Contract
Full Condo Renovations May 16, 2018
Celesta &lames Cullen #001
954-937-9759 - jcullen288@gmail.corn - celc39@aol.com
8860 S. Ocean Drive„ #205, Jensen Beach, Fl, 34957
an not be determined until after all paperwork is. tiled
12ill
t general rebuild material
3 $2,560.00
any remaining window treatments throughout condo and dispose
dersin kitchen and master bath area
'I $3,000.0W
all kitchen appliances refrigerator, dishwasher, range, microwave, etll 0x
eris responsible for supplying :the lK8 showroom with copies of the: new appliancespec's
cabinetry being ordered*
was]reianddi' e> •,°�';,••+.._., _„,.--�._- ._,�_--T-
ter &responsiblefarwpp(ying. the lif$showroom with copies of the new appliance spec,'s
f
existing kitchen ceshngs lightsp
-
earn
'1
all electrical plugsjswitchos'throughout condo
A bedroom/living room ceillngs fan •o ' M
master bathroom faucetand sins
-
masterbathroomtoile p„ e
_
guest bathroom lancet and sinlsp40'spa•
inn height in master
kitchen ce_lin
kitchen walls
28 p7tidsstTieFri
Initials -
untertop and cabinetry Mat
afire condo - Door casing is staying z `�
valland soffit framing {rf applicable depending on sprinklers)
kitchen area drywall
flooring
shower doors i?jgpF *� : ____ 3
lower doorsist � "r ''
randexistingtub i
index tmgshower I *�
RECEIVED
Island Kitchen and Bath JUL 2 0 2018 Pg. 1
ST. Lucie County, Permitting,
t
29 Remove existing master
30 Remove all above motet
f Inspect all exposed Thin
unit is not updated/curt
31 covered by the homeown
32 Reframe kitchen wall to
33 jneframe kitchen walls a
l dispose at dump
electrical within the walls - Due to uupdated building codes, ifyour � � --
code, IKB is required to bring it up to code - These costs are to be
er height - 341/2
34 1 Replace drywall whereexisting: mirrors were
35 !Install soffit into front room. for A/C
36 1 Install duct work in kitchen ceding soffit
37 1Lt ower Acvents in the livingand dining room
38 Install DensShield in master bathroom shower
439 Install DensShield in guest bathroom shower
( 40 !Mud finish and prime all walls and ceilings
41 itnsta1151/4"base moldingthroughout entire condo approx.270Lft.
.._ .�-...._-_._ _ .....
42 Install 51/4"-crown molding throughout entire condo approx 220Lf
43lnstall one..(1) Louver door for AC closet
44 Install four (4) Louver bi-fold throughout entire condo @ $185 each
r.r_�__, T . ,._ _.._ ,.,
t install four (4) pocket doors - one (1) lathe master suite and one (1) in the guest suite @ $250
.,each one (1) complete pocket door into master bath (to have a mirror facing out - mirror priced
45 �separately) and one (1) for the master closet $550 (two panel doom)
,.� ..__..,___.,. -_ .____.—.-___j_,._ _.._ .t _.... _. _____n—e (f __ _ _ _.. _ �_
Install three (3) 2 panel doors. -one (1) (or the guest bathroom, one (1) for the hack room and
l 46 one f l) for the den @ $235 each
$1,200.00':.
$350,00
*'
$740.00.
�
*i
I
$1,600100�
$705.00
P
•lnsitill eelgngfans In bedrooihs/living room'-
.Material-Supphed by the homeowner -foat(4)aQne.(1) in the masterone(I)ln,the back
edroom,one:[1)intheguestbedroomandone(1)GrUiehwagroom i ..
.'
_. ,E
'Bomeowne�will have cellingfans shipped w the lKBshowirom acopy ofthe' specs are to be .-
_
•�
• providedititheshowroom as well
48 Nook up waterline and hook. up fridge v i
«`
i Install all kitchenapplianres refrigerator, dishwasheq range, microwave, etc
49 *Appliance spec''s have been provided to the Project Manager"
*'
Tile!
