HomeMy WebLinkAboutTHRESHOLD INSPECTIONSThreshold Inspections
Special Inspection Plan
May 7, 2018
Proj ect:
Owner's Representative
Structural Engineer of Record
:C0un:ty,Perrnitt]1ng
D
E'18
M L Engineering Inc.
2030 37th Ave
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
Ocean Harbor South Condo — Concrete Balcony Repairs 2018
4250 North Highway AI A (North Building)
Units 201, 301 & 608
Ft. Pierce, Florida 34949
Elliott Merrill Community Management
Mr. Gene Ross
835 201h Place
Vero Beach, Florida 32960
M L Engineering, Inc
2030 37 h Ave
Vero Beach, Florida 32960
This Statement of Threshold Inspections is submitted as required for permit issuance and in accordance
with the requirements of the Florida Building Code (FBC). It includes a schedule of Special Inspection
Services applicable to this project as well as the name of the Special Inspector.
The Special Inspector shall keep records of all inspections and shall furnish inspection reports to the
Building Official, Owner, Engineer of Record and Contractor. All discrepancies shall be brought to the
Contractor's attention, and if such discrepancies are not corrected, these discrepancies shall be brought
to the attention of the Building Official and Structural Engineer of Record.
The Special Inspector shall submit a final report to the Building Official documenting completion of all
Special Inspections and corrections of any discrepancies prior to issuance of the Certificate of
Occupancy. Special inspections do not relieve the Contractor of his or her responsibilities to carry out
quality control inspections and testing. Job site safety means and methods are solely the responsibility
of the Contractor.
SCANNED
St. Luc
BY
le County
I A. Lue, P.E.
P.E. No. 47520
Inspector No. 1061
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
a
Special Inspection Plan
Ocean Harbor South Condominiums
4250 North Hwy. AM
Ft. Pierce, Florida
General Notes
1. The purpose of this special Inspection as required by the FBC, is to report and record the repair
procedures highlighting those that are not in compliance with the Contract Documents.
2. The Special Inspector shall meet the requirements of the Board of Building Codes and
Standards. The special inspector shall be qualified as a building inspector under Part 30I of
Chapter 468, Florida Statutes, or certified as a special inspector under Chapter 471 or 481,
Florida Statues
3. The Special Inspector must solely dedicate his time to the Project and shall not be allowed to
provide other services or work, such as material or concrete testing on the same project.
4. The Contractor shall cooperate with and assist, however possible the Special Inspector in
performing his inspections. The Contractor shall allow the Special Inspector access to the
project at all times when work is in progress. The Contractor shall review this plan and
coordinate the schedule of work such that a minimum of 24 hours notice is given to the Special
Inspector before the work that requires inspection is performed.
5. The Special Inspector shall be responsible to the Owner and Building Department having
jurisdiction for the project.
6. The Special Inspector shall perform site visits at regular intervals to ensure that the inspections
are being performed by his on -site representative in accordance with the Threshold Plan.
7. The Special Inspector shall cooperate with the Contractor and shall immediately notify the
Contractor of all discrepancies and deviations from the Contract Documents, and the Contractor
shall immediately maker every effort to rectify said discrepancies or deviations.
8. Upon completion of the structural repairs, a signed and sealed statement by the Special
Inspector must be submitted to the building department stating that the portion of the project
under his inspection responsibilities and under the Threshold Plan was constructed in
substantial conformance with the Contract Documents.
9. This document is in addition to the requirements of the standard building inspections as
required by the Florida Building Code and is not meant to specify all inspections required by
that Code.
M L Engineering, Inc.
2030 37`h Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
Special Inspection Plan
Ocean Harbor South Condominiums
4250 North Hwy. AM
Ft. Pierce, Florida
Schedule of Special Inspection Services
Scope of work
1. Repair of balcony slab edge
2. Repair of concrete surface & full depth spalls
3. Repair of concrete ceiling spalls
4. Repair of concrete columns
5. Repair of guardrail post base attachments
6. Repair of post tension cables
Concrete Repairs
1. Verify location and quantity of repairs
2. Verify reinforcement quantity, sizes, splices, dowels, placement and laps.
3. Verify the use of the correct approved concrete mix designs
4. Continuous observation of concrete placement for repair areas in accordance with the Contract
Documents.
M L Engineering, Inc.
2030 37°i Avenue, Vero Beach, Florida 32960 (772) 569-1257(P) / (772) 569-4041(F)
3
7�1
I*
SUMMARY OF ESTIMATED OUANTITIES
ITEM
LEGEND
REPAIR
QUANTITIES
UNIT PRICE
I
®
EDGE POUR / FULL DEPTH REPAIRS
21
$ 2� OQQ1. FT.
JjAMOUNT
'
$ O6 2 J . DO
2
�
SURFACE SPALL
26
$ ODAo. FT.
$ 1 Y70. Jo
3
GOLUMN SHALL
&
-��/!
$ 31,E . CO /LU. FT.
$ Zd 0p, 00
4
CEILING SPALLS
16
$ J Q, OD /5G1. FT.
$ 1760 JO
5
O
CORE MOUNT RAILI1,16 P057 POCKET REPAIR
26
$ %A ' 00 EA
$ I LI SO r 00
6
TEMP. HEATHER BARRIERS (&' H16H x 10' WIDE)
4
$ fV 0o EA.
$ 1600 r DV
7
P/T GABLE LOCK OFF/ DE -STREW IRE-STRE55
20
$ 900 90 EA.
