HomeMy WebLinkAboutTHRESHOLD INSPECTIONSSCp,NNED gY Threshold Inspections St, Lucie COW Special Inspection Plan May 4, 2018 Project: Bryn Mawr —Bldg. C 5055 N. AlA Ft. Pierce, Florida 34949 Owner's Representative Structural Engineer of Record Elliott Merrill Community Management Mr. Gene Ross 835 20' Place Vero Beach, Florida 32960 M L Engineering, Inc 2030 37"Ave Vero Beach, Florida 32960 M L Engineering Inc. 203037" Ave Vero Beach, Florida 32960 Phone: (772)569-1257 Fax: (772) 569-4041 This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection Services applicable to this project as well as the name of the Special Inspector. The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought to the attention of the Building Official and Structural Engineer of Record. The Special Inspector shall submit a final report to the Building Official documenting completion of all Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out quality control inspections and testing. Job site safety means and methods are solely the responsibility of the Contractor. /j/z Michael Florida P.E. No:'47520 ' t Special Inspector'No.'1061 M L Engineering, Inc. 2030 37a' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) Special Inspection Plan Bryn Mawr — Building C 5055 N. Al Ft. Pierce, Florida 34949 General Motes 1. The purpose of this special Inspection as required by the FBC, is to report and record the repair procedures highlighting those that are not in compliance with the Contract Documents. 2. The Special Inspector shall meet the requirements of the Board of Building Codes and Standards. The special inspector shall be qualified as a building inspector under Part XII of Chapter 468, Florida Statutes, or certified as a special inspector under Chapter 471 or 481, Florida Statues 3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to provide other services or work, such as material or concrete testing on the same project. 4. The Contractor shall cooperate with and assist, however possible the Special Inspector in performing his inspections. The Contractor shall allow the Special Inspector access to the project at all times when work is in progress. The Contractor shall review this plan and coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special Inspector before the work that requires inspection is performed. 5. The Special Inspector shall be responsible to the Owner and Building Department having jurisdiction for the project. 6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections are being performed by his on -site representative in accordance with the Threshold Plan. 7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor shall immediately maker every effort to rectify said discrepancies or deviations. 8. Upon completion of the structural repairs, a signed and sealed statement by the Special Inspector must be submitted to the building department stating that the portion of the project under his inspection responsibilities and under the Threshold Plan was constructed in substantial conformance with the Contract Documents. 9. This document is in addition to the requirements of the standard building inspections as required by the Florida Building Code and is not meant to specify all inspections required by that Code. M L Engineering, Inc. 2030 37 h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) 2 Special Inspection Plan Bryn Mawr — Building C 5055 N. Al Ft. Pierce, Florida Schedule of Special Inspection Services Scope of work 1. Repair of concrete spalls at walkways. 2. Replace cracked railing posts at common walkways. 3. Repair of deck coating on walkway floors. 4. Repair cracks in top rails at common walkways. 5. Provide expansion joints in top rails at common walkways. Concrete Repairs 1. Verify location and quantity of repairs. 2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps. 3. Verify the use of the correct approved concrete repair products. 4. Observation of concrete placement for repair areas in accordance with the Contract Documents. M L Engineering, Inc. 2030 376' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) 3 Threshold Inspections Special Inspection Plan May 4, 2018 Project: Owner's Representative Structural Engineer of Record Bryn Mawr — Bldg. C 5055 N. AIA Ft. Pierce, Florida 34949 Elliott Merrill Community Management Mr. Gene Ross 835 201 Place Vero Beach, Florida 32960 M L Engineering, Inc 2030 371 Ave Vero Beach, Florida 32960 M L Engineering Inc. 2030 37'" Ave Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection Services applicable to this project as well as the name of the Special Inspector. The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought to the attention of the Building Official and Structural Engineer of Record. The Special Inspector shall submit a final report to the Building Official documenting completion of all Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out quality control inspections and testing. Job site safety means and methods are solely the responsibility of the Contractor. `Michael A. Lue; P.E: Florida P.E. No. 47520 Special Inspector No.1061 M L Engineering, Inc. 2030 37 h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) Special Inspection Plan Bryn Mawr — Building C 5055 N. Al A Ft. Pierce, Florida 34949 General Notes 1. The purpose of this special Inspection as required by the FBC, is to report and record the repair procedures highlighting those that are not in compliance with the Contract Documents. 2. The Special Inspector shall meet the requirements of the Board of Building Codes and Standards. The special inspector shall be qualified as a building inspector under Part XII of Chapter 468, Florida Statutes, or certified as a special inspector under Chapter 471 or 481, Florida Statues 3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to provide other services or work, such as material or concrete testing on the same project. 4. The Contractor shall cooperate with and assist, however possible the Special Inspector in performing his inspections. The Contractor shall allow the Special Inspector access to the project at all times when work is in progress. The Contractor shall review this plan and coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special Inspector before the work that requires inspection is performed. 5. The Special Inspector shall be responsible to the Owner and Building Department having jurisdiction for the project. 6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections are being performed by his on -site representative in accordance with the Threshold Plan. 7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor shall immediately maker every effort to rectify said discrepancies or deviations. 