STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
CIVIL . STRUCTURAL . SURVEYING . ENVIRONMENTAL N (P
C) Project Name: Visions - North Garage Concrete Repairs
1835 20th Street -Vero Beach, FL 32960 G �2
772.S69.0035 • Fax: 772.778.3617 %'
www.mbveng.com N - , Inspection Date: 2/25/2019
CAP3728 � O Weather: Sunny
Owner: Visions Condominium -Association Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villamizar, P.E.
Project Address: 4000 N AIA, Fort Pierce, FL 34946 Qualified By: Rodolfo Villamizar, P.E.
Location: North Garage Discipline: Special T�'•in cinmvh Ald
Type of Inspection: Initial Partial Final Reins.
Demolition
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
POSITION OF INSPECTION (all pending inspections require a
IADDroved I (Approved as Noted 7_1
Metal Floor Decking
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation
Drvwall. TVDe, Fastenin¢. RatinE. etc.
Stucco Application In -Progress
Stucco Aoplication Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framin¢ & Glazing
Window & Door Bucks
Window & Doors
Structural Final
Other (Use Additional member/Area
Pending
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above): -
Observed the concrete demolition extent for approx. 80 LF out of the estimated 120LF of existing roof tie beam
to be repaired along the north exposure. Observed the in -place coated reinforcement framing and the condition
of the existing truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed Contractor to install an addA HETA embedded truss anchor to each of the
affected roof trusses along the repaired areas.
Instructed Contractor to install a moisture barrier under each truss along ft rppailpd areas.
NOTES: The observed beam repair areas are ready for cd�Ye plazesq,�rti4f tt approved
concrete materials. I y
—� 1
A 0, STATE O
INSPECTOR: Rodolfo Villamizar, PE 61000, Si 7021620 JCETft'&& p r, t9 6 000, 517021620
ll
��////f lll 1100 ��
iM M Bar
ENGINEERING, INC.
MOIA BOWLES V ILLAMIZAR & ASSOCIATES
CIVIL • STRUCTURAL • SURVEYING • ENVIRONMENTAL
1835 20th Street • Vero Beach, FL 32960
772.S69.0035 • Fax: 772.778.3617
www.mbveng.corn
CA #3728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/5/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villamizar, P.E.
Project Address: 4000 N AIA, Fort Pierce, FL 34946 Qualified By: Rodolfo Villamizar, P.E.
Location: North Garage Discipline: Special Thresheld
Type of Inspection: Initial Partial Final Remy eet`._=^
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
X CMU wall Erection/Placement, Fill Cell Rebar, Horiz 1.R.
Concrete Masonry Unit Fill Cell
Concrete Beam Reinf. Steel, Foi
Concrete Placement for Beam(.
Roof Sheathing, TypE
Exter. Wall Framing,
Wall Sheathing, Blod
Interior Framing and
etc.
Metal Floor Decking
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation -
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
traints, etc. Storefront Framing & Glazing
Window & Door Bucks
Is, etc. Window & Doors
etc. Structural Final
X Other (Use Additional member / Area
inspections require a re -inspection)
as Noted
Pending
Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately 40 LF of existing roof tie beam in the eastern end
along the north exposure. Observed the in -place coated reinforcement framing and the condition of the existing
truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed Contractor to install an add.4 HETA embedded truss anchor to each of the
affected roof trusses along the repair area.
Instructed Contractor to install a moisture barrier under each truss along,> N'0__ iWtpp,
v 1i
NOTES: The observed beam repair area is ready for conci lad en e`Ffr1 ) oved
concrete materials. No. 61000 '•, �,
r
7 STATE
i
/ 0.o'a�MK::�7 G -2_7-1
INSPECTOR: Rodolfo Villamizar, PE 61000, S17021620 ICERTI %r, 000, 517021620
///llllll\W
i= M Bar'
ENGINEERING, INC.
MOIA BOWLES YILLAMIZAR &ASSOCIATES
CML . STRUCTURAL • SURVEYING • ENVIRONMENTAL
1835 20th Street -Vero Beach, FL 32960
772.569.0035 • Fax: 772.778.3617
www.mbveng.com
CA #3728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/12/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villomizar, P.E.
Project Address: 4000 N A1A, Fort Pierce, FL 34946 Qualified By: Rodolfo Villomizar, P.E.
