Loading...
HomeMy WebLinkAboutMISCSCANNED BY St. Lucie County Contract Full Condo Renovation June 5, 2018 James Crockett #001 561-307-9896 - jacrockett3@comcasLnet 8880 S. Ocean Drive, #1002, Jensen Beach, FL 34957 Proiect #t 18149- Island Dunes I -1002 - Crockett 2 j Purchase all general rebuild material "I $.1,250.00', 3 1 Chip out kitchen and entry way the flooring $1,250.00; — tlnspett all exposed plumbing/electrical within the walls - Due to updated building codes, if your ._ _..___._.. .. ..... _,, � unit is not updated/current to code, IKB is required to bring it up to code - These costs are to be covered 4overed by the homeowner. 5 Remove all of the above material and dispose at the dump • 1 6 Reframe master bath and closet area $800.001 $200.00 7 Rey frame the kitchen walls and ceiling to the highest point 1 8 I Install duct work in the kitchen ceiling soffit i 9 Install DensShield in master bathroom shower 10 Install DensShield in guest bathroom shower •i 11 Mud finish and prime all walls and ceilings •i ;Install underlayment throughout the entire condo - approx 1,OOOsgft CO) $2.00 per sgfL Tile $2,000.00 _ _ rinstalimainFloorthroughouttheentirecondo-approx1,100sq 1,OOOsgR+lll%waste —� _ _..._._ � j- Material - Lotus - Memory Blanco -6x40-PWSV-04012@$3.90 per sgft 1 -Layout- Staggered I _Grout Color -TEC- Sterling -#909 Tilel $4,290.00 Install master shower wall tie-approx.90s --_ _ — -------�--------- - Material - Daltite - Fabrique - Crdme Linen -12x?4 - P686 @ $2.80 per sgfL i j-Layout-Subway ' -Grout Color -TEC- Birch -903 Tile�$252.00 _ Install bullnose-approx l6Lft - i -Material-Schluter- Brushed nickel to match the plumbingfixtures Tile, $195.00 Install master baseboard -approx 18Lft ---------- Tile; $144.00 Install master niche -- -1 —- �. !- Location - Above the shower controls ffwalls allow _ _ Tile], $80.00 1 ;Install master corner seat ; '- Location - Below the slidebor ----'-- Tilei $250.01 ---------L--_... Install master shower wet Floor -approx 20sq�t .--- j Material - Daltile- Artic Gray Basket Weave -L757 j -Layout-Straight i -Grout Color -TEC- Birch -903_ Tile $300.0( —__ --_ Install master threshold - Match the tile _ _ -- _ Tile! $80.01 i ` Install wainscot behma theguesttoilet- approx 25sgR i Material- Daltile- Fabrique -Crdme Linen -12x24-P686@$2.80 per sgft j Layout -Subway -Grout Color -TEC- Birch -903 dv Initials - Island Kitchen and Bath pg.1 1 1111114 a Install kitchen & desk cabinetry Material - Wellborn Premier Series - Bishop Full Overlay In Glacier - Soft-closefeatures -Classic druiverfrimt, - DU waste basket - Drip troy- Spice rack pullout - Utensil drawer -Cutlery divider 1 Note' Cablneay pricing is based on the original 2020design, once measurements are confirmed 23 !. the cabinetry drawing will be updated as well as the pricing (+/-) $1,350.00 $18,305.00 I Install kitchen & desk cabinetry hardware 24 -Material- Hardware Resources- Merrick- 548-126SN -43pcs $430.00 ­141nmastercabinetry stal Material- Wellborn PremierSeries -Bishop Full Overlay in Glacier- Soft-closefeatures - Classic Idrowerfronts. 1 -Note - Cabinetrypricing is based on the original 2020 design, once measurements are confirmed 25 I the cabinetry drawing will be updated as well as the pricing (+/-) - $3,910.00 Install master cabinetry hardware 26 -Material- Hardware Resources - Merrick - 548-128SN - 13pcs $75.00 L $130.00 7� 12. " Insta s cabinetry -Material- Wellborn Premier Series- Bishop Full Overlay in Glacier- Soft-closefeatures- Classic I •drawerfronts -NI Cabinet?y pricing is based on the original 2020 design, once measurements are confirmed 28 the cabinetry drawing will be updated as well as the pricing (+/-) $1,945.00 Install guest cabinetry hardware 29 Material - Hardware Resources - Merrick - 548-128SN - Spa • $50.0c Install new counter -tops in the l•utchen and aeSK area wl 12 over nandatthepenimulaanil4a backsplash in the desk area - master and guest bathrooms w/4" back/side splashes CM 33 per sqft. for fabrication - one (1) kitchen sink cutout is) $150 and three vanity sink cutouts - two (2) in the .master and one 11) in the guest 9 $125 each - Material - Emerstone - Lame 3cm - Three (3) slabs - Edge - Eased p �() 14,485._00t $3,885.0( Install kitchen sink 42 - Material - Chef-Z105-30 single bowl undemountstainless sink Install kitchen faucet Plum $375.0( 33 - Material - Moen Etch one -handle high am pulldown in brushed nickel - S72608SRS Plural $545.01 Install kitchen disposal with push-button to the left of the faucet Material - Disposal - 73134A - Push-button - STS-SO Install master vanity sinks - two (2) Plumes___$225.01 quantity 5 -Material-Two(2) undemount rectangles in white Plum' $250.01 Sig 64 Install master vanity faucets - quantity two (2) -Material -Two (2) Moen Voss widespreadfaucets in brushed nickel - T6905BN -requiretwo (2) ! 