8. Upon completion of the structural repairs, a signed and sealed statement by the Special Inspector must be submitted to the building department stating that the portion of the project under his inspection responsibilities and under the Threshold Plan was constructed in substantial conformance with the Contract Documents. 9. This document is in addition to the requirements of the standard building inspections as required by the Florida Building Code and is not meant to specify all inspections required by that Code. M L Engineering, Inc. 2030 37 h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) 2 Special Inspection Plan Bryn Mawr— Building C 5055 N. Al A Ft. Pierce, Florida Schedule of Special Inspection Services Scope of work 1. Repair of concrete spalls at walkways. 2. Replace cracked railing posts at common walkways. 3. Repair of deck coating on walkway floors. 4. Repair cracks in top rails at common walkways. 5. Provide expansion joints in top rails at common walkways. Concrete Repairs 1. Verify location and quantity of repairs. 2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps. 3. Verify the use of the correct approved concrete repair products. 4. Observation of concrete placement for repair areas in accordance with the Contract Documents. M L Engineering, Inc. 2030 37u' Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F) 3 'd -' — ►' M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37`h Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www. mlenaineeringinc. com Project No. 18-124 C Client: Building Official: Contractor: File Report No. 3 Mr. Gene Ross — Elliott Merrill Mr. Carl Peterson, SLC Bldg. Dept. Mr. Chris Arias, Daniello & Assoc. THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS — 2018 — BLDG C 5055 NORTH HWY. AIA, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 1806-0269 PROJECT NAME: Bryn Mawr Condos 2018 — Bldg C DATE: September 26, 2018 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Associates PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Final OBSERVATIONS: All decifiencies from previous report has been corrected. A final certification letter will follow this report. ,,I\n a n4••,• FLOF;e'� �FSSIUNP� M'� all {.14 titees.�. ;- •p. OCT — 5 OECD JD Page 1 of 1 r. r M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37'n Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Far: (772)569-4041 www. mien a ineerineinc,eom Project No. 18-124 C Client: Building Official: Contractor: File Report No. 3 Mr. Gene Ross —Elliott Merrill Mr. Carl Peterson, SLC Bldg. Dept. Mr. Chris Arias, Daniello & Assoc. THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS — 2018 — BLDG C 5055 NORTH HWY. AIA, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 1806-0269 PROJECT NAME: Bryn Mawr Condos 2018 — Bldg C DATE: September 26, 2018 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Associates PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Final OBSERVATIONS: All decifiencies from previous report has been corrected. A final certification letter will follow this report. •••••nnn880�, R� 0R\'F Page 1 of 1 M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37"Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 5694041 www.mlenRineerinainc.com Project No. 18-124 C Client: Building Official: Contractor: File Report No. 2 Mr. Gene Ross — Elliott Merrill Mr. Carl Peterson, SLC Bldg. Dept. Mr. Chris Arias, Daniello & Assoc. THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS — 2018 — BLDG C 5055 NORTH HWY. AIA, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 1806-0269 PROJECT NAME: Bryn Mawr Condos 2018 —Bldg C DATE: September 6, 2018 CLIENT: Elliott Merrill Community Mgt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Daniello & Associates PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunnv WORK INSPECTED: Final walkthrough OBSERVATIONS: We performed a final walk through of all repaired areas. All surface spalls included in repair documents have been completed and decorative topping applied to match surrounding areas. The walkway railing posts have been replaced and painted to match. Cracks in walkway rails have been repaired and new expansion joints placed. 1. Debris along the landscape at the west elevation needs to be cleaned up. 2. Walkway topping needs to be painted to match surrounding areas at the replaced posts. HONy�!., E 15211 FL.OFL: Page 1 of 1 't—, .6 1 M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mleneineerinoinacom PROJECT NAME: CLIENT: CONTRACTOR: Project No. 18-124 C Client: Building Official: Contractor: File Report No. 1 Mr. Gene Ross — Elliott Merrill Mr. Cart Peterson, SLC Bldg. Dept. Mr. Chris Arias, Danielle, & Assoc. THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS — 2018 — BLDG C 5055 NORTH HWY. AIA, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 1806-0269 Bryn Mawr Condos 2018 — Bldg C Elliott Merrill Community Mgt. Danielle & Associates DATE: July 12, 2018 LOCATION: Ft. Pierce, Florida PROJECT MGR: Chris Arias INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Surface spalls @ common walkways. OBSERVATIONS: Demolition has been completed and all loose concrete has been removed at the surface spalls located at the following areas: • - Unit 204 — Concrete spall approx 1.5 square feet • Unit 506 — Concrete spall approx 6 square feet. Top reinforcing bars require wire ties to hold steel down off top of slab. • Unit 606 — Concrete spall approx 4 square feet. During demo a conduit pvc pipe was chipped. Electrical wire was not damaged but pvc requires repair prior to pour. • Unit 705 — Concrete spall approx 6.5 square feet. During demo a conduit pvc pipe was chipped. Electrical wire was not damaged but pvc requires repair prior to pour. All reinforcing bars have some surface corrosion and require power tool cleaning and coating with an approved corrosion inhibitor. Reinforcing is in accordance with design documents and is approved for concrete pour. Concrete pour is scheduled for Friday July 13" @ 1 lam. SE •0..lp • 20 Page 1 of 2 M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 3r Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 w "v.mlenaineerinainc.com Project No. 18-124 C Client: Building Official: Contractor: File Report No. 1 Mr. Gene Ross — Elliott Merrill Mr. Carl Peterson, SLC Bldg. Dept. Mr. Chris Arias, Daniello & Assoc. Pic 1 Unit 204: Surface spall, light corrosion on bars. Pic 2 Unit 606: Conduit sleeve requires repair. Pic 2 Unit 705: Conduit sleeve requires repair. Page 2 of 2