�
$2 000.00
Install underlayment throughout entire condo - approx 1600 stilt. $175 per"sgft
e
,
8_..._ ..
...._ _ _... _
1nsU11-main floor Throughout entire condo approx. 176Osgk. (1600sgft+l0%waste)
�
;
- Material -Lotus - Memory Bianco - 6x40 - PMV 04012 @ $3.90 persgft 1.
-Layout-.Staggered
Tile
$6,864.00
-Grout Color -Custom Building - Urban -#172 -
-
'
_Putty
Install masters oil-wer wall a roxi ifb s R mdudes l0o{o waste Toindude to front of
benchseat
• Material - Doldle -Rialto Bianco - 24x24 - RI $3.50 persgft t
-Layout - Straight
.
Tile!
$385.001
�- Grout Color• Custom Building Snow White fill _ _ _ v
Install master bulinose/schiumr
$180.00�
Material •Schluter in Brushed Nickel to: match the plumbiogfatures
Tile;
innstall master decorative tiie ,i
-Macertal-Daltlle-Cascading Waters -Shimmer Shore-CW4014MSIP
j
I•Layout-Listella band 114 way downfram the ceiling -glass tiles to ran vertical
Tile,
$220.001
Insmll master baseboard approx 1HLfc
i
- b{atermt - ff a pr¢mada baseboard is not offered we will fabricate out of the floor tile. ,-`
Tile _.
$63.00i.
InstaltrasteCf-,niche
S
4 cLotyK w Dran site during the walk-through
Tile] -
$80._001
InstalUd'iaz-_:•te`r=rnrneriseat
VL=_ {ioq • Df on -site during the walk-through
Tile l.
$Z50.00,
IiismiI master wetsh6wer-Foorinsliowcrappri .'2D sgft"
• Material - DalUle -Attic Gray - 4x4 tumbled the - L757
•Layout -Straight (
•Grant Colm'-Custom Building -Snow White -#11
Tile!
!
$350.001
In stall master threshold -marble
Tile f
$80.001
Initials - Island Kitchen and Bath pg- 2
9
nsmll goes` s tower wall -tile approx, 90sgftand tvainscotingapprow-90sgft wainscoting
143sgft (includes 10%waste) -
- Material - Daltile -Rialto Blanco - 24x24 - R023 @ $3.50 persqft
-Layout- Straight
Color -Custom Building Snow White #11
$50000J
-Grout
Install guest butinose/schluter
• Material -Schluter in Brushed Nickel to match the plumbing fixtures
Tile $180 001
install guest decorative rile
�)(
-Material- Doitile: Cascading Waters -Shimmer Share -CW4014MS1P I
E !
$220.00!
- Layout - ListeBo bond114 way downfromthe ceiling- glasstiles to ran vertical
Tile
Install guestbaseboard approx Y2Lft
- Material - if a premade baseboard is not offered we. wilifabncate out ofthefloor tile.
Instaticguestnfth .. ...
Tile! $42.00'
�
'= LivaL`+ n ^+TBi on site during the walk-through
Tile $80.00
Install'iAt-M46rner seat) D on -site during_�� the walk•[lirovg
;TYatatt 77tith
Tdel $250.00.
Installguestwet showerfloor inshowerapprox20`sgft.
•Material - Daltile -Attic Gin 4x4 tumbled tile -L757
-Layout- Straight
-Grout Color, Custom Building Snow White #11
Tile $300.00
Install guest threshold marble i
Tiler $80.00
hi t gHDc ilo ePprx.
•...,..
69
70
'tryoac�TBD on'aite betwebn,tbg„�MiuiJ€heham�wner
..
71
Install standard level2 adjustable wood shelving tnlinen closet.
