- { �PprmiCCost nodm of cnmmencemenGbuilding permit 110C termination and lK.
,` 1 evariesand`ran norbe determined uottl after a8 papenvork'.is filed
2 is cifneet ail wendnw:reatments�t)1"s
3 'Discandect,ail a{ipliances(s ishwasher hurxbsmve nucmwave fridge? Ott,
4�Relnovpcpih�iq��hyasfarhdckaswecan` 3
' S • Rdmove existng kitchen counter tpp and cabinetry
tCblp`out6le flooring fn entry and Mtchen ,
T Chip. out the balcony the Ca $1 50 per sgft for removal _
LL9
10
11
12
13
14
15
16
Contract
May 3.2018
#001-R
�.s t,ABOR�7' i�YATCRIAL �;.ij
11 doors stay in cundo(to bo.sanded and, painted)
emove Kitchen ceiling panels
iscunnect and remove kitchen ceiling lights _
afseceiling in kitchen- requires sprinklers to be moved
emnve drvwallin entire kitchen and kallwav wail
It electrical plugs and switches in kitchen d • `
cellin
then
herxp'+da+rl Sav
i entire rotdo -
-.v-.. ... r. .-_ --------- _._
t toiletsi;pps; -
'.
y
anity existingmu Mrs
hAwcr door-17i,go5,__,
te'r top and cahInk ry
>:•kop Ord cabinetry
3 � w
chip out master bathroom ma,n floor
.21 Chip nut and remove guest main floor } '
' 25 Remoseshower in guest '
26 (Scrape all ceilings and remove popcarn
vt i Remove ail above material and dispose atdurnp -
" 28 ; Remove doorway in master- to be moved
29 iPurcha a all required rebuild material : h ` $7,000.00
J-Refname kitchen ceiling .
31 IReframecenleincolumn
t
,
' 32 iReframekitchenwalls., • '- ` -
33 lRetmme doorway to masterbedrnom
i 1 i ,f.00
o affit in r, Awk
Coriiract Wand Kitchen and Bath
j35 1lnstall new duct work In kitchen ceiling soffit.
36 Check allpiping
{ 37 netall new drywall qn all new named walls and ceiling (kitchen) ; _ -'?j—
' 36 ;Install new'6 nmShield in guestbathrooms •� a
39 Mudand finish all tirywall
40 and guestanilmaster badtroam,andhvingroona ceilings "
41 jApply knockdown ceilings texture to sanded ceiling' i $2,000.0
42 iPrime all new walls and ceilings
{ 43 iInstall new 5 1/4" base mold Ing throughout entire condo approximately 2701,R $600.0
44 install news 1/47_ crown molding throughout entire condo approximately 220Lfi '1 $500.0
4S Install pocket door for master closet i i * $550.0
<. - — ...
L 46 +Install three (3) PVC BI fold doors @ $150 each ri $450 0
� }hddihonafontry hallwayhmghtmcrease relocahon ofheatsensor, modificanonJrelocation of :. ,
47 A/C duct b] 270.0
__.
} lookup waterline and hook up fridge _ $ •f
( 9x Install mlcrowave dishwasher, oven
Install fansm living room and bedrooms - " I(}f.._ ,
50 Homeowner to have fans on site ready to be installed
Install soundproof through condo' approximately 1270sgft @ $7 70 per sgft T(le� $2,159.0
Install condo,"floor approx.,ihUOsgh oftile®$370 pecsgft (Y04b waste) '-
-Matenaf Pro Flooring m Taurus Beige Polished- 912500390. 24x24 _0$375 persgJL-
-Layout stmight '
-Grout Color-TEC-Parchment #991 .$5_,250.c
Install balconytile approx. 131sgh(114+ 10% waste) @$550 persgft forinstall
- -Material - PruFtooring- Taurus Matte Beige 100129279-12x24 CO) $3.65 pars*
Layout -Herringbone
-Grout Color, TEC-'Parchment-#991 Tile;. $470.0
nsta n-- s i qq does not mclude to c'olu'mn'3"s �< 5 -r ,fi i
.. _
�r,�,�`�
Ias�Sill�m eras -w' r 9pPcnYs li0s�tla�x4z i d _,n_�t4.� r s L��'+ i �.�
-'MaterftilP aFltibKng Taurus X¢ige fished 912500389o2x2.-$375persotb-^ .
y 4. -
utEalar TES,, PgrchlnG'iir #991'«.**. Y �?+.s+ a Y,,2 t*'?� $3r5.S
Installwainscot• approx; 2_sq .' w. -- `
• Material,- Praflooriag -Taurus Beige -Polished; 912500389 -12x24 @ aU75 per sqA,
-� -Layouts-Subway vertical ." - - . -
Grout Color, ;TEC Parchmant .=#991 Tdej $150.(
nsta-11 master listello approxr22LA -
- Material - IWT - Tesoro - GlassStone-Stainless- Woodland Park Linear Blend
-Layout-UsteBo' - - ( •i
a Grout Color ,TEC Parchment #991 ' _ • Tile$ $215.(
__ .. .., _ .._...
Install + - �
i _IAcaatr5n',- 'i) op site'dur;ng the walk ttiratigh Tile $250.1
i` -Location-Opposite of the showercontrols
• Material - Daltdo -Emperadar Light- A1712 - 4x4
-Layout -Straight
- Grout Color -TEC- Parchment.- #991
i InsmhgttesesFiower wall tileapprax. 100'sq['t-
Material =ProFlooring -Taurus Be* Polished- 912500389.12x24 @$3.75 pensq i
• Layout -.Subway vertical
--Grout Color- TEC • Parchment- pQ91' , r
- _�_ _ ....._.__
Ins`tall7gue`stIist`ello approx:.�i°R t.
