofi the quality of the Work is In accordance with the Contract Document; and the Contractor
S 2,636.23 Is entitled to Puymontafthe AMOUNT CERTIFIED.
S / (0.00)
AMOUNT CERTIFIED.........._ S
CHANGE ORDER SUMMARY
Total lunges approved
In Preview months by Owner
ADDITIONS
DEDUCTIONS
$10,521.47
Total approved this Month
S3,067.18
TOTALS
$10521.47
$3067.1E
NOT CHANGESby Change Order
$7,45429
(Attach explanation ifomount cerdffed differs from the amount applied. initial all figuresan this
Application andan the CandavationSheet thatare changed to conform with the ameuntcertifred.)
ENGINEER:
BY:
This Certincam is notncgmiable. The AMOUNT CERTIFIED Is payable only to the
Contractor named hem]&Issuance, payment and acceptance ofpaymant am without
prejudice to any rights of the Owner or Contractor underth@ Contract
SCANNED
By
:ie County
Date: 09/27/18
., RITACOLLAZO
f`@ - MYCOMMISSIONGGG 114113
€ EXPIRES: June 13. ZD21
�z,63o.z3
Date• 1 Z
CONTINUATION SHEETG703 Page 1 of
Document G702 APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NO: 5
Contmctar's signed Certification is attached. APPLICATION DATE: 9/27/2018
Use Column 1 an Contracts where variable retainage for line items may apply PERIOD TO: 9/27/2028
2
3
4
5
6
...,rw,
NO.
Dgnmdwr
DESCRIPTION OF WORE
SCHEDULED
7 6 9
WORK COMPLETED
30 11
Value Completed
12
Total Completed
13
%
14
BALANCE
15
RETMNAGE
FROM PREVIOU
THIS PERICK
Total
FROM PREVIOUS
THISPENOD
VALUE
and Storage
TOFINISH
(IFVA"LE
APPLICATION
APPLRMTION
RATE)
QtV
Unit
Price
C3 •5
7i8
7.5
8.5
10.11
6-12
Building A -5061 North AIA
56.00
sf
$79.00
$4,424.00
45.22
45.22
$3,572.38
$0.00
$3,572.38
81%
$851.62
$357.24
Surface Spoils
Deck Coating
70.00
sf
$7.50
$525.00
70.00
70.00
$525.00
$0.00
$525.00
1000/0
$0.00
$52.50
Railing Post
20.00
ea
$135.00
$2,700.00
20.00
20.00
$2,700.00
$0.00
$2,700.00
100%
$0.00
$270.00
Crack Repair Top Rail
2.00
ea
$60.00
$120.00
0.00
$0.00
$0.00
$0.00
0.00%
$120.00
$0.00
Expansion Joint Top Rail
2.00
ea
$35.00
$70.00
0.00
$0.00
$0.00
$0.00
0.00%
$70.00
$0.00
Remove & Replace Screen
2.00
ea
$525.00
$1,050.00
0.00
$0.00
$0.00
$0.00
0.00%
$1,050.00
$0.00
Mobilization And General Conditions
1.00
Is
$6,000.00
$6,000.00
1.00
1.00
$6,000.00
$0.00
$6,000.00
100%
$0.00
$0.00
30.00
sf
$79.00
$2,370.00
30.00
30.00
$2,370.00
$0.00
$2,370.00
100%
$0.00
$0.00
$0.00
$237.00
Buildin B- 5059 North A1A
Surface Spalls
Deck Coating
50.00
sf
$7.50
$375.00
50.00
50.00
$375.00
$0.00
$375.00
100%
$0.00
$37.50
Railing Post
8.00
ea
$135.00
$1,080.00
8.00
8.00
$1,080.00
$0.00
$1,080.00
300%
$0.00
$108.00
Edge
6.00
If
$115.00
$690.00
6.00
6.00
$690.00
$0.00
$690.00
100%
$0.00
$69.00
Remove & Replace Screen
N/A
_
Mobilization And General Conditions
1.00
30.00
Is
sf
$3,000.00
$79.00
$3,000.00
$2,370.00
1.00
25.06
1.00
25.06
$3,000.00
$1,979.74
$0.00