` $1o000-
� �
-`-�instell
-.Notarial-WaRborn Salact. Series-MillbrookSquare Maple Full Overlay in Drift.-Soft•ctose
1
�
features-Class(cdrawerfrants Ohl waste basket -Drip tray Sliverware.drnwer-Cutlery drawer-
j
Uppers in bu/fetdraaflnished Interior-.Prep'dforgtass-glass shelves •.Low praflte crown and undor;
I
cabinet mo/dM,g "Glass pricing on aseparate lineitam*
j
•Nate*Cabinetry prleingis basedon theorigtnaisigned 2020 designs and any changes thatare
d135000t $10,700.001
73
Instal! kitchen ghinetry Hardware
-Material- Hardware Resources Merrick Collection -54912BSN
.-_-._
! $45U.00
ns�W ma5[er cabinetry
- Material - Wellborn Select Series - Millbrook Square Maple Full Overlay In Drift -soft-close
Ventures - Classic drawer fronts
' Note *Cabinetry: pricing is bused on the original signed 2020 designs and any changes made may
j
! ++ $2,900.00�
74
affect the pricing of the cabinets
Install master cabinetry hardware
Hardware Resources Merrick Collection 549128SN
'
$70.001
- 75
-_Material-
....
__.___....__... _
ns`tallgu'es[cinetry
I
Material-Wellborn Select .Series • MilibrookSquare Maple Full Overlay in Drift -:Soft -close
eatures -Classic drawer fronts
'Note* Cabinetry pricing is based on the original signed 2020 designs and any changes made may
76
l
affect the pricing ofthe cabinets
*•, $1,950.00�
~.1lostall
guest tabinetryhardware
!
77
" ^'�lnstalicounter•tops
`- Material • Hardware Resources Merrick Collection -. 549128SN
In kitchen, master andguest bathrooms w/4 hackJside splashes in the
$- -
master and guest bathrooms - Four (4) sink cut-outs ,@ $150each _ One (1) in the kitchen, two (2)
fin the master and one (1) in the guest
1 i
• Material - Fantasy Brown • Three (3)slabs $1019 with tax a stab
78
-Edge: Eased
-Material ChefZ 105
$435000 $3,057.O O
_.
Plum-.... ,$--- ---
10�
Installkitchenfaucetw/soap nser dispetothe
Material _ Moen Arbor single handle pulldown w/MotionSense In Brushed Nickel - 7495ESRSI
L__ $665.00
.,Moen transitional soap dispenser in Brushed Nickel-S3948SRS
,- Plum
____ - -
Initials - Island Kitchen and Bath pg. 3
- Material -Two (2) undermount rectangi
Install master bathroom vanity faumi • q
- Material -Two (2) Moen Eva widesprem
M_pact valves-9000 _
Install master shower pan with slope kit_
Install master shower drain in shower
Install tot''sludw r.valve -
-
-Material - Moen Moentrol valve -3330
to the left of the fauce[ +
SN I Plumi� $22S_00I
I
e Plum $250.00l
in brushed nickel - T642OBN -requires two (2)
-Material-Moen Kingsley Moentrol valve trimin Brushed Nickel-T4111DN
Install tnasterisli, e&ar t and wan _..___..._ __._. _...---._.,_....,..
Material -Moen single function hand -shower w/slldebar in brushed nickel-3868EPBN- requires a
drop elbow -A725BN
to }�+t�.oca4ian ^ Bon sife`durinq ibe il€i#rr7jgj
!n$th ma5ter ralnaeaa
-Material -Moon Immersion single function Rain'shower in blushed nickel - S6310BN-requires o
shower arm - K-7396-BN
Install master bathroom toilet
- Material -Kohler Highline Comfort Height Elongated Bowl in White - K3658-03- with
coardinating sqf lose lid -K4636-0
Install guest vanity quantity one (I)
-Material-One(1) undermount rectangle sink White
Install bathroom vanity faucet quanUry one (1]
Material -One (1) Moen 90 degree single handfe faucet in Brushed Nickel S6700BN
Inamll shower nan with slope kit
Material - Moen Kingsley Moentrol valve trim in Brushed Nickel- T41118N
nstalt ss. alldoba�tvtth�hsa�nd�w,aYn"'
hlatera - penatngeunction hand-showerw/slidebarin brushed nickel -3868EPBN-requiresa
irop elbow -A725BN
nstall guest rainhead
-Material -Moen Immersionsinglefimction Rainshower in brushed nickel - S631OBN - requires,a
;howerarm - K-7396-BN
nstall guest bathroom toilet
- Material - Kohler Highline Comfort Height Elongated Bowl in White - K-3658-00 - with
;oordinatingsoft-close lid. K4636-0
Install washer and dryer -change valve tiox
- Location - In hallway leading Into the master bedroom
switches and plugs throughout condo Down Whiter
It under cabinet lights In kitchen -.White ,.