1 mpact valves - 9000 Plurni $860.0 Install master shower pan with slope kit Material - Moen Posi-temp valve - 2520 - Moen diverter valve - 3370 Plural $2.50.0 Install master shower valve and deserter valve trim Material - Moen Voss Posi-temp, valve trim in Brushed Nickel - 72691 BN - Moen Voss diverter trim m Brushed Nickel - T4612BN PlInr $275.0 Install master slidebar with handshower Material - Moen singlefunction handshower w1slidebor in Brushed Nickel - 3668EPBN - requires a dmpelbow-A7ZSBN Plum $310.0 'N P? Install master rainhead -Material-Moen Waterhillsinglefunction 10"Rainshowerin Brushed Nickel - S122EPBN - requires a shower am - K-7396-BN Plum $480.10�43 � a Install guest vanity sink - quanbty one (i] , � -Material -One (i) undermountrectangle_n white __ _ Plum.— $125d Initials - — — Island Kitchen and Bath pg. 2 �lInstall ,���$973�b2:flq,� guest vanity faucet - quantity one (1) —T-- — - Material -One (1) Moen Voss widespread faucet in Brushed Nickel - T6905BN- requires an Mpact . :44 valve -9000 Plumy $430.00' $ IM 46 Install level-1 shelving in the master closets $1,900.00 I__47 Install 5 1/4" base molding throughout the entire condo - approx. 200Lft •1 $600.00'i j48 Install 20OLft of crown throughout the condo $1800 OO � Instelfk7tc en appliances Homeowner is responsible forsupplying the showroom with copies of the new appliance specs 50 iprior to cabinetry being ordered - Install ten [16) LED recessed lights throughout the kitchen @ $125 each -three (3) above the sink - one (1) in the front hall and sic (6) throughout kitchen Elect $1,250,00 Install five (5) LED recessed lights in master -two (2) above the vanity, one (1) above the toilet -- -- 1 Iland two (2) in the shower - @ $125 each Elect $625.00 1 ' Install new whisper quiet exhaust fan in the master bathroom Electi $225.00: r Install three (3) LED recessed lights inthe guestbathraom-two 2 over thevanl andone 1 O O —---- -" 'tyr over the toilet Elect $375.00 Install new whisper quiet exhaust fan in the guest bathroom Elect $225.00i Install new outlets ad switches throughout the condo - Decora White Elect $750.00i Install frameless shower door to the master bath — —� _ 5 -- IMaterial - Clear Gloss -One (1) swing panel and one (1) fixed panel with Brushed Nickel hardware 57 to match the plumbingfixtures Glass $1,350.00' 59 IK=(-) $12,500.00 -._7 il__0-Mastershower wall$1,750- Guestshower wall$1,650-Backsplash$440 $8,090.00 61 Kn"- $1,900.00 -' lumbing labor allowance(Plum) $3,900.00 lectrical labor allowance (Elect) $3,900.00 ... a i4~r'r''�r ,. 4,+d,o Drywall 1 _65 _ $490000 66 (Construction clean up $250.00 67 TOTAL LABOR / MATERIAL ALLOWANCE 5 ¢7SOQ ,a $5,887.b0`*i GRAND PROTECT ALLOWANCE # iv e ; 1 Deposits Paid: $28,500 Draw #1 due once drywall is hung: $34,435 Draw #2 due once tile is installed: $17,215 Draw #3 due once counter is templated: $15,715 Final Payment due upon completion: Remaining balance Commencement: Completion: November 1, 2018 PAYMENT TERMS AND CONDITIONS 1.) Deposit of countertop material and cabinetry paid in full plus 25% of the project A deposit check payable to Island Kitchen and Bath, is required fora project to be scheduled. Credit Cards are NOT accepted. Deposit checks will not be cashed until the project is about to commence. 2.) Draws will be collected as needed to complete the project If the client refuses to pay a draw, the project will be halted until payment is collected. 3.) Full payment of open balance within 3 days of completion of the project FILE COPY Initials - Island Kitchen and Bath pg. 3 TERMS AND CONDITIONS —The prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and selections are made by client — ISLAND KITCHEN AND BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good standing. Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the contact — Due to unforeseeable conditions inside walls, behind cabinets, etc.., additional cost may occur during construction for issues such as mold, and existing plumbing/ electrical not being safe or code compliant These additional costs are NOT included in any contact pricing and will be dealt with as needed. This contact does NOT account for product defects or product backorder. These issues may affect the project timeline and will be dealt with as needed. — Any changes requested by the client, after the original contact is signed, will result in a change order. Change orders will affect the project timeline and are an additional cost to the original contract pricing. A change order will result in a separate fee of $100 per change order, in addition to the total cost of the Change Order. Change Orders must be signed, and paid immediately and separately from the original contract pricing. — All selections most be made at the time of the contract, unless otherwise stated, such as, To Be Decided (TBD) or Supplied by Owner (SBO). If there is not a selection stated, TBD, or SBO then we cannot promise the price written within the contact -- It is the client's responsibility to provide all additional information that may be needed for the project Such as, appliance specifications, all SBO material, etc_ If any incorrect information is provided by the client, Island Kitchen and Bath is NOT responsible for any additional cost or time that may occur from this error. — Insurance Agent: 4 Corners Insdrance-Stuart-- cense Holder: Justin Thiery---- License Number: CBC 1259508 ThANK YOU FOR YOUR BUSINFSSI Signature B Sjgnat Date �— Initials Island Kitchen and Bath pg. 4