$ IMP op
g
REMOVE 8 REINSTALL 611ARDRAIL5 WI FEW PRO-TEGT FASTENERS
1561
$ 30, op /LIN FT.
$ L1770. po
q
REMOVE d REINSTALL HURRICANE SH ITRS W/ NEW SHIMS
45
$ 3p pq/LIN FT.
$ f1 �. 00
10
DECORATIVE TOPPING, WATERPROOFING 4 SEALANT 0 REPAIRS
140
$ .5' l> /SO. FT.
$
H
NEW STV" 0 REPAIR AREAS
100
$ ! 51s0 /50' FT.
$ 15106. DD
12
REMOVE d REINSTALL SLIDING 6LASS DOORS (&' HI6H x &'WIDE)
4
$ pop, p0 EA.
$ q#Do, 00
13
REMOVE 4 REPLACE ALUM 5GREEN EZL09M (&' HIGH) 0 UNIT 101
53
$ 1/0. 0 /LIK FT,
$ 1,1 Z0, Od
14
MOBILIZATION
I
$
5O17. DO EA
$ 300. JD
NOTE:
NEW ALUM SCREEN ENCLOSURE SHALL BE INSTALLED W/ NEW PRO-TEGT
FASTENER SYSTEM W/ I/40111 STAINLESS STEEL ANGHOR5 W/ GAP A SLEEVES
IN URETHANE FILLED HOLES W/ NEW 5GREEN d SPLINE
TOTAL PRICE - S 5518D, 00
mlcW &WE. P.E.
FLORB34 REG. A47520
- --
JOB
asu"mm' 5/7/18
-
jj��//��
NAB1F.
T Is drawln9'and design ae shown Is
Ur/IdENGINEERING,
INC: I
OCEAN HARBOR SOUTH
JOB NO.
18-1$3
fine property ofMi. Engineering, Inc.
ofIris
Reproduction of Iris arming
j Consulting Structural Engineer
NORTH BLDG. BALCONY REPAIRS
oranyconleMmandforus
promo content express
., 2030371h Avenue
4250 N. HW1'AIA FT. PIERCE, FL
bm "s"' TR `"ELxEa Br ML
con Wr
ISD m,,.mwconslllWelaninlMage-
Vero Beach, Florida 32960
menF, and maybe to legal omen
Phon91772.569.1257 Fos 772M9.4041
iRg:
SUMMARY OF QUANTITIES
IS S-2 OF 5 sHFa
by ML En9lnearin9• Inc.
: s'-2•
DOST ALIM
RNLRtS
t�scrzf �,
w. Fr. I W. FT. I w. Fr. I w. FT.I
L2
450.Fr.....
— DECK OOATMS
TO BE Ftff''LAC.®
®FT.
I
I..y �.�.
I I
con MXW RA LM6
FOSTMAIR TYP.0
_.
®FT.
4
M
I 4sa FT.
�I€
�1I
.
YFATIBtYNLL--4II 1�
T@P
M�
slur e5 TO BE
REMO W I Fl WALL®
I
Y-Y
2 B'-0
UNIT #201
N.TS.
NORTH
FIELD NOTES:
I. M5TIN6 HURRIOANE SHJiIERS d 56D TO BE RE 40VEP AND RE-R6TALLED AFTER REPAIRS
aowDA 9Eg.unszg
'M.
.
JOB
G
UVEDAM; 5I7I18
arawmg ana Ceslgn as n
ENGINEERING,
INC,.
OCEAN HARBOR SOUTH
NORTH BLDG. BALCONY REPAIRS
.
the Inc.
Re Property of o engineering.Inc.
ReprotlutlionanWoruse glthis tlmwmg
or any content therem. without express
JOB NO.
IS-153
consulting Structural Engineer
TR c""'GDM'`
ML
2g3037it1 Avenue _
4250 N. HWY AIA FT. PIERCE, FL
is pronronea o cio�umia an InMnge-
Veto Beach, Floiitlo 32960
N¢ne: 7M569.1257 9mn nz.569.4041
menl. and may be subject to legal action
by ML Engineering. Inc.
TIME: INSPECTION SURVEY
SHU NO: S-3 of 5
SKET
LE6END
REPAIR Gd1ANiITIES
TOTAL BALCONY AREA
215
5Q. Ff.
®
ED6E POUR / FULL DEPTH REPAIR
6
CU. FT.
SURFAOE SPALL
8
50. Pf.
CALUMN SPAR
NONE
GU. Ff.
OEILIN6 SPALLS
12
5Q. FT.
Q
GORE MOUNT RAILING POST REPAIR
13
N0.
i -2•
ZMfir
% .�.� �. •
SWIMIE S TO 13E
REMOVED RE41il ID
T'P 2Q
3"
UNIT 0301
N.TS. NORTH
LESW
REPAIR GUANTME5
TOTAL BALCONY AREA
215
50.Fr.
®
EDGE POUR / FULL DEPTH REPAIR
18
CU. FT.
SURFACE SPALL
10
50. Fr.
COLUMN SPALL
NOW
CU. Fr.
CEILING SPALL5
4
50. Fr.
O
CORE HOW RAILING POST REPAIR
NONE
NO.
r
JOB
SeEU0IE: 5/7/18
I��1
NAME:
This all antl design aj
WLENGINEERING, INC..
OCEAN HARBOR SOUTH
JOB NO.