cabinet
(3) above
and six(6) throughout kitchen
sled helhts In the hallwav leadine to the master bedroom @ $125 each
in the shower -@$125 each
whisper quiet exhaust fan in master bathroom }4
(4) LED recessed Ifghts in guest -one (lJebuve the vanity, o
ie shower - @ $125 each
-__ $150.00;
I
$215.001
_$165_D0iI
1
$260.001
$350,00
$125 00'
-_ $535.001
- - I
..-.._._ ..:.:_$150,001
i
$215.00�
$165.001
Plum; $310.001,
Plumy
$350.001
Plum(
$250.00{
Ylum}
$1,750.001
- --'i
..._.._...,, _--Elect;__._.
_—_-
$950.00
Elect!
$500.001.
I--
Elect,.
F
$600.001
-.._ _
Elect;.
$160.001
Elects
$1,250.00
_ Elect;' _
$350.0011
Elect
$625.00'
E1ecu
D
—,... _._ Clectlt _
,$500.001
Initials -
Island Kitchen and Bath
pg. 4
116
123
127
stall t% 2) LED recessed lights in the guest half @ $125 each
stall three (3) LED recessed: lights In the guest bedroom @ $125 each
stall four (4),panes of clear glassin,the buffet area with glass shelves ____
stall master frameless dear glass shower doorss.Cmatefial fabr'kation; installation) m
Material -One (I) fixed panel and. one (1) swing panel- Brushed Nickel hardware to match the
one (1) fixed panel: and one (1) swing door - Brushe
htures
tYotPw;ouaautn
rp�a
.� 3
s Tof it n" fii in R _
:*R�mnifndhu rT,rTiFaawmweix _. ,- -
labor (Tile)
to space $6,800, Master
allowance
,or wall $1,800, Guest slit
I
wreto match: the
c i P
$225.00'
Glass', $11,450.00
128 !Construction Clean Ilp _ t Wuu.uu,.
TOTAL LABOR / MATERIAL ALLOWANCE $49,800 00 ,I-$70,951 QO-
GRANDPRO]ECTALLOWANCEI $120,75100�,
Deposit: Countertop Deposit: $3,057 - Project Deposit: $47,008 -Total Deposits Due: $50,145
Draw #1 due once drywall'is hung: $35,305
Draw #2 due once file is installed: $17,655
Draw #3 due once counter is templated: $16,155'
Final Payment due upon completion: Remaining balance
Commencement: cn4 Q
Completion:
PAYMENT TERMS AND CONDITIONS
1,) Deposit of countertop material andcabinetrypaid in full plus 250A of the project. A deposit check payable to Island Kitchen and Bath, is
required for a. project to be scheduled. Credit Cards are NOT accepted.Deposit checks will not be cashed until the project Is about to commence,
2.) Draws will be collected as needed to complete the project. If the client refuses to papa draw; the project will be halteduntil payment Is
collected.
3.) Full payment of open balance within 3 days of completion of the project
Initials -
Island Kitchen and Bath
pg. 5
TERMS AND CONDITIONS
— The,prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and
selections are made: by client.
— ISLAND KITCHEN AND BATH will execute all work according to the Florida Building Code and Is licensed in the state of Floridaand is in good
standing. Time spent by the owners on the project is,not a billable. item. All work will be accordance with the scope of work detailed within the
.contract.
