PROPOSAL -CONTRACT
August 16, 2018
Elliott Merrill Community Mgt.
The Breakers
4949 N AlA
Fort Pierce, FL 34949
(772)-569-9853
REF: Unit 151 -Greco Residence
SC,1NNEjD
B,v
St. LUC. Y
ie COunty
Thank you for the opportunity to bid the roofing maintenance at the above referenced site. Our scope of work
includes the following:
1 . Tear off existing balcony roof down to sheathing boards and remove debris from jobsite.
2. Nail existing sheathing to code as needed.
3. Install 1 -ply Polyglass SAV direct to deck.
4. All flashings to be 16zo copper.
5. Install I -ply Polyglass SAP over SAV. All laps to be heat welded.
TotaI Price — $2,350.00
Terms: 100% due upon completion
VERO BEACH ROOFING, INC.
By: Rick Gordon
TERMS: Cash. Invoice based on the terms noted above for the value of materials used and labor performed during the preceding
week. Balance of contract price due in full upon completion of work included herein
'ons b e 'so e if materials are not available at t' me 0' application
n acce led t' n6 da s
'a 6 0 tio y beyond ou r control
ct to c ev' n if at p d b nd
su ' t to r so
a on subec
b on e f a
in
y ficati 'I, b d at ten d be he b d ng is ready for our work so that all
c n
8 S' 0 a d rg , cause y t t I. -Y. for. t 'I
3' ma'esp , material an - an �e ou r crew n on - a requ r. a
, 1.0", mucus ope,.bo,
n b Y d" ont
precautn, d Ung , clement weather when re ; "orr� however , we "' not to be held responsible for intenor damage to building, including
.h,.g s and person. be 'gm . , n progre s t , work
m rop" I s I I. g d n g of r I to t
n 'o"t a , acmptd , please sign and retu in on, copy. w .h w'I be 0, r order Proceed with he work, and when approved by our credit
tut" the "tire 'ontract lnvo,�, to 6, Paid pr 'PUY upon .Plebqn of work sp.cfld h 'rm
Accepted BQJL �Q