18-153
the pope"o1 ML Engine
Reproduclanond/wuseofI
Consulting Structural Engineer-
NORTH BLDG. BALCONY REPAIRS
or on, coolenithereln.wlth
2030371h Avenue
4250 N. HWY AlA FT. PIERCE, FL
oRAvrtu By: TR CHEc"o By: N/Ir
IYIL
Is proonmiiee may cionsniuie'
VeroBeach.P.,a 32960
mW. and may be sublecl to
Imme: n2.569.1257 Pox 2ffi.569.4041 r
Tn1E,INSPECTION SURVEY
SHEET WoS-4 ov 5 SHEET
l ML Engln,a erl
x �y� O•
EXST AUM %UrrE%TO BE
RARING R010J® 4 f--ItF9TALIM
3 CU. Fr. f
DECK WAM
`
TO BE REPLA M
1
CORE HOIAtf
8,a Ff.
RAILING POST
3 fpA. FT.
EARL TP 2d3
�TEf•P
FEATIBt W a
4
s Co. Fr.
3 B'-0' 1.
UNIT 0608
N.T5.
NORTH
rr• r
■
v
r
Pe.MY-' LA LOE•PE.
-
JOB
IssuspAre: 5/7/1 8
`
•
����////���
,-
NMIEo
this drawing and design as shown Is
ENGINEERING,. irvIC
OCEAN HARBOR SOUTH
JOB NO.
18-153
the properly Of ML Pngmeering. Inc.
ReproaJ.h.nanal., s..1thsd.Mg
Consulting
Structural Engineei"
NORTH BLDG. BALCONY REPAIRS
or am caniemmereln• wimom e.pross
203037th Avenue
4250 N. HWY Al FT. PIERCE, FL
°R"y'"�" TR °H"'�D BN ML
Is prohiblfeconsent ord may scionstmtleian Infringe -
Vero Beach, Florida 32960
menf. and may be sublecf to IB" anion
mane:n2.569.1257 raxn2.5sv.a0ar
mu: INSPECTION SURVEY
"iEfNO S-5 OF 6 SKU
la, MIL
M L Engineering Inc. Project No. 1$453 Report No. 2
Client: `�, r. Gene Ross — Elliott Merrill
Consulting Engineers " i
Threshold Inspector Building Official: 00 iMr.- art Peterson — SLC Bldg. Dept.
2030 37's Avenue `�9 // drew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960 Contractor: U Mr. Bob Stark —Structure -Con
Phone: (772) 569-4041 . Kh E McConnell
n nell — Structure Con
Fax: (772) 569-4041 r. Khris McConnell— Structure Con
www.mleneineerineinc.com File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA —NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South —Bldg. A DATE: May 31, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con . PROJECT MGR: Khris McConnell
INSPECTED BY: Mike Luc WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building balcony repairs at Units 201 & 301 SCANNED
BY
OBSERVATIONS:. St. LUCIQ County
Unit 201
• The entire north and most of the east balcony edges require repair.
• The reinforcing bars are corroded behind the PT anchors and will require about 8 PT cables at the north slab
edge to be locked,off and spliced with new anchors.
• The spalls at the doors extend under the door tracks, but these may be repaired without having to enter the unit.
• The aluminum screen enclosure at Unit 101 below will require removal to repair the slab edge above. (Need an
alternate price to replace with a new enclosure.)
Unit 301
• There is a significant amount of ceiling spalls at the underside of the Unit 301 floor slab as well as surface
spalls. Some of these areas will be full depth repairs if the repairs at the underside coincide with the upper
surface spalls.
• There are surface spalls along both sliding glass doors.
• There is evidence of previous repairs where a blue -colored bonding agent is visible.
• Consideration should be given to replace rather than repair the slab based on a cost comparison.
RECOMMENDATIONS:
Unit 201
• Continue the repairs as per the design plans.
• Coordinate with the PT specialist to lock off the required cables.
• Provide shoring during repairs as well as to re -shore Unit 301 above.
• Provide a cost difference to remove and re -install the existing screen enclosure (with new screens, Florida
panels and paint) vs. replacement with a new screen enclosure.
Unit 301
• Provide a cost comparison to repair the slab and/or to replace the entire slab. Keep in mind that all of the PT
cables will require replacement if the slab is repaired.
Page 1 of 3
M L Engineering Inc. Project No.18-153
Client:
Building Official:
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960 Contractor:
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mleneineerinuinc.com File
Report No. 2
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson —SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark — Structure -Con
Mr. Gabriel Efrainsanjaun — Structure Con
Mr. Rhris McConnell — Structure Con
North Building A looking south.
Units 101, 201 & 301
Pic 2
Unit 201 balcony edge.
Corroded reinforcing behind the PT anchors which will
require locking off the cables and replacing the
anchors.
Pic 3
Typical PT anchor at slab edge at Unit 201.
Note:
The end of the PT cable was not cut short enough and
both the cable and anchor are corroded. These anchors
are also original anchors and are not encapsulated.
Corroded reinforcing bars behind the anchor which
require repairs or replacement.
Page 2 of 3
M L Engineering Inc. Project No. 18-153
Consulting Engineers Client:
Threshold Inspector Building Official:
2030 37' Avenue
Vero Beach, Florida 32960 Contractor:
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlenaineerineinc.com File
Report No. 2
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson —SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell— Structure Con
Pic 4
View of the ceiling repairs needed at underside of Unit
301 slab.
Areas to be repaired at Unit 201 east slab edge.
Page 3 of 3
M L Engineering Ne.