— Dueto unforeseeable conditions inside walls, behind cabinets, etc.., additional cost may occur during construction for Issues such as mold, and
existing plumbing/ electrical not being safe or code compliant These additional costs are NOT included In any contract pricing and will be dealt
with 'asneeded. This contract does NOT account for product defects or product: backorder. These issues may affect the. project timeline and will
be dealt with as needed.
— Any changes requested by the client, after the original contract is signed, will result in a change order. Change orders will affect the project
timeline and are an additional cost to the originalcontract.. pricing. A change order will result in a separate fee of $100 per change order, in
addition to the total cost of the Change Order,. Change Orders must be signed, and paid immediately and separately from the original contract
pricing.
—.All selections must be made at the time of the contract, unless otherwise stated, such as, To He Decided (TBD) or Supplied by Owner (SBO). If
there Is not a selection stated, TBD, or SBO then we cannot promise the price written within the cootracL
-- It is the clienCs responsibility to provide all additional information that may be needed for the project. Such as, appliance specifications, all
SBO material, etc_.Ifany Incorrect information Is provided by the client, Island Kitchen and Bath Is NOT responsible. for any additional cost or
time that may occur from this error.
-- Insurance Agent: h Corners Insurance -Stuart--- License Holder: Justin Thiery----:License Number: CBC 1259508
THANK YOU. FOR YOUR BUSINESS!
Cent Signature
Dat
Initials - Island Kitchen and Bath pg. 6
HOME APPLIANCES k+=.i:e:"s.a&'7ni.'"",;;;(y/.y;; +tt
k .
9.0 cu.ft Capacity
TrueSteam® Technology
14 Drying Programs
Available in White & Graphite Steel
Sensor Dry
LoDel lTM Quiet Operation
D M5 LG Drctmmcs W, b A➢m/Iltsrere -1.5 td1Gm hargnteredea&m ar WCorpMl erLccuctaMM
[Faye with..,4 Nm-meV"r. wd"aMmeawremem>ueaplaaaimale_Sanetearutrsmayre9•ere lntemet as n.,,
rf L(q�y�
Life's'fG000d
6AAT[RIALSANOfWL9iF5fM uri St4..r
h\,.��K`r??�sar , � `•b
Aluminized Alloy Steel Drum(Alcosta)
Tub Rear
----_- 5T5
[ae.
_bin________..__.__.___._-_.,_...
Conupl Panel
i Psoled Stp<I
Pluiic(Doar Assembly)
Top Plate
_
Whitc: Powder Co.-.t/ KM: Portelain
Glass/Cleome
Door Cover _
Dark Blis Tinted S4uwe Cover
AvallabteColvs
SPOWERSOURCE , tr�r2c �r ❑'"r'
^.._m9s
Mae CVV, Gmphhe Steel(V)
Ma,-i >",'�"Di to KYyf"a5"- ( '!`.y*s'a
St�.wY .5 Kf tr^.rF }c
Ratings
Electrksl Requirements
Type
Listed
CSA Listted
120V, 15 Amps (Gas)l240V, 30 Amps (EkxMcj
BTU
20,000 ..
Pedestal
--
WDPSW. WOPSV
Pedestal(WxH.0) -_
29'x 141/W a 292W
Sucking Kit
''pIMEN51ONM've`p`•L•y°I.,i,��+.•-+^'J,r>,}?A`r
v _ KSTK2
Product (WnHxp)
79' x 404/5" x32 1/10' (59'svrch door open)
Carton(W"D) ----
—"— --^� 311/5'c45117" 334/5'
Might(Produm/Carzon) Electric
157.7Ibs 1175.3 lbs_
Weight (Product/Cartm,)1ei
UMffED WARMNTY�'4._:'rv.''�`�"�..vtVL +.y. /
_
v 161 lbs/1786:bs
V;a}yn :�5�i�.se..3rY'-•`s2b �. `r7, �t�('
}UPCCOUESYv k,at�Yp�s xn cFY�
1 Year Parts and labor
�/Y��vr•�r��s. t mYJ�'E%!�'"'-V"'Nva
.
