Loading...
HomeMy WebLinkAboutCONTRACTr t80-1 - (UlS5 SCANNED BY St. Lucie County Master Bathroom Renovations John Bodenschatz 734-904-6865 - gotobo321@aol.com 10044 S. Ocean Drive, Apt 668, Jensen Beach, FL 34957 prn;ert it. 1 R14n -Spa Winds - 608 - Bodenschatz Contract April 24, 2018 #001 Permit Cost- notice of commencement, building permit, NOC termination and IKB time - pricing varies and can not be determined until after all paperwork is filed ^ V 1 2 Disconnect vanity faucet &trap " 3 Remove existing vanity cabinetry and countertop and dispose items ' 5 1 Remove shower valve trim and shower head fittings ` 6 Disconnect drain trap ' 7 Remove flooring ` 8 Cut out shower plumbing ` 9 Inspect all exposed plumbing/electrical within the walls - Due to updated building codes, if your unit is not updated/current to code, IKB is required to bring it up to code - These costs are to be covered by the homeowner. ' 10 Chip cement floor and cut out remove old shower trap ' 1111 Remove all of the above materials and dispose at the dump ` 12 Purchase all general rebuild material ' $200.00 13 Rough shower curb ' 14 Create larger shower " 15 Create 12" deep closet at end of closet ` 16 Install pocket door i $550.00 17 Install new shower trap and drain ` 18 Install liner back up on walls ' 19 Install shower slop kit per code " 20 Install shower pan " 21 Install DensSldeld on shower walls and ceiling ' 22 Tape and finish bath and shower ' -. Mud shower pan " Install bathroom dry floor tile - approx. 80sgft - Material - Happy Floors - Italia Natural -12x24 - 6400-G @ $4.80 per sgft -Layout-Subway - Grout Color - TEC - Silverado - 949 Tile $384.00 Install shower curb threshold r'TdlbeAEi cafed-6iii ifthe-counter<top,ma_ teHal' Tile $80.00 Install shower wall tile - approx. 100sgft - Material - Happy Floors - Italia Polished -12x24 - 6410-G @ $5.20 per sgf - -Layout- Subway -GroutColor-TEC-Silverado-949 Tile $520.00 Initials - Island Kitchen and Bath pg.1 ir:oa beudY'seat -.tob6fabricatedout ofthecoohter-top material " -Location -Right rear wall Tile $300.00 nstall shower wall bullnose - approx. 22UL -Material-Schluter in Brushed Nickel Tile $180.00 nstall shower wet floor tile - approx. 20sgft - Material - Daltile - Artic Gray - 4x4 tumbled file - L757 - Layout - Straight - Grout Color - TEC - Silverado - 949 Tile $300.00 nstallshowerpiche shelf.Yo'bejabricbtedoutofthe'eounterEdpihaterial" - Location -Above the bench Tile $80.00 Install vanity cabinetry - Material -Wellborn Select Series - Hancock Full Overlay in Glacier - Classic drawer fronts - Soft -close features - Mirror Molding `Note `Cabinetpricing is based on the original signed 2020 DesWn and any changes made 32 may affect the pricing of the cabinetry (+/-). ` $3,400.00_ _ Install cabinetry hardware 33 - Material - Hardware Resources - Merrick Pull - 549-128SN ` $90.00 Install bathroom vanity counter top - approx. 11sgfiw/ 4" back/side splashes @ $33 per sgft for fabrication and two (2) sink cutouts @ $125 each - Material - Emerstone - Gray Galaxy p34;,- Edge -Eased $613.00 $738.00 Install bathroom vanity sink - quantity two(2) 6' -Material -7Wo (2) undermount rectangles in White Plum $250.00 Install bathroom vanity faucet -quantity two (2) -Material -Two (2) Moen Eva two -handle high arc 4"centersetfaucets in Brushed Nickel - 3rT 641OBN Plum $330.00 ' r'`*�� u==: Install shower valve }r - Material - MoenPositemp valve -252O ,.wry 38},x.,-,`c:-;.€bn,t 7k'S':'"rfgfi Plum_ $215.00 -;e1urmg�aew Install shower valve trim 39i - Material -Moen Kingsley Positemp valve trim in Brushed Nickel - T2111BN Plum $165.00 Install hand shower with slidebar _ Material - Moensinglefunction hand shower with slidebarinBrushed Nickel -386BEPBN- requires a drop elbow - A725BN Location - oppositeofshowercontrols Plum $310.00 yw -s y, e y„ . nstall five (5) LED recessed lights in the bath - two (2) over the vanity and two (2) in the shower, one over toilet Elect $625.00 -Install new whisper quiet exhaust fan Elect $225.00 ' dd two (2) outlets above countertop $200.00 $50.00 . , .. Mean., y_. ... ,. .. Install Bypass Shower Doors 46 - Material - Clear Glass - Brushed Nickel hardware to match the plumbing factures Glass $900.00 ti etti MIN 1,11 48 49 Labor allowance(*) Initials - Island Kitchen and Bath pg. 2 Tile labor allowance TOTAL LABOR / MATERIAL ALLOWANCE GRAND PROJECT ALLOWANCE Deposits Required: Counter -top Deposit: $500 - Project Deposit: $5,800 - Total Deposits: $6,300 Draw #1 due once tile is completed: $6,000 Draw #2 due once counter is templated: $5,500 Final Payment due upon completion: Remaining balance Commencement: Completion: PAYMENT TERMS AND CONDITIONS 1.) Deposit of counter -top material & cabinetry paid in full plus 25% of the project A deposit check, payable to Island Fitchen and Bath, is required for a project to be scheduled. Credit Cards are NOT accepted. Deposit checks will not be cashed until the project is about to commence. 2.) Draws will be collected as needed to complete the project If the client refuses to pay a draw, the project will be halted until payment is collected. 3.) Full payment of open balance within 3 days of completion of the project TERMS AND CONDITIONS ; — This estimate is valid for 30 calendar days starting on the date stated at the top of the estimate. — The prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and selections are made by client — ISLAND HITCHEN AND BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is In good standing. Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the contract — Due to unforeseeable conditions inside walls, behind cabinets, etc.., additional cost may occur during construction for issues such as mold, and existing plumbing/ electrical not being safe or code compliant These additional costs are NOT included in any contract pricing and will be dealt with as needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline and will be dealt with as needed. — Any changes requested by the client, after the original contract is signed, will result in a change order. Change orders will affect the project timeline and are an additional cost to the original contract pricing. A change order will result in a separate fee of $100 per change order, in addition to the total cost of the Change Order. Change Orders most be signed, and paid immediately and separately from the original contract pricing. — All selections most be made at the time of the contract, unless otherwise stated, such as, To Be Decided (TBD) or Supplied by Owner (SB0). If there is not a selection stated, TBD, or SBO then we cannot promise the price written within the contract — It Is the client's responsibility to provide all additional information that may be needed for the project Such as, appliance specifications, all SBO material, etc. If any incorrect information is provided by the client, Island HImhen and Bath is NOT responsible for any additional cost or time that may occur from this error. — InsuranceAgent: 4 Corners Insurance -Stuart --- License Holder: Justin Thiery --- License Number. CBC 1259508 THANK YOU FOR YOUR BUSINESSI Client Signature IKB Signature (8 Date Initials - Island Kitchen and Bath pg. 3