Consulting Engineers
Threshold Inspector
2030 3711 Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mleneineeringinc. corn
PROJECT NAME:
CLIENT:
CONTRACTOR:
Project No. 18-153 Report No. 1
Client: Mr. Gene Ross- Elliott Merrill
Building Official: Mr. Carl Peterson-SLC Bldg. Dept.
Contractor: Mr. Bob Stark -Structure -Con
File Mr. Gabriel Efrainsanjaun-Structure Con
Mr. Khris McConnell -Structure Con
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AlA —NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
Ocean Harbor South —Bldg. A
Elliott Merrill Community Mgmt.
Structure -Con
DATE:
October 08, 2018
LOCATION:
Ft. Pierce, FL
PROJECT MGR:
Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building
Balcony Repairs
OBSERVATIONS:
Units 201 &301
No work completed at this time
Unit 608
Demolition of the deteriorated concrete at the north column was completed, bars cleaned and coated with corrosion
inhibitor and column repaired.
The concrete was removed at the spilled edge. It appears that is was repaired in the past and the material did not
adequately bond with the surrounding original concrete. The exposed reinforcing bars at this area have minimal
deterioration but should still be cleaned and coated with the specified corrosion inhibitor.
Removal of the deteriorated concrete at the spall at the inside concrete column is in progress to fully expose the
corroded reinforcing bars prior to cleaning and coating with corrosion inhibitor.
RECOMMENDATIONS:
Continue repairs as per the specs by mechanically cleaning all corroded reinforcing bars and coating with the specified
corrosion inhibitor prior to applying concrete repair mortar.
Lue, P.E.
Page 1 of 2
t M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37' Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 5694041
www.mlenginceringinc.com
Project No. 18-153
Report No. 1
Client:
Mr. Gene Ross- Elliott Merrill
Building Official:
Mr. Carl Peterson-SLC Bldg. Dept.
Contractor:
Mr. Bob Stark -Structure -Con
File
Mr. Gabriel Efrainsanjaun-Structure Con
Mr. Khris McConnell -Structure Con
Pic I
8x16 concrete column at the north corner
Pic 2
Spall along south balcony edge
Pic 3
Spall at concrete column at inside corner
Page 2 of 2
M L Engineering Inc.
Project No. 18-153
Report No. 2
Consulting Engineers
Client:
Mr. Gene Ross — Elliott Merrill
Threshold Inspector
Building Official:
Mr. Carl Peterson—SLC Bldg. Dept.
2030 3711 Avenue
Mr. Andrew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960
Contractor:
Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257
Mr. Gabriel Efrainsanjaun —Structure Con
Fax: (772) 5694041
Mr. Khris McConnell — Structure Con
www.mlenginecringinc.com
File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA—NORTH BLDG—BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South —Bldg. A DATE: May 31, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con PROJECT MGR: Khris McConnell
INSPECTED BY: Mike Lue WEATHER:
WORK INSPECTED:
Bldg. A —North Building balcony repairs at Units 201 & 301
OBSERVATIONS:
Unit 201
• The entire north and most of the east balcony edges require repair.
• The reinforcing bars are corroded behind the PT anchors and will require about 8 PT cables at the north slab
edge to be locked off and spliced with new anchors.
• The spalls at the doors extend under the door tracks, but these may be repaired without having to enter the unit.
• The aluminum screen enclosure at Unit 101 below will require removal to repair the slab edge above. (Need an
alternate price to replace with a new enclosure.)
Unit 301
• There is a significant amount of ceiling spalls at the underside of the Unit 301 floor slab as well as surface
spalls. Some of these areas will be full depth repairs if the repairs at the underside coincide with the upper
surface spalls.
• There are surface spalls along both sliding glass doors.
• There is evidence of previous repairs where a blue -colored bonding agent is visible.
• Consideration should be given to replace rather than repair the slab based on a cost comparison.
RECOMMENDATIONS:
Unit 201
• Continue the repairs as per the design plans.
• Coordinate with the PT specialist to lock off the required cables.
• Provide shoring during repairs as well as to re -shore Unit 301 above.
• Provide a cost difference to remove and re -install the existing screen enclosure (with new screens, Florida
panels and paint) vs. replacement with a new screen enclosure.
Unit 301
• Provide a cost comparison to repair the slab and/or to replace the entire slab. Keep in mind that all of the PT
cables viillrequire replacement if the slab is repaired.
;`-I' 47520
STATE OF
Page 1 of 3
M L Engineering Inc. Project No. 18-153
Client:
Building Official:
Contractor:
Report No. 2
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell — Structure Con
Pic I
North Building A looking south.
Units 101, 201 & 301
Pic 2
Unit 201 balcony edge.
Corroded reinforcing behind the PT anchors which will
require locking off the cables and replacing the
anchors.
Pic 3
Typical PT anchor at slab edge at Unit 201.
Note:
The end of the PT cable was not cut short enough and
both the cable and anchor are corroded. These anchors
are also original anchors and are not encapsulated.
Corroded reinforcing bars behind the anchor which
require repairs or replacement.
Consulting Engineers
Threshold Inspector
2030 37'^ Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mlenaineeringinc.cona
File
Page 2 of 3
M L Engineering Inc. Project No. 18-153
Consulting Engineers Client:
Threshold Inspector Building Official:
2030 37'" Avenue
Vero Beach, Florida 32960 Contractor:
Phone: (772)569-1257
Fax: (772)569-4041
www.mlenaineerineinc.com File
Report No. 2
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark — Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell — Structure Con
View of the ceiling repairs needed at underside of Unit
301 slab.