0LEXBIODW Electric Dryu(White)
048231018043
DLGX8101WGxsDW(WNte)
048231018067
_
DLEX810OV Electric Dry r(Graphiue Steel)_
048231018050
OLGX8101V Gas Dr er(Graphire Steel)
048231018074
WM810014WAWasher(WItte) i
.Od8231017459
WMBIDORVAWasher(Graphite Steel) _
WDPSVPedestal(GaPbita Steel)
049231017466
_ J 048231012904
WDPSW Pedestal (White)
0482310121398
KSTK2 SwWng Kt(Chmme) --
---- _----
048231 013017
_WD200CVSdektck-Pedestal Washer(Graphite
_
teed) 04823101S189
WD200CW Sidekick^' Pedestal Washer (White)
_
048231 015196
i^:�x'GY9<::se'.iZ�::tis5�'f.,. _ .sti
'aMMmnuelrahmxe.�aRyis4rMVatlmurkaolWi
l'.^vt:::.:/.G::C�Yi+[; �T'..-: ".�..:a :?1:•�::Y
TE.-F.
INSTALLATI
INSTRUCTIONS 19
Installing the Side Vent Kit
®WARNING
• Use a heavy metal vent.
• Do not use plastic or thin foil duct.
• Clean old ducts before installing this dryer.
• To reduce the risk of injury to persons, adhere to all
Industry recommended safety procedures including
the use of long sleeved gloves and safety glasses.
- Failure to follow all of the safety warnings in this
manual could result in property damage, injury to
persons, or death.
Your new dryer is shipped to vent to the rear.
It can also be configured to vent to the bottom or side
(right -side venting is not available on gas models).
An adapter kit, part number 383EEL9001 B, may be
purchased from your LG retailer. This kit contains the
necessary dud components to change the dryer vent
location.
1. Remove the rear exhaust duct retaining screw. Pull
out the exhaust duct.
Retaining
// Reai
Exhaust Duct
Option ?:Side Venting
2. Press the tabs on the knockout and carefully remove
the knockout forthe desired vent opening (right -
side venting is not available on gas models). Press the
adapter dud onto the blower housing and secure to
the base of the dryer as shown.
Adapter
Dud
Bracket �
Knockout
3. Preassemble a 4 inches ('
4-inches (10.2 cm) duct s
with duct tape. Be sure ti
faces AWAY from the dry
assembly through the sic
the adapter duct. Secure
Be sure that the male ern
inches (3.8 cm) to tonne,
Attach cover plate to the
included screw.
Cover
Plate
Elbow
Option 2., Bottom Venting
2. Press the adapter duct or
secure to the base of the
Adapter
Duct ....f
Bracket
3. Insert the 4 inches (10.2 c
opening and press it ontc
that the male end of the c
hole in the bottom of the
duct tape.
Attach the cover plate to
included screw.
Plate
.2 cm) elbow to the next
tion, and secure all joints
t the male end of the elbow
Insert the elbow/duct
opening and press it onto
place with duct tape.
Athe duct protrudes 1
the remaining ductwork.
ack of the dryer with
1 in-
.8 cm)
the blower housing and
er as shown.
elbow through the rear
e adapter duct. Be sure
3w faces down through
ier. Secure in place with
back of the dryer with
20
INSTALLATION INSTkuC'i IONS
Venting the Dryer
®WARNING
To reduce the risk of fire, electric shock, or injury to persons when using this appliance,
including the following:
• Do not crush or collapse ductwork. Failure to follow
these instructions can result in fire or death.
• Do not allow ductwork to rest on or contact sharp
objects. Failure to follow these instructions can result
in fire or death.
• If connecting to existing ductwork, make sure it
Is suitable and clean before installing the dryer.
Failure to follow these instructions can result in fire or
death.
• Venting must conform to local building codes.
Failure to follow these Instructions can result in fire or
death.
• Gas dryers MUST exhaust to the outdoors:
Failure to follow these instructions can result in fire or
death.
• Use only 4-inch (10.2 cm) rigid or flexible metal
ductwork inside the dryer cabinet and for venting
outside. Failure to follow these instructions can result
in fire or death.
