HomeMy WebLinkAboutPROJECT INFORMATIONWORKS TO DO UNDER
THIS PERMIT
- Electrical: new wiring and electric service on the house.
- Roof: repair and replace roof singles.
-A/C: replacement system (condenser, compressor and repair
existent ducks).
- Plumbing: replacement cooper line for PVC.
- Insulation: new insulation in roof and walls.
- Drywall: new Drywall.
- Floors: floors renovation.
- Framing: repair existent framing.
- Painting.
- New cabinets and vanities.
Danie arin
Alpha Design Contractor LLC
SCANNED
BY
St. Lucie County
This AGREEMENT is made this 2 day of September, 2016 by and between
SEGUNDO MALDONADO hereinafter (OWNER Adress 5407 S. Indian River Dr.
Fort Pierce <FI 34982) to RENOVATION a single family house located in 4905
Paml Dr. Fort Pierce. FL 34982, and Alpha Design Contractor LLC (CBC License #
1256205) located in 1492 SE Belcrest St. Port Saint Lucie, FL 34952. (General
Contractor hereinafter Contractor).
The Owner and Contractor agree as set follows: 6CANNED
BY
1: Description of Services. Work and Insurance: >t. Lucie County
Beginning on 2 day of September, 2016 the Contractor will provide the following services:
Construction administration to build a single family home according to the State of Florida Laws
and Codes and permits from the City of Port Saint Lucie at the address above described. The
work will begin promptly after both parties sign and agrees with this Contract and all permits
have been issued and it will be completed within a reasonable time frame according to
inspections.
Contractor shall maintain at Contractor's own expense, all necessary workers'
compensation and liability insurance required for construction laws to protect Contractor from
claims for damages because of bodily injury, including death, and for damages to property that
may arise both out of and during operations under this contract. A copy of Contractor's license
and all respective insurances are attached as Exhibit B.
BUILD RISK INSURANCE: provide for L & M Project.
Contractor Must have in good standing before the beginning of the job, all the necessary
and valid Insurances require by Federal and local Laws and shall give proof to the Company.
The work shall be done substantially in conformance with the plans and specifications
that have initialed or signed by each party in this contract. If a conflict exits between plans and
specifications, the plans shall govern. These plans and specifications are attached to this
contract and incorporated into it as Exhibit A.
2: Payment for Services:
Company will pay to the Contractor (who is fully licensed and insured) for the services in the
amount of $ 15,500 (Fifteen Thousand Five Hundred dollars) . This fee is to be paid in advance
to pull the necessary permits for construction under company's name, license and responsibility
and full management control.
V
Contractor will visit the jobsite three times a week or when its necessary and Must to keep his
license as a General Contractor with all insurances in good standing until finish the work
described in number (1).
Materials provided for the owner, the current contract price is for labor only.
3: Supervision:
Both parties agree that the supervision of the work performed under this Agreement is under
the exclusive direction of the Developer/Owner, and supervising by the Project Manager.
Contractor shall have control over construction means, methods, techniques, sequences and
procedures and for coordinating all portions of the work. All the work shall be done by
Subcontractors under General contractor and Project Manager supervision as well.
Subcontractors must be hire by Developer/Owner's discretion according to the Florida Law.
4.- Company's Obligations:
Company shall (a) furnish all surveys describing the physical characteristics and utility locations
for the residence and (b) secure and pay for easements necessary for the completion of the
work. Company shall furnish information and services under their control to Contractor
promptly to avoid delay. Company shall provide and pay for all permits, drawings, engineering
labor, materials, equipment, tools, construction equipment and machinery, transportation,
dumpsters, debris hauling, portable sanitary, facilities and other services necessary for the
proper execution and completion of the residence.
S: Drawings. Permits and Fees:
Owner shall be responsible for all fees and permits.
6: Iniuries•
The Contractor waives any rights to recovery from the Company for any injuries that the
Contractor (and /or Contractor's employees) may sustain while performing services under this
Agreement and that are a result of the negligence of the Contractor or the Contractor's
employees. Contractor shall provide to the Company with all insurance information to perform
his job.