Pic 5
Areas to be repaired at Unit 201 east slab edge.
Page 3 of 3
M L Engineering Inc. Project No. 18-153 Report No. 3
Consulting Engineers Client: Mr. Gene Ross— Elliott Merrill
Threshold Inspector Building Official: Mr. Carl Peterson — SLC Bldg. Dept.
2030 3r Avenue Mr. Andrew Manero— SLC Bldg. Dept.
Vero Beach, Florida 32960 Contractor: Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257 Mr. Gabriel Efrainsanjaun— Structure Con
Fax: (772) 569-4041 Mr. Khris McConnell — Structure Con
www.mlenaineerineinc.com File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY A lA — NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South — Bldg. A DATE: June 20, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con PROJECT MGR: Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building balcony repairs at Units 201 & 301
OBSERVATIONS:
Unit 201 & 301
• Decision was made to repair the deteriorated areas instead of replacing the entire balcony slabs.
• Demolition is complete and there were 8 PT cables that had to be locked off and spliced at each balcony.
There is one splice that is not covered with a protective PVC which is to be placed.
• Add 44 bar in the east west direction next to all bars that were cut to accommodate the cable lock off
connection. Provide a minimum of 24" lap splice.
• Remove miscellaneous abandoned aluminum handrail posts ends that were uncovered in the slab.
• Cut ends of bars back to maintain a minimum of 2" concrete cover from slab edges.
• Provide plastic chairs under the reinforcing mats to maintain the required concrete coverage
RECOMMENDATIONS:
If a ready mix concrete is going to be used for the slab pours instead of a Emaco 1061 EX bag mix repair mortar, a
suitable bonding agent such as Aquafm is to be used as well as MasterSeal Traffic 1500 polyurethane water proofing
system.
The ready mix concrete option shall be as follows:
5,000 psi high early strength pump mix
Max w/c ratio 0.4
Max slump 5" +/- 1"
DCI corrosion inhibitor of 4.0 gal per cu yd
Shrinkage compensating agent to be included in mix
Concrete shall be tested at a minim of 7 days and 28 days and should have a minimum compressive strength of 4,000
psi prior to stressing PT cables.
Page 1 of 3
1,
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37`h Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mleneineerineinc.com
File
Project No. 18-153
Client:
Building Official:
Contractor:
Pic 2
Units 201 & 301
Report No. 3
Mr. Gene Ross— Elliott Merrill
Mr. Carl Peterson— SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell — Structure Con
Remove old guard rail post anchors and replace with
new ss tapcons with plastic protective caps.
Page 2 of 3
Project No. 18-153 Report No. 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3r Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www. mleneineerinainc.com
Client: Mr. Gene Ross — Elliott Merrill
Building Official: Mr. Carl Peterson —SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor: Mr. Bob Stark— Stracture-Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell— Structure Con
File
Page 3 of 3
M L Engineering Inc.
Project No.18-153
Report No. 4
Consulting Engineers
Client:
Mr. Gene Ross — Elliott Merrill
Threshold Inspector
Building Official:
Mr. Carl Peterson — SLC Bldg. Dept.
2030 37'^ Avenue
Mr. Andrew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960
Contractor:
Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257
Mr. Gabriel Efrainsanjaun — Structure Con
Fax: (772) 569-4041
Mr. Khris McConnell —Structure Con
www.mleneineerinainc.com
File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA—NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South —Bldg. A DATE: July 24, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Lue
PROJECT MGR: Khris McConnell
WEATHER: Sunny
FINAL REPORT
Bldg. A —North Building balcony repairs at Units 201, 301 & 608.
OBSERVATIONS:
Structural repairs to the concrete balconies have been completed and the urethane deck coating has been applied to the
entire deck in substantial accordance with the design and permitted plans.
Unit 608
Repairs were completed in October 2018.
Units 201 & 301
Repairs completed July 2019.
RECOMMENDATIONS:
The following non-structural miscellaneous items are to be completed:
1. Replace two damaged sections of screening in the screen enclosure of Unit 101.
2. Place sealant at the gap at the top rail and underside of slab.
3. Paint floor slab on grade.
4. Touch up paint the walls where required at Units 201 & 301.
5. Provide aluminum clip angle at the bottom rail to the comer post at Unit 201.
6. Clean slab in front of the east SGD at Unit 201.
Page 1 of 2
1'
M L Engineering Inc. Project No. 18-153
Consulting Engineers Client:
Threshold Inspector Building Official:
2030 371h Avenue
Vero Beach, Florida 32960 Contractor:
Phone: (772)569-1257
Fax: (772)569-4041
www.mlengineeringinc.com File
Report No. 4
Mr. Gene Ross — Elliott Merrill
Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Mr. Bob Stark —Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell — Structure Con
Pic 2
Unit 301 - Repaired balcony slab.
Touch up paint at base of wall.
Page 2 of 2
M L Engineering Inc. Project No. 18-153 Report No. 1
Consulting Engineers
Client: Mr. Gene Ross- Elliott Merrill
Threshold Inspector
Building Official: Mr. Carl Peterson-SLC Bldg. Dept.