Location: North Garage Discipline: Special T''� eghn'vhn'd
Type of Inspection: Initial Partial - Pinal Rekspe_`-'._::
X IDemolition
I
Metal Floor Decking
Foundation Concrete Placement
Metal Roof Decking
Concrete Slab (SOG) Reinforcing Steel Placement
Structural Steel Column(s) Erection
Concrete Slab (SOG) Concrete Placement
Structural Steel Horizontal Framing
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Structural Steel Connections
Elevated Concrete Slab Concrete Placement
Wire Lath / Hock Lath
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Insulation
Concrete Placement for column(s)
Drywall, Type, Fastening, Rating, etc.
X
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Stucco Application In -Progress
Concrete Masonry Unit Fill Cell grouting
Stucco Application Final
X
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Exterior Veneers, Size, Type, Attachments
Concrete Placement for Beam(s)
Curtain Wall Framing &Glazing
X
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Storefront Framing & Glazing
Roof Sheathing, Type, Fastening
Window & Door Bucks
Exter. Wall Framing, Blocking, Connections, etc.
Window & Doors
Wall Sheathing, Blocking, Vapor Barriers, etc.
IStructural Final
Interior Framing and Firestopping
I X
10ther (Use Additional member/ Area Below)
DISPOSITION
OF INSPECTION (all pending inspections require a re -inspection)
❑Approved as Noted = Pending Rejected
IDApproved
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately40 LF of existing roof tie beam in the western end
along the north exposure. Observed the in -place coated reinforcement, the additional HETA truss anchors and
the installed moisture barrier under each truss.
VERBAL INSTRUCTIONS:
NOTES: The observed beam repair area is ready for co kWc 1;e pl &'m nt of th& alpproved
concrete materials. _ ,,', ; I,
�i`50•. FCOR\O
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620
517021620
i= M B `
ENGINEERING, INC.
MOIA BOW LES V ILLAMRAR a ASSOCIATES
CIVIL . STRUCTURAL • SURVEYING • ENVIRONMENTAL
1835 20th Street • Vero Beach, FL 32960
772.S69.0035 • Fax: 772.778.3617
www.mbveng.com
CA #3728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/14/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villomizar, P.E.
Project Address: 4000 N AIA, Fort Pierce, FL 34946 Qualified By: Rodolfo Villomizar, P.E.
Location: North Garage Discipline: Special
Type of Inspection: tnitial Partial Final Reinspection
X
Demolition
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
CMU wall Erection/Placement, Fill Cell Rebar, Horiz 1.R.
Concrete Masonry Unit Fill Cell grouting
X
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
X
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
Metal Floor
Metal Roof Decking
Structural Steel Column(s) Erection
Structural Steel Horizontal Framine
Structural Steel Connections
Wire Lath / Hock Lath,
Insulation
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window & Door Bucks
Window & Doors
Structural Final
X 10ther (Use Additional member / Area Below)
DISPOSITION OF INSPECTION (all pending inspections require a re -inspection)
EflApproved Approved as Noted = Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately 5 LF at unit 22, 3.25 LF at unit 21, and 9 LF at unit 20
of existing roof beam in the eastern end along the south exposure. Observed the in -place coated reinforcement
framing, new hurricane straps and the condition of the existing truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed contractor to provide #3 ties spaced @ 6" O.C. for 6FT along the beam ends
and #3 ties spaced @ 12" O.C. along the middle third of the beam. t t 1 { I I I I t
V IL1
i4� E IN
NOTES: The observed beam repair areas are ready for coq-Ei, e'pla_cfaerrj9pf tR^5p roved
concrete materials.
STATE
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTIFIED /fit,,YON'26kPE W, 517021620
mom M BA
ENGINEERING, INC.
MOIA 6O`NLES VILIAM1Z R A ASSOCIATES
CNIL a STRUCTURAL. SURVEYING e ENVIRONMFNTW.
1835 20th Street -Vero Beach, FL 32960
772.569.003S C Fax: 772.778.3617
www.mbveng.com
CA #3728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 2/25/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villamizar, P.E.
Project Address: 4000 N A1A, Fort Pierce, FL 34946 Qualified By: Rodolfo Villamizar, P.E.