- Moterial -1WT -Tesoro • Glassdtone-Stainless-. Woodland Park Linear Blend
-Layout Listallo
-Grout Cotar-TEC Parchment #991,
Contract ` Island Kitchen and Bath
$375.00'
$215.00'
pg. 2
lnstall est. shower wet floor�a
gu pProw
Elm - Material. Dpttlfe - Emperador Light.• M712.4x4
•-Layout-Straight
- Grout Color -TEC- Parchment - #991
-
Material - Wellborn Select Series- Proue Maple Fu110verlay in Dr - Soft -close features -Classic
drawer fronts
• Cabinet pricing is based an the initial cabinet drawings once the walls are. opened up new
66 renderings will be produced and the prices will be updated
Install kitchen cabinetry fiardwaro <
67 Material- Hardware Resources- Elements Pull. 176SN:-43pca
--' '--- ..:a.._'-•.- ,.__... _.,�. ,. _..............: ._... _..ter...;-" ....._........_
"build custom doois for AJC closet
- Material -To match kitchen cabinetry
68 ' Project Manager is to confirm what material needs to be ordered'
"installlnasteFcaTimetry`
-Material - Wellborn Select Series -:Prairie Maple Full Overlay to Drift..• Soft -close features- Classic
idrowerfronts.
i.' Cabinet pricing is based an the Initial cabinet drawings any changes made may affect the: pricing
69 of the cabinets.
_.r_-_
ilnstellrn ter cabinetry hardware
70 a:- Material - Hardware Resources -Royce -Sonoma Knobs -431SN
71 ,tbP-,
nsta guestcabinetry ----=�-u•:- __.�...,..k__�.;:
Material- Wellborn SelectSertes - Prairie Maple Full Overlay In. Drffi-Soft-close features -Classic:
rq�fCrinthe
awerfronts.netpricing is based on the initial cabinet drawings,any changes made may affect the pricing
72 cabinets:
'�Firaterla 3.. ?'tw.e..�13G1aCi731g7CY � i'.° -,: ;
Install countertop in kitchen -pass-through. overhang 10" w/radius) - desk area w/4"-back/side.
>plashes- master and guest bathrooms w/4" back/side-splashes @.$33 per.sgft, for fabrication
3ne (1) kitchen sink cutout @ $150 - two (2) vanity sink cutouts.@ $125 each
Material- New Venetian Gold Granite-Three(3)slabs
• EDGE. ,1/4 bevel
• Homeowner wants to see where the seams oreguing to be
- Moen
9000
citysink quantftyone (1).
I) undermount rectangle in White '
city faucet -quantity one{1) ""` "-' - —'— ""- —''--
90 degree widespread faucet In brushed Nickel - TS6720 - requires. an,Mpact valve
,e�a.(33}�way sbowei v_dAve
shower rough three f3) way shower valve- 3330
rpm s+te ud�r: g;th w tk�rhinngh'f
, pan with slope kit In master
iwcr controllertrim
Klnaskw Moemtrol valve trim In Bruslu d Nickel -T411 ]RN
rflet $zso:
•j
$2,835.00_I
$75.00
Plum
Plum
singlefunction hand-held w/siidebor in Brushed Nickel -3868EPBIV-requiresa
BN I
Contract
Island Kitchen and Bath- pg, 3
oL-k
Material- Aftten P-single function Ralnshower in Brushed Nlckel..S6310BN .requires a shower arm
K-7396-BN Plum; $260,00I
..— _I
nstall Master Toilet - -
Material Kohler Nighline comfort height elongated bowl in white K-368500 with standardsoft-�
lose lid K-4636•00 lll� Plum! $36500;
in
MaE�BsLiaen sh)warough
se etrli �w�3)waysBryshed Nickel `SG700BN ..�, plum—`$53500y
Material Moan shower rnv hthree w shower valve•4330 3
Plum $215.001
istail new shower pan with slope kit In guest j Plural I
ictiall guestshower controller trim-
Material Moen Kingsley Moentrol valve trim in Brushed Nickel T4111BN Plum $170 00•
wstailguestshdebarwit"fi�dwatid'�"`�_ ,
Material - Moen single function handheld w/shdebarin Brushed Nickel • 386REPBIV requires a
rop elbow -:A72SBN { 1
Location- Opposite shower controls J Plum' $310.001
tstall guest Ra(nhead — -- (-��-'----�-?