2030 3711 Avenue
Contractor: Mr. Bob Stark -Structure -Con
Vero Beach, Florida 32960 File Mr. Gabriel Efrainsanjaun-Structure Con
Phone: (772) 569-1257
Mr. Khris McConnell -Structure Con
Fax: (772)569-4041
www.mlenginceringine.com
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY A lA —NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME:
Ocean Harbor South— Bldg. A DATE: October 08, 2018
CLIENT:
Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR:
Structure -Con PROJECT MGR: Khris McConnell
INSPECTED BY:
Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building
Balcony Repairs
OBSERVATIONS:
Units 201 &301
No work completed at this time
Unit 608
Demolition of the deteriorated concrete at the north column was completed, bars cleaned and coated with corrosion
inhibitor and column repaired.
The concrete was removed at the spalled edge. It appears that is was repaired in the past and the material did not
adequately bond with the surrounding original concrete. The exposed reinforcing bars at this area have minimal
deterioration but should still be cleaned and coated with the specified corrosion inhibitor.
Removal of the deteriorated concrete at the spall at the inside concrete column is in progress to fully expose the
corroded reinforcing bars prior to cleaning and coating with corrosion inhibitor.
RECOMMENDATIONS:
Continue repairs as per the specs by mechanically cleaning all corroded reinforcing bars and coating with the specified
corrosion inhibitor prior to applying concrete repair mortar.
.E.
Page 1 of 2
M L Engineering Inc.
Project No. 18-153 Report No. 1
Consulting Engineers
Threshold Inspector
2030 37'h Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www. mleneineerineinccom
Client: Mr. Gene Ross- Elliott Merrill
Building Official: Mr. Carl Peterson-SLC Bldg. Dept.
Contractor: Mr. Bob Stark -Structure -Con
File Mr. Gabriel Efrainsmjaun-Structure Con
Mr. Khris McConnell -Structure Con
Pic I
8x16 concrete column at the north corner
Spall along south balcony edge
Spall at concrete column at inside comer
Page 2 of 2
4 - -'I
M L Engineering Inc." Project No. 18-153 Report No. 3
Consulting Engineers Client: Mr. Gene Ross— Elliott Merrill
Threshold Inspector Building Official: Mr. Carl Peterson— SLC Bldg. Dept.
2030 37'h Avenue Mr. Andrew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960 Contractor: Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257 Mr. Gabriel Efrainsanjaun— Structure Con
Fax: (772) 569-4041 Mr. Khris McConnell— Structure Con
www.mlengineeringinc.com File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA—NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME:
Ocean Harbor South— Bldg. A
DATE:
June 20, 2019
CLIENT:
Elliott Merrill Community Mgmt.
LOCATION:
Ft. Pierce, FL
CONTRACTOR:
Structure -Con
PROJECT MGR:
Khris McConnell
INSPECTED BY:
Mike Lue
WEATHER:
Sunny
WORK INSPECTED:
Bldg. A — North Building balcony repairs at Units 201 & 301
OBSERVATIONS:
Unit 201 & 301
• Decision was made to repair the deteriorated areas instead of replacing the entire balcony slabs.
• Demolition is complete and there were 8 PT cables that had to be locked off and spliced at each balcony.
There is one splice that is not covered with a protective PVC which is to be placed.
• Add #4 bar in the east west direction next to all bars that were cut to accommodate the cable lock off
connection. Provide a minimum of 24" lap splice.
• Remove miscellaneous abandoned aluminum handrail posts ends that were uncovered in the slab.
Cut ends of bars back to maintain a minimum of 2" concrete cover from slab edges.
Provide plastic chairs under the reinforcing mats to maintain the required concrete coverage
RECOMMENDATIONS:
If a ready mix concrete is going to be used for the slab pours instead of a Emaco 1061 EX bag mix repair mortar, a
suitable bonding agent such as Aquafin is to be used as well as MasterSeal Traffic 1500 polyurethane water proofing
system.
The ready mix concrete option shall be as follows:
5,000 psi high early strength pump mix
Max w/c ratio 0.4
Max slump 5" +/- I"
DCI corrosion inhibitor of 4.0 gal per cu yd
Shrinkage compensating agent to be included in mix
Concrete shall be tested at a minim of 7 days and 28 days and should have a minimum compressive strength of 4,000
psi prior to stressing PT cables.
Page 1 of 3
M L Engineering Inc.
Project No. 18-153 Report No. 3
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www. mleneineerinainc.com
Client:
Mr. Gene Ross— Elliott Merrill
Building Official:
Mr. Carl Peterson— SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor:
Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun — Structure Con
Mr. Khris McConnell — Structure Con
File
Pic 2
Units 201 & 301
Remove old guard rail post anchors and replace with
new as tapcons with plastic protective caps.
Page 2 of 3
M L Engineering Iu, .
Project No. 18-153 Report No. 3
Consulting Engineers
Threshold Inspector
2030 370 Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.mlenaincerfinginc.com
Client: Mr. Gene Ross — Elliott Merrill
Building Official: Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC. Bldg. Dept.
Contractor: Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun — Structure Con
Mr. Khris McConnell— Structure Con
File
Page 3 of 3
IF I 1
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3r Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 5694041
www.mleneineerineine. com
Project No.18-153
Client:
Building Official:
Contractor:
File
Report No. 1
Mr. Gene Ross- Elliott Merrill
Mr. Carl Peterson-SLC Bldg. Dept.
Mr. Bob Stark -Structure -Con
Mr. Gabriel Efrainsanjaun-Structure Con
Mr. Khris McConnell -Structure Con
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY A 1 A — NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
PROJECT NAME: Ocean Harbor South— Bldg. A DATE: October 08, 2018
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con PROJECT MGR: Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building
Balcony Repairs
OBSERVATIONS:
Units 201 &301
No work completed at this time
Unit 608
Demolition of the deteriorated concrete at the north column was completed, bars cleaned and coated with corrosion
inhibitor and column repaired.