7: Indemnification:
The Contractor agrees to indemnify and hold harmless the Company from all claims, losses,
expenses, fees including attorney fees, costs and judgements that may be asserted against the
Company that result from the acts or omissions of the Contractor, the Contractor's employees
if any.
8: No right to Act as.an agent or Supervisor:
The Contractor has no right to act as an agent, supervisor or on behalf of the Company at all.
9: Termination:
This agreement will terminate automatically when the job have been performed satisfactorily
according to this agreement and to the Florida Laws unless Contractor fails to supply proper
materials and skilled workers; disregards ordinances, regulations, or orders of a public
authority; or fails to materially comply with the provisions of the contract, Company may give
Contractor written notice to terminate. After seven (7) days if Contractor has failed to remedy
the breach of contract, Company can give a second notice to terminate. If Contractor still fails
to cure the breach within three (3) days after the second notice, Company may terminate the
contract and act according to the Florida Law.
10: Governing Law and Assignment:
This Agreement will be construed, interpreted and applied according to the law of the State of
Florida, United States of America. This contract shall not be assigned without the written
consent of all parties and Contractor shall not leave the job before completion under penalty.
11: Effective Date and Signature:
This contract shall become effective on the day it is signed by both parties.
12: Warranties:
Contractor agrees to promptly make good, without cost to Company, any and all defects due to
faulty workmanship and/or materials which may appear within one (1) year from the date of
completion and acceptance of the work by Company.
13.- Right to Cure:
FLORIDA LAW CONTAINS IMPORTANT REQUIREMENTS YOU MUST FOLLOW
BEFORE YOU MAY FILE A LAWSUIT FOR DEFECTIVE CONSTRUCTION AGAINST A
CONTRACTOR, SUBCONTRACTOR, SUPPLIER, OR DESIGN PROFESSIONAL FOR AN
ALLEGED CONSTRUCTION DEFECT IN YOUR HOME. SIXTY DAYS BEFORE YOU FILE
YOUR LAWSUIT, YOU MUST DELIVER TO THE CONTRACTOR, SUBCONTRACTOR,
SUPPLIER, OR DESIGN PROFESSIONAL A WRITTEN NOTICE OF ANY CONSTRUCTION
CONDITIONS YOU ALLEGE ARE DEFECTIVE AND PROVIDE YOUR CONTRACTOR AND
ANY SUBCONTRACTORS, SUPPLIERS, OR DESIGN PROFESSIONALS THE
OPPORTUNITY TO INSPECT THE ALLEGED CONSTRUCTION DEFECTS AND MAKE AN
OFFER TO REPAIR OR PAY FOR THE ALLEGED CONSTRUCTION DEFECTS. YOU ARE
NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE CONTRACTOR OR ANY
SUBCONTRACTORS, SUPPLIERS, OR DESIGN PROFESSIONALS. THERE ARE STRICT
DEADLINES AND PROCEDURES UNDER FLORIDA LAW.
We the undersigned, have read, understand and agree to each of the provisions of this contract
and hereby acknowledge receipt of a copy of this contract.
SIGNED THIS 50P m bP v DAY OF A 20L.6--.
D• D• I 01I pis
OWNER
Daniel Marin (General Contractor) on
behalf of Alpha Design Contractor LLC.
y Planning & Development_ vices
----Building-&-Code-Regulation-Division-
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
Request for 30-Day Temporary Power Release
October 19 2017
Date
Permit Number:
Project Address: 4905 PALM DRIVE, FORT PIERCE, FL34982
1609-0198
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release is requested for the above stated purpose only, and there will be no
occupancy of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is incorporated herein by reference.
3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have been fulfilled and the premise is ready for compliance inspection.
4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating
the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
LALW� ✓o /9
OWNER SIGNATURE DATE
/O//y/mod /3
GENERAL CO CTOR SIGNATURE DATE-
1o7C71 Zalq
ELECTRICAL CONTRACTOR SIGNATURE _ DATE
SCANNED
BY
St. Lucie County