$0.00
$3,000.00
$1,979.74
100%
84%
$0.00
$390.26
$0.00
$0.00
$0.00
$0.00
$197.9797
Building C• 5055 North AlA
Surface Spalls
Deck Coating
40.00
sf
$7.50
$300.00
33.96
33.96
$254.70
$0.00
$254.70
85%
$45.30
$25.47
Railing Post
23.00
ea
$135.00
$3,305.00
23.00
23.00
$3,105.00
$0.00
$3,105.00
100%
$0.00
$310.50
Crack Repair Top Rail
9.00
ea
$60.00
$540.00
0.00
$0.00
$0.00
$0.00
0.00%
$540.00
$0.00
Expansion Joint Top Rail
6.00
ea
$35.00
$210.00
6.00
6.00
$210.00
$0.00
$210.00
100%
$0.00
Remove & Replace Screen
$21.00
Mobilization and General Conditions
1.00
Is
$4,500.00
$4,500.00
1.00
1.00
$4,500.00
$0.00
$4,500.00
100%
$0.00
$0.00
$0.00
Change Order No 1
$0.00
Permit - Buildings A,B&C
1.00
Is
$1,042.02
$1,042.02
1.00
1.00
$1,042.02
$0.00
$1,042.02
100%
$0.00
$0.00
$0.00
NOC- Buildings A, B & C
Change Order No. 2
1.00
Is
$39.00
$39.00
1.00
1.00
$39.00
$0.00
$39.00
100%
$0.00
$0.00
Deck Coating -BIdgA
39.33
sf
$7.50
$294.98
39.33
39.33
$29498
.
.
$000
$294.98
100%
$0.00
$0.00
$29.50
Railing Post -BIdgA
1.00
ea
$135.00
$135.00
1.00
1.00
$135.00
$0.00
$135.00
100%
$0.00
$13.50
C.01 Column repair -BIdgA
0.89
cf
$305.00
$271.45
0.89
0.89
$271AS
$0.00
$271.45
100%
$0.00
$27.15
Deck Coating -BIdgB
22.58
sf
$7.50
$169.35
22.58
22.58
$169.35
$0.00
$169.35
100%
$0.00
$16.94
Surface Spalls -BIdgB
Railing Post -BIdgB
1.11
sf
$79.00
$87.69
1.11
1.11
$87.69
$0.00
$87.69
100%
$0.00
$8.77
Edge -BIdgB
1.00
ea
$135.00
$135.00
1.00
1.00
$135.00
$0.00
$135.00
100%
$0,00
$13,10
7.25
If
$115.00
$833.75
7.25
7.25
$033.75
$0.00
$833.75
100%
$0.00
$83.38
$0.00
0
CON77NUATION SHEET G703
Document G702 APPLICATION AND CERTIFICATE FOR PAYMENT, containini
Contractor's signed Certification is attached
Use Column I on Contracts where variable reminage for line items may apply
-
DESCRIPTION OF WORK
a
D
6
SCHEDULED
VALUE
7
WORKCOMPLETED
8
9
30
Value Co
OM PREVIO
THIS PERIO
Total
FROM PREVIOUS
APPLICATION
APPLICATION
hang Order rd�N
QtY
Unit
Price
3.5
7+e
7•5
Expansion Joint Top Rail -BldgC
15.00
ea
$35.00
$525.00
Change order
15.00
15.00
$525.00
No. 4
C.01 Expansion joint at pool
194
If
$17.00
$3,298.00
Thu-day9 13 2018 3 Workers
(/ / )
24
mh
$65.90
194.00
124.00
$1,581.60
Friday (9/14/2010) 3 Workers
$1,581.60
24.00
24.00
$1,581.60
Materials
24
mh
$65.90
$1,581.60
24.00
21.00 4.00
$ 1,581.60
1.00
Is
$527.03
$527.03
1.00
$527.03
Building A -5061 North ALA
Surface Spalls
10.78
Crack Repair Top Rail
2.00
Expansion Joint Top Rail
2.00
Remove & Replace Screen
2.00
Building C- 5055 North ALA
Surface Spalls
4.94
Deck Coating
6.04
Crack Repair Top Rail
9.00
$79.00 ($851.62)
$60.00 ($120.00)
$35.00 fS7n nm
Page 2 of 2
APPLICATION
APPLICATION DATE: 9/27/2018
PERIOD TO: 9/27/2018
PROJECT NO: Bryn Mawr
11f�d
13 14 15
pleted % BALANCE RETMNALE
'EMOD rage TO FINISH 0"ARbaux
RATE)
.5 11 6-12
$0.00