The concrete was removed at the spalled edge. It appears that is was repaired in the past and the material did not
adequately bond with the surrounding original concrete. The exposed reinforcing bars at this area have minimal
deterioration but should still be cleaned and coated with the specified corrosion inhibitor.
Removal of the deteriorated concrete at the spall at the inside concrete column is in progress to fully expose the
corroded reinforcing bars prior to cleaning and coating with corrosion inhibitor.
Continue repairs as per the specs by mechanically cleaning all corroded reinforcing bars and coating with the specified
corrosion inhibitor prior to applying concrete repair mortar.
Pagel of 2
s
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37" Avenue
Vero Beach, Florida 32960
Phone: (772)569-1257
Fax: (772)569-4041
www.mleneineerinainc.com
Project No. 18-153
Client:
Building Official:
Contractor:
File
Report No. 1
Mr. Gene Ross- Elliott Merrill
Mr. Carl Peterson-SLC Bldg. Dept.
Mr. Bob Stark -Structure -Con
Mr. Gabriel Efrainsanjaun-Structure Con
Mr. Khris McConnell -Structure Con
Pic I
8xl6 concrete column at the north corner
Pic 2
Spall along south balcony edge
Pic 3
Spall at concrete column at inside comer
Page 2 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3V Avenue
Vero Beach, Florida 32960
Phunc: (772) 569.1257
Fax: (772) 569.4641
www. mlenginceringinc.com
Project No. 18-153 Report No. 2
Client: Mr. Gene Ross — Elliott Merrill
Building Official: Mr. Carl Peterson—SLC Bldg. Dept.
Mr. Andrew Manure — SLC Bldg. Dept.
Contractor: Mr. Bob Stark — Structure -Con
Mr. Gabriel Efrainsanjaun —Structure Con
Mr. Khris McConnell — Structure Con
File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH H WY A 1A — NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South —Bldg. A DATE: May 31, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: FL Pierce, FL
CONTRACTOR: Structure -Con PROJECT MGR: Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A —North Building balcony repairs at Units 201 & 301
OBSERVATIONS:
Unit 201
• The entire north and most of the east balcony edges require repair.
• The reinforcing bars are corroded behind the PT anchors and will require about 8 PT cables at the north slab
edge to be locked off and spliced with new anchors.
• The spalls at the doors extend under the door tracks, but these may be repaired without having to enter the unit.
• The aluminum screen enclosure at Unit 101 below will require removal to repair the slab edge above. (Need an
alternate price to replace with a new enclosure.)
Unit 301
• There is a significant amount of ceiling spalls at the underside of the Unit 301 floor slab as well as surface
spalls. Some of these areas will be full depth repairs if the repairs at the underside coincide with the upper
surface spalls.
• There are surface spalls along both sliding glass doors.
• There is evidence of previous repairs where a blue -colored bonding agent is visible.
• Consideration should be given to replace rather than repair the slab based on a cost comparison.
RECOMMENDATIONS:
Unit 201
• Continue the repairs as per the design plans.
• Coordinate with the PT specialist to lock off the required cables..
• Provide shoring during repairs as well as to re -shore Unit 301 above.
• Provide a cost difference to remove and re -install the existing screen enclosure (with new screens, Florida
panels and paint) vs, replacement with a new screen enclosure.
Unit 301
• Provide a cost comparison to repair the slab and/or to replace the entire slab. Keep in mind that all of the FT
cables will require replacement if the slab is repaired.
,e�eneeepes
°° `q.• •e. �10
47520 .�
A. Lue, t.ED�•- . 4- •
P:
�COft10
s,�SSYONAL e�tO° Page 1 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3r Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772)569-4041
www.rnlenginecrinainc.com
Project No. 18-153 Report No. 2
Client: Mr. Gene Ross —Elliott Merrill
Building Official: Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor: Mr. Bob Stark —Structure•Con
Mr. Gabriel Efrainsanjaun — Structure Con
Mr. Khris McConnell— Structure Con
File
Pic 1
North Building A looking south.
Units 101.201 & 301
Pic 2
Unit 201 balcony edge.
Corroded reinforcing behind the PT anchors which will
require locking off the cables and replacing the
anchors.
Pic 3
Typical PT anchor at slab edge at Unit 201.
Note:
The end of the PT cable was not cut short enough and
both the cable and anchor are corroded. These anchors
are also original anchors and are not encapsulated.
Corroded reinforcing bars behind the anchor which
require repairs or replacement.
Page 2 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3r Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: - (772) 5694041
w%%w. mleneineerine inc. corn
Project No. 18-153 Report No. 2
Client: Mr. Gene Ross —Elliott Merrill
Building Official: Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor: Mr. Bob Stark — Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McComell — Structure Con
File
View of the ceiling repairs needed at underside of Unit
301 slab.
Pic 5
Areas to be repaired at Unit 201 east slab edge.
Page 3 of 3
1
M L Engineering Inc.
Project No. 18-153
Report No. 3
Consulting Engineers
Client:
Mr. Gene Ross —Elliott Merrill
Threshold Inspector
Building Official:
Mr. Carl Peterson—SLC Bldg. Dept.