• To reduce the risk of fire, combustion, or
accumulation of combustible gases, DO NOT
exhaust dryer air into an enclosed and unventilated
area, such as an attic, wall, ceiling, crawl space,
chimney, gas vent, or concealed space of a
building. Failure to follow these instructions can result
in fire or death.
• To reduce the risk of fire, DO NOT exhaust the dryer
with plastic or thin foil ducting.
Failure to follow these instructions can result in fire or
death.
• The exhaust duct must be 4 inches (10.2 cm) in
diameter with no obstructions. The exhaust duct
should be kept as short as possible. Make sure
to clean any old ducts before installing your new
dryer. Failure to follow these instructions can result in
fire or death.
Rigid or semirigid meta
for use between the dry
installations when it is 1
connection with the abi
UL-listed flexible metal
between the dryer and
use of this ducting will
follow these instructions
DO NOT use sheet mete
which extend into the c
reduce the efficiency of
all joints with duct tape
instructions can result in
To maximize operating
the duct length limitati
page. Failure to follow tl
fire or death.
• Ductwork is not provid
should obtain the nece
end cap should have hi
backdraft when the dn,
follow these instruction:
• The total length of flex
exceed 8 ft. (2.4 m)
• In Canada, that only th
if any, specifically iden
appliance by the mane
United States, that only
if any, specifically identi
by the manufacturer ani
for Clothes Dryer Transit
be used.
basic precautions,
ducting is recommended
ar and the wall. In special
npossible to make a
ve recommendations, a
ransition duct may be used
wall connection only. The
ffect drying time. Failure to
:an result in fire or death.
screws or other fasteners
uct that could catch lint and
the exhaust system. Secure
Failure to follow these
ire or death.
ilts, please observe
noted in the chart next
instructions an result in
with the dryer. You
iry ductwork locally. The
ed dampers to prevent
is not in use. Failure to
n result in fire or death.
e metal duct shall not
rse foil -type flexible ducts,
If led for use with the
'acturer shall be used. In the
hose foil -type Flexible ducts,
ed for use with the appliance
that comply with the Outline
on Duct, Subject 2158A, shall
N INSTRUCTIONS 21
Venting the Dryer (cont.)
Ductwork
�l`Ca Ml Ka+ f A{'yJ
�ff'C\'."`t`I�Y•J j $.t
.1$}3`�"tMF.�'A ,h �'� L
YVatF,ahr y�e
LL�a
r 4 �b'sh 4tefet
l ri
ut!� }�}f'. iit-9`!i 5
,,t$)Y b ,�•nJ. ..(.
Recommended
0
65 ft. (19.8 m)
1
55ft. (16.8m)
2
47 ft. (14.3 m)
to.z .)
P701;C.)
3
36 ft. (11.0 m)
4
28 ft. (8.5 m)
Use only for
0
55 ft. (16.8 m)
short run
installations
1
47 ft. (14.3 m)
2
41 ft. (12.5 m)
CM
3
30 ft. (9.1 m)
zvr
1635 cm)
4
22 ft. (6.7 m)
®NOTE
Ceduct 6 ft. (1.8 m) for each additional elbow. It is not
recommended to use more than four 900 elbows.
Routing and Connecting Ductwork
—®NOTE
Follow the guidelines below to maximize drying
performance and reduce lint buildup and
condensation in the ductwork.
Ductwork and fittings are NOT included and must be
purchased separately.
• Use flinch (10.2 cm) diameter rigid or semirigid
metal ductwork.
• The exhaust duct run should be as short as possible.
• Use as few elbowjoints as possible.
• The male.end of each section of exhaust duct must
point awayfrom the dryer.
Use duct tape on all ductjoints.
Insulate ductwork that runs through unheated areas
in order to reduce condensation and lint buildup on
duct surfaces.
• Incorrect or inadequate exhaust systems are not
covered bythe dryer warranty. Failures or poor
performance caused by such exhaust systems will
not be covered by the dryer warranty.
Correct Venting