Location: North Garage Discipline: Special T#esheld
Type of Inspection: Initial Partial Final Rewmaeetian
X
Demolition
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
X
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
X
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
X
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Exter. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
Metal Floor
Metal Roof
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window & Door Bucks
Window & Doors
Structural Final
X Other (Use Additional member / Area Below)
DISPOSITION OF INSPECTION (all pending inspections require a re -inspection)
EDApproved Approved as Noted = Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approx. 80 LF out of the estimated 120LF of existing roof tie beam
to be repaired along the north exposure. Observed the in -place coated reinforcement framing and the condition
of the existing truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed Contractor to install an add.1 HETA embedded truss anchor to each of the
affected roof trusses along the repaired areas.
Instructed Contractor to install a moisture barrier under each truss along the repairgglaggy I
TI. f,7.
NOTES: The observed beam repair areas are ready for concrete j*q E r&Attte a}3�goGe1!
concrete materials.
'P
a , o.
STPT OF
i
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTIFIED BY*, • 1 ar,' 0 21620
//lllllllll��
w M BV
ENGINEERING, INC.
MOIA SOWLESVILLAMIZ K&ASSOCIATES
CML • STRUCTURAI. ® SURVFYING n ENVIRONMENTAI
1835 20ch Street • Vero Beach, FL 32960
772.569.0035 • Fax: 772.778.3617
www.mbveng.com
CA 93728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/5/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villamizar, P.E.
Project Address: 4000 N A1A, Fort Pierce, FL 34946 Qualified By: Rodolfo Villamizar, P.E.
Location: North Garage Discipline: Special TJaresheld
Type of Inspection: lnitW Partial Final Reinspeetien
Demolition
I (Foundation Concrete Placement
Metal Floor DeI
Metal Roof Dec
Concrete Slab (SOG) Reinforcing Steel Placement
IStructural
Steel Column(s) Erection
Concrete Slab (SOG) Concrete Placement
Structural Steel Horizontal Framing
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Structural Steel Connections
Elevated Concrete Slab Concrete Placement
Wire Lath / Hock Lath
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Insulation
Concrete Placement for column(s)
Drywall, Type, Fastening, Rating, etc.
X
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Stucco Application In -Progress
Concrete Masonry Unit Fill Cell grouting
IStucco Application Final
X
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Exterior Veneers, Size, Type, Attachments
Concrete Placement for Beam(s)
Curtain Wall Framing & Glazing
X
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Storefront Framing & Glazing
Roof Sheathing, Type, Fastening
Window & Door Bucks
Exter. Wall Framing, Blocking, Connections, etc.
Window & Doors
Wall Sheathing, Blocking, Vapor Barriers, etc.
Structural Final
Interior Framing and Firestopping
I X
10ther (Use Additional member / Area Below)
DISPOSITION
OF INSPECTION (all pending inspections require a re -inspection)
nApproved as Noted F 1 Pending nRejected
nApproved
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately 40 LF of existing roof tie beam in the eastern end
along the north exposure. Observed the in -place coated reinforcement framing and the condition of the existing
truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed Contractor to install an add.'( HETA embedded truss anchor to each of the
affected roof trusses along the repair area. ,�\\tll l llli/ir,
Instructed Contractor to install a moisture barrier under each truss along t*YjQpiNA e44? //,-
0
NOTES: The observed beam repair area is'ready for concretezpheinent gf4Wapp?o4ei_
concrete materials.
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620
i qp'. SSP�
0�,�,,FLORt.•�c1
—
CERTIFIED BY: dil, E 61 00, l 0 1620
i
Uffil Bel
ENGINEERING, INC.
MOIA BOWLES VILLAMIZAR & ASSOCIATES
CPAI. c STRUCTURAL. v SURVFYING e EKviRONMFNTAI..
1835 20th Street -Vero Beach, FL 32960
772.569.0035 Y Fax: 772.778.3617
www.mbveng.com
CA #3728
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/12/2019
Weather: Sunny
Owner: Visions Condominium Association Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villamizar, P.E.
Project Address: 4000 N A1A, Fort Pierce, FL 34946 Qualified By: Rodolfo Villamizar, P.E.
Location: North Garage Discipline: Special ThFP914,.'a
Type of Inspection: InitFal Partial T•IFA R6 weetian
X
Demolition
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
X
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell grouting
X
Concrete Beam Reinf. Steel, Formwork, Embeds, etc.
Concrete Placement for Beam(s)
X
Roof Trusses, Systems, Bracing, Uplift Restraints, etc.
