Loading...
HomeMy WebLinkAboutMISC LETTERSTRUCTURE -CON FEB 0 8 2019 CST. Lucie County, Permitting Infrastructure Repair Specialists P.O. Box 2626 SCANNED Okeechobee; FL 34973 BY (772)-215-8631 St. Lucie County structurcon@aol.com CGC061033 ✓1 14C Flon4eow,7P{ f a bvor k C#Vj ! "I r _rAkA)le C04 Aq1 V,C) Pr..H �f ��sos•oa�� 7bu 1y Co ^plf,4,w. 6 dos w e C,?n e4 A, S C/ ���` Planning & Development " Services t OCT 0 M L Engineering Inc. 2030 —3711 Avenue rye CEfv i~ ® Vero Beach, Florida 32960 RG\•r Phone: (772) 569-1257 Fax: (772) 569-4041 October 2, 2019 St. Lucie County Building Department Planning & Development Services 2300 Virginia Avenue Ft. Pierce, FL 34982 SCANNED ATTN: Mr. Gary Stepalavich, Building Official BY St. Lucie County RE: Ocean Harbor S Condo — Balcony Repairs Unit 1009 4200 N Hwy AlA — Bldg. B — South Bldg. Ft. Pierce, FL 34949 Engineer's Project No.: 16-175C St. Lucie County Bldg. Permit No. 1808-0056 Dear Mr. Stepalavich, Please see the enclosed signed and sealed threshold inspection report for the above noted project. Copies of this report have been emailed to the parties listed below. If you should need anything further, please do not hesitate to contact our office. Thank you. Respectfully, - /I - I , "'k Christine Jackman Office Manager.` Encl: Threshold Report #2 dated 10/01/19 Cc: Gene Ross — Elliott Merrill Bob Stark — Structure -Con Gabriel Efrainsanjuan — Structure -Con Khris McConnell — Structure -Con M L Engineering, Inc. 2030 37w Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 1 M L Engineering Inc. 2030 —3711 Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 August 26, 2019 St. Lucie County Building Department Planning & Development Services 2300 Virginia Avenue Ft. Pierce, FL 34982 ATTN: Mr. Gary Stepalavich, Building Official RE: Ocean Harbor S Condo — Balcony Repairs Unit 1009 4200 N Hwy AIA —Bldg. B — South Bldg. Ft. Pierce, FL 34949 Engineer's Project No.: 16-175C St. Lucie County Bldg. Permit No. 1808-0056 Dear Mr. Stepalavich, Please see the enclosed signed and sealed threshold inspection report for the above noted project. Copies of this report have been emailed to the parties listed below. If you should need anything further, please do not hesitate to contact our office. Thank you. Respectfully, C 'tine Jackman Office Manager Encl: Threshold Report #1 dated 08/23/19 (� M Cc: Gene Ross — Elliott Merrill FA! i5Bob Stark — Structure -Con Gabriel Efrainsanjuan—Structure-Con 215 2019 Khris McConnell — Structure -Con M L Engineering, Inc. 2030 37a Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 1 M L Engineering Inc. 2030 —37" Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 5694041 RECEIVED N N c y AUG 0 2 2018 2 June 12, 201 m ST. Lucie County, Permitting G [] Mr. Joe Cicio, Plans Examiner St. Lucie County Building Department 2300 Virginia Ave. Fort Pierce, F134982 Re: Ocean Harbor South Condominiums — Concrete Balcony Repair (Unit 1009) 4200 North Highway AIA Building B (South Building) Fort Pierce, Florida 34949 Project No: 16-175C Dear Mr. Cicio, Please be advised that M L Engineering, Inc. has been retained to provide Special Inspection services for the concrete repairs to the balconies at Ocean Harbor South. Copies of all inspection reports will be forwarded to all respective parties as well as the St. Lucie Building Department. If there are any questions, please contact our office. Respectfully, Mich"el Lue, P.E. StrucCai Engineer FL PE. 47520 Threshold'Inspector S 1 1061 Cc: Bob Stark — Structure Con Gene Ross — Elliot Merrill G October 31, 2019 St. Lucie County Building Department Planning & Development Services 2300 Virginia Avenue Ft. Pierce, FL 34982 RE: Ocean Harbor S Condo — Balcony Repairs Unit 1009 4200 N Hwy AIA — Bldg. B — South Bldg. Ft. Pierce, FL 34949 Engineer's Project No.: 16-175C ® acre •o ntv ermr o 1$08-005 To Whom It May Concern, M L Engineering Inc. 2030 —371" Avenue Vero Beach, Florida 32960 Phone: (772)569-1257 Fax: (772) 569-4041 0.ECENED NOV 0 4'1011 Permitting Luca county nt This letter shall serve as certification that to the best of our knowledge, the structural repairs have been constructed in substantial conformance with the design documents and specifications as duly noted in our field reports. Site Visits & Threshold Inspection Reports for the above referenced project were performed from August 23, 2019 to October 31, 2019. Copies of all field reports were distributed to Property Management, the St. Lucie County Building Department, the Contractor, and the Engineer of Record. If you should need do not hesitate to contact our office. Thank you. IN Tye'•., Respectfully,•4.V`ZP• E N S' • �••�� No 47 20 S Michael Lue, T ConsultingEngxjexI.�s ••:QR1�p'•�'�� Threshold lnspecC9ysS/�NAL�NG Encl: Threshold Reports #1-3 Cc: Mr. Gene Ross — Elliott Merrill Mr. Bob Stark —Structure -Con Mr. Khris McConnell — Structure -Con Khris McConnell — Structure -Con M L Engineering, Inc. 2030 37tb Ave. Vero Beach, FL 32960 ph (772) 569-1257 / fax (772) 569-4041 Page 1 M L Engineering Inc. Project No. 16-175C Report No. 3 Consulting Engineers Client: Mr. Gene Ross — Elliott Merrill Community Mgmt. Threshold Inspector Building Official: SLC Bldg. Dept. 2030 371, Avenue Contractor: Mr. Bob Stark — Structure -Con Vero Beach, Florida 32960 Mr. Khris McConnell— Structure -Con Phone: (772) 569-1257 File Fax: (772)569-4041 www.mlengineeringinc.com THRESHOLD INSPECTION REPORT OCEAN HARBOR SOUTH CONDOMINIUMS —BALCONY REPAIRS UNIT 1009 4200 NORTH HWY AIA, FT. PIERCE, FL 34949 SLC BUILDING PERMIT NUMBER: 1808-0056 PROJECT NAME: Ocean Harbor S. Condos — Unit 1009 DATE: October 31, 2019 CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Structure -Con PROJECT MGR: Mr. Khris McConnell INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Building B - South Building, Unit 1009 — Final inspection OBSERVATIONS: All repairs have been competed in substantial compliance with the design and permitted plans. The deck coating and stucco repairs are complete. The guard rails have been re -anchored with new stainless steel bolts and caps where the edge was repaired. The shutters and tracks have been re -installed. Unit 1009 Completed repaired balcony floor slab. Page 1 of 1