Material -Moen P-single function RainshowerinBnuhed Nickel - S6310BN requires a shower arm
K•7396-8N Plum) ._._ $260.00�
Material
al--KohlerOigidine comfort height elongated bowl in white K368500- with standard soft.lose Plumi _. $36500
nstall new wiring switches and plugs on cement column ( Elect!
nstall eight (8) LED recessed lights throughout kitchen @ $125 each j Elett1 $1,000.00�
nstall ° **,.(pj e9^.., 1 tigh t the hose sofnt in mi ter bedro fa15714 h G3e.---------a56.ee•
nstall two (2) LED recessed lights within master shower area @ $125 each Elect $250 0011
..�..—_....__. ......... ......__.. ,,..._..... ,__ _. . __.,.___..,.._.___......,.._,._....._.v ___ _��,.,._ __ _ .
nstall three (3) LED recessed lights above mastervanity.@ $125 each Elect; $375.00
nstall exhaust fan in master _ _ Elect; $225.00,i
nstall two (21 LED recessed lights within guest shower area @ $125 each Elect,. $250,00',
oughoutentlre condo Elect $75000
Elect! __..._� $450.00
..a._.....).- . _ _..-.—....— _._....._._.._._. I ___..,--- .. .
"-ilnstall master frameless shower doors(matenaL fabrication, installationI
-Material-Clearglass - One (I) fixed panel and one (1) swing panel with Brushed Nickel hardware
107 to match, the piumbingflxtures $1,350.001
Install guest frameless shower doors (material fabrication, insmllatlon) � �
Material- Clearglass Otte (I) fixed ponel and one (1) swing panel with Brushed Nickel hardware
100 to match thepiambmgfutures $1,350.00�
109 I Pricing on master closet level 2 adjustable (2 rows all the way around) $850 00'.
nstail tanklesswater heater ' $1200.001
112 IKB 11ile
Labor(•) } $14,500001labor (Tile)
iving space $4,699„ Balcony$627 Master both $I 975 Guest both $1,656 Backsplash $450 $10 171 00
1141Drywall $2,920 00
.lambing e - $3,900001
�4"76 )�Iectrlcal � $4,z0o ao
117 Painter $2,200 00'1
118 Construction cleanup __ $200 00
Contract Island Kitchen and Bath pg. 4
TOTAL LABOR / MATERIAL ALLOWAI
GRAND PROJECT ALLOWAI
Deposits required: Counter -top deposit: $2,393 - Project Deposit $42,722 -
Draw payment due upon completion -of 'drywall: $30,575
Draw payment due upon completion of tile: $15,290
Draw payment due once counters are,templated: $14,790
Final payment due: remaining balance
Total Deposit: $45,115
� I o-i'q�oz
Commencement
Completion:
PAYMENT TERMS AND CONDITIONS
1.)-Deposit of counter -top material & cabinetry paid in full plus 25%of the project A deposit check; payable to Island Kitchen and Bath, Is
required'fer a project to be scheduled. Credit Cards areNOT accepted. Deposit checks will not -be cashed until the project is about to commence.
2.). Draws will be collected as needed to complete. the. project. If the client refuses to pay draw, theproject will be halted until payment is
collected.
3.) Full payment of open balance within 3 days of completion of the project
TERMS AND CONDITIONS
—The prices represented are based on project and product average costs. Prices may vary once projectand product measurements, details, and
selections are made by client
- ISLAND KITCHI�N.AND BATH will executeail work according to the Florida Building Code and is licensed htthe state of Florida and Is In good
standing..Timespent by the owners on the project is not ;abillable item.. All. work will beaccerdance with the scope of work 'detailed within the
contract.
— Due to unforeseeable conditions inside walls, behind cabinets, etc..; additional cost mayoccur during construction for Issues such as mold,
and existing plumbing/ electrical not being safe or mde compliant These additional costs are.NOT included in any contract pricing and will be
dealt with as needed. This contract does NOT account for product defects or productbadkorder. These issues may affect the. project Umeline
and will be dealt with as needed.
— Any changes requested by the client, after the original contract is signed, will result in a. change. order. Change orders will affect the project
timeline and are anadditional cost to the original contract pricing. A change. order will result Ina separate fee of $100 per change order, in
addition So the,cotai cost of the Change.Order. Change Orders must be signed, and paid immediately and separately from theoriginal contract
pricing.
— All selections must be made at[he time of the contract, unless otherwise stated, such as; To Be Decided (TBD) or Supplied by Owner (SBO). If
there is not a selection stated, TBD, or SBO then we cannot promise the price written within the contract
—.Itis the clients responsibility to provide all additional information that maybe needed for the project, Such as, appliance specifications, all
SDO material, etc.. If any incorrect information, is provided by the client, island Kitchen and Bath is NOT responsible for any additional cost or
time that may occur from this error.
THANK YOU FOR YOUR BUSINESSI
Client Signature IKB Signature
Date Date
Contract Island Kitchen and Bath pg. 5
I
maxK mu 1 0 — R
Date
64 1 m
IQC d- PL
-64 'kcb?-Ic4
Wand Xtichen and)3sth, 'p&