HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPlanning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
�lj , CONSTRUCTION SOIL TREATMENT
0)4
PERMIT #:
BUILDER/CONTRACTOR: A4a
PEST CONTROL CONTRACTOR!
PEST CONTROL LICENSE#: JB175775
*41'
'14 "��o
C 04".-
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: - 3 cc
Percentage of solution: .05%
Date of Treatment: 4/��//!a
I
Footing
1st Treatment
Re -Treat
Driveway
1st Treatment
Re-Trpalt,,f
Ciiher I A 0 t
1st Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: S (3
Time of Treatment:
Slab
1't Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
A 5
lm
041,
Final Inspection ,
of Exterminator
r-li
Note., 7here must be a completed form for each requirba'freatment or re -treatment and this form must be on thejob
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Cel-Mcate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board
shall be provided to recelve duplicate Treatment Certiftates as each requiredprotective treatment Is completed,
providing a copy for the person the pemilt Is Issued to and another