$0.00 $525.00 100% $0.00 $52.50
$0.00
$0.00
$0.00 $3,298.00 1000/0 $0.00 $329.80
$0.00 $1,581.60 100% $0.00 $158.16
$0.00 $1,581.60 1000/0 $0.00 $158.16
$0.00 $527.03 100% $0.00 $52.70
$0.00
$0.00
$0.00
($851.62) $0.00
($120.00) $0.00
($70.00) $0.00
($1,050.00) $0.00
$0.00
($390.26) $0.00
($45.30) $0.00
($540.00) $0.00
CHANGE ORDER
1 57,O �
Distributed to: OWNER
ENGINEER
CONTRACTOR
OTHER
B
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGE WITH RESPECT TO ITS
COMPLETION OR MODIFICATION. AUTHENTICA71ON OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401
PROJECT: Bryn Mawr Condomininum
5055+ 5059 & 5061 North AlA
Fort Pierce, FL 34949
TO CONTRACTOR:
Daniello, Salazar & Sons
2708 N. Australian Ave, Ste 9
West Palm Beach, FI 33407
The Contract is changed as follows:
Building A -5061 North AIA
Spalls
Crack Repair Top Rail
Expansion Joint Top Rail
Remove & Replace Screen
Building C- 5055 North AIA
;rface Spalls
.,eck Coating
Crack Repair Top Rail
CHANGE ORDER NO:
DATE:
PROJECT NOS:
CONTRACT DATE:
CONTRACT FOR:
10.78
sf
$79.00
($851.62)
2.00
ea
$60.00
($120.00)
2.00
ea
$35.00
($70.00)
2.00
ea
$525.00
($1,050.00)
4.94
sf
$79.00
($390.26)
6.04
sf
$7.50
($45.30)
9.00
ea
$60.00
($540.00)
5
9/27/2018
5/24/2018
CONCRETE REPAIRS
Total ($3,067.18)
The original Contract Sum was $33,429.00
Net change by previously authorized change orders 10,521.47
The Contract sum prior to this Change Order was $43,950.47
The Contract Sum will be increased/decreased by this Change Order in the amount of (3,067.18)
The New ( Contract Sum) including this Change Order will be $40,883.29
The Contract Time will be ( increased ) by (0 ) days.
-Ilo, Salazar & Sons
N. Australian Ave, Ste 9
Palm Beach, FI 33407
Engineering INC
0 37th Avenue
Beach, FL 32960
Community Management
20th Place
Beach, FL 32960
1
Torgo Software www.TorgoSoftware.com 1996-2011 ALL RIGHTS RESERVED Page 1 of 1
Original Contract Amount $33,429.00
G 701-CO $10,521.47
$43,950.47
Sub -total
Building A $135.00 $271.45 $2,329.00 $3,390.00
$87.69 $135.00 $833.75 $2,330.00 $3,916.13
$2,330.00
$360.34
$294.21
Building B
$360.34
$169.35
9iu ling:- 7
$360.34
$525.00
G 701-CO
$10,521.47
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Avenue
Fort Pierce, FL 34982
Phone:(772)462-1553 Fax:(772)462-1578
Receipt
Online address: http:/hvww.stfucieco.org/planning/pertniWng.htm
Quick Links:
Permit Status Lookup
Online Building Inspection System
Daily Inspector Schedule
Date: November 16, 2018
Receipt M
0000145482
Permit Number:
1806-0269
Job Address:
5055 N AIIA PROJECT
Amount:
$157.15
Paid With:
CHECK
SCANNED
BY
St. Lucie County
Check # 2159
Paid By: DABUEKKO, SAKAZAR ABD SONS INC
Received By: humphreya
Fee Description Fee Amount
NPermi714 N-Permit Fee - Resid & Comm Renovations $2501 plus $157.15
Total: $157.15
11/16/2018 1:41:31 PM