Roof Sheathing, Type, Fastening
Eller. Wall Framing, Blocking, Connections, etc.
Wall Sheathing, Blocking, Vapor Barriers, etc.
Interior Framing and Firestopping
Metal Floor
Metal Roof
Structural Steel Column(s) Erection _
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Insulation
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framing & Glazing
Storefront Framing & Glazing
Window & Door Bucks
v & Doors
ral Final
Use Additional member / Area
DISPOSITION OF INSPECTION (all pending inspections require a re -inspection)
�X Approved Approved as Noted = Pending Rejected '
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately 40 LF of existing roof tie beam in the western end
along the north exposure. Observed the in -place coated reinforcement, the additional HETA truss anchors and
the installed moisture barrier under each truss.
VERBAL INSTRUCTIONS:
\11111II//
\\ VIL Al�j
NOTES: The observed beam repair area is ready for concrete pla; *tE VApp- r-0-XI %
v is
concrete materials.
1
i00
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTIFIED BY: lirTl � WIZ 0, 5 MA 620
o- M Bar
ENGINEERING, INC.
MOIA BOWLES VILAMIZAR &ASSOCIATES
CML • STRUCTURAI. • SURVF-YING • ENVIRONMFNTAI.
1835 20th Street • Vero Beach, FL 32960
772.569.0035 - Fax: 772.778.3617
www.mbveng.com
CA 93728
Owner: Visions Condominium Association
STRUCTURAL INSPECTION REPORT
Project Number: 18-0159
Project Name: Visions - North Garage Concrete Repairs
Inspection Date: 3/14/2019
Weather: Sunny
Permit #: SLC 1809-0350
Contractor: American Environmental & Restoration Inspector: Rodolfo Villomizor, P.E.
Project Address: 4000 N A1A, Fort Pierce, FL 34946 Qualified By: Rodolfo Villomizor, P.E.
Location: North Garage Discipline: Special Thy ghAIa
Type of Inspection: Initial Partial €inel Reinspection
Foundation Concrete Placement
Concrete Slab (SOG) Reinforcing Steel Placement
Concrete Slab (SOG) Concrete Placement
Elevated Concrete Slab Reinfor. Steel Placement; forms, etc.
Elevated Concrete Slab Concrete Placement
Concrete Columns, Walls Reinf. Steel, Formwork, Embeds
Concrete Placement for column(s)
CMU wall Erection/Placement, Fill Cell Rebar, Horiz J.R.
Concrete Masonry Unit Fill Cell aroutine
I X IConcrete Beam Reinf. Steel, Formwork, Embeds, etc.
Placement for
Floor
Roof
Structural Steel Column(s) Erection
Structural Steel Horizontal Framing
Structural Steel Connections
Wire Lath / Hock Lath
Drywall, Type, Fastening, Rating, etc.
Stucco Application In -Progress
Stucco Application Final
Exterior Veneers, Size, Type, Attachments
Curtain Wall Framine & Glazine
Roof Trusses, Systems, Bracing, Uplift Restraints, etc. IStorefront Framing & Glazing
Roof Sheathing, Type, Fastening Window & Door Bucks
Exter. Wall Framing, Blocking, Connections, etc. Window & Doors
Wall Sheathing, Blocking, Vapor Barriers, etc. Structural Final
Interior Framing and Firestopping X Other (Use Additional member / Area
ul)rubl l wry ur iN:)Ftu 1ury lau penaing inspections require a re -inspection)
�X Approved Approved as Noted = Pending Rejected
ADDITIONAL INFORMATION ON MEMBER/AREA INSPECTED (From inspection items above):
Observed the concrete demolition extent for approximately 5 LF at unit 22, 3.25 LF at unit 21, and 9 LF at unit 20
of existing roof beam in the eastern end along the south exposure. Observed the in -place coated reinforcement
framing, new hurricane straps and the condition of the existing truss hurricane anchors.
VERBAL INSTRUCTIONS: Instructed contractor to provide #3 ties spaced @ 6" O.C. for 6FT along the beam ends
and #3 ties spaced @ 12" O.C. along the middle third of the beam.
NOTES: The observed beam repair areas are ready for concrete oIace*@NVf the-aariWad i.
concrete materials.
;(P, F W��:z Z
INSPECTOR: Rodolfo Villamizar, PE 61000, SI 7021620 CERTIFIED BY: Rodpi df lgrn3 @ , 7 2162