2030 37 ° Avenue
Mr. Andrew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960
Contractor:
Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257
Mr. Gabriel Effainsanjaun—Structure Con
Fax: (772) 5694041
Mr. Khris McConnell — Structure Con
w vw.mleneineerineinc.com
File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA —NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South — Bldg. A
CLIENT: Elliott Merrill Community Mgmt.
CONTRACTOR: Structure -Con
DATE:
June 20, 2019
LOCATION:
Ft. Pierce, FL
PROJECT MGR:
Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Bldg. A — North Building balcony repairs at Units 201 & 301
OBSERVATIONS:
Unit 201 & 301
• Decision was made to repair the deteriorated areas instead of replacing the entire balcony slabs.
• Demolition is complete and there were 8 PT cables that had to be locked off and spliced at each balcony.
There is one splice that is not covered with a protective PVC which is to be placed.
• Add #4 bar in the east west direction next to all bars that were cut to accommodate the cable lock off
connection. Provide a minimum of 24" lap splice.
• Remove miscellaneous abandoned aluminum handrail posts ends that were uncovered in the slab.
• Cut ends of bars back to maintain a minimum of 2" concrete cover from slab edges.
• Provide plastic chairs under the reinforcing mats to maintain the required concrete coverage
RECOMMENDATIONS:
If a ready mix concrete is going to be used for the slab pours instead of a Emaco 1061 EX bag mix repair mortar, a
suitable bonding agent such as Aquafin is to be used as well as MasterSeal Traffic 1500 polyurethane water proofing
system.
The ready mix concrete option shall be as follows:
5,000 psi high early strength pump mix
Max w/c ratio 0.4
Max slump 5" +/- I"
DCI corrosion inhibitor of 4.0 gal per cu yd
Shrinkage compensating agent to be included in mix
Concrete shall be tested at a minim of 7 days and 28 days and should have a minimum compressive strength of 4,000
psi prior to stressing PT cables.
Michael
.�fr�ty\UAI�PIP
I.CIQI Y }" tPI
c
Page 1 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37 ° Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 5694041
w vw.mlengineeringinc.com
Project No. 18-153 Report No. 3
Client:
Mr. Gene Ross — Elliott Merrill
Building Official:
Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor:
Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun— Structure Con
Mr. Khris McConnell — Structure Con
File
Pic 2
Units 201 & 301
Remove old guard rail post anchors and replace with
new ss tapcons with plastic protective caps.
Page 2 of 3
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37"Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 5694041
w vw.mlenaineerineinc.com
Project No. 18-153 Report No. 3
Client: Mr. Gene Ross — Elliott Merrill
Building Official: Mr. Carl Peterson — SLC Bldg. Dept.
Mr. Andrew Manew — SLC Bldg. Dept.
Contractor: Mr. Bob Stark— Structure -Con
Mr. Gabriel Efrainsanjaun — Structure Con
Mr. Khris McConnell — Structure Con
File
Page 3 of 3
�4
M L Engineering Inc.
Project No. 18-153
Report No. 4
Consulting Engineers
Client:
Mr. Gene Ross— Elliott Merrill
Threshold Inspector
Building Official:
Mr. Carl Peterson—SLC Bldg. Dept.
2030 37"Avenue
Mr. Andrew Manero — SLC Bldg. Dept.
Vero Beach, Florida 32960
Contractor:
Mr. Bob Stark— Structure -Con
Phone: (772) 569-1257
Mr. Gabriel Efrainsanjaun— Structure Con
Fax: (772) 569-4041
Mr. Khris McConnell — Structure Con
wwv.mlenoineeringinc.com
File
OCEAN HARBOR SOUTH CONDOMINIUMS
4250 NORTH HWY AIA — NORTH BLDG — BLDG. A
UNITS 201, 301, & 608
THRESHOLD INSPECTION REPORT
SLC BUILDING PERMIT NUMBER: 1808-0057
PROJECT NAME: Ocean Harbor South— Bldg. A DATE: July 24, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, FL
CONTRACTOR: Structure -Con
INSPECTED BY: Mike Luc
PROJECT MGR: Khris McConnell
WEATHER: Sunny
FINAL REPORT
Bldg. A — North Building balcony repairs at Units 201, 301 & 608.
OBSERVATIONS:
Structural repairs to the concrete balconies have been completed and the urethane deck coating has been applied to the
entire deck in substantial accordance with the design and permitted plans.
Unit 608
Repairs were completed in October 2018.
Units 201 & 301
Repairs completed July 2019.
RECOMMENDATIONS:
The following non-structural miscellaneous items are to be completed:
1. Replace two damaged sections of screening in the screen enclosure of Unit 101.
2. Place sealant at the gap at the top rail and underside of slab.
3. Paint floor slab on grade.
4. Touch up paint the walls where required at Units 201 & 301.
5. Provide aluminum clip angle at the bottom rail to the comer post at Unit 201.
6.. Clean slab in front of the east SGD at Unit 201.
Michael
.anyrrr
Page 1 of 2
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 3r Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 5694041
www.ndeneineerineinc.cont
Project No. 18-153 Report No. 4
Client: Mr. Gene Ross — Elliott Merrill
Building Official: Mr. Carl Peterson —SLC Bldg. Dept.
Mr. Andrew Manero — SLC Bldg. Dept.
Contractor: Mr. Bob Stark —Structure -Con
Mr. Gabriel Efrainsanjaun—Structure Con
Mr. Rhris McConnell —Structure Con
File
Pic 2
Unit 301 - Repaired balcony slab.
Touch up paint at base of wall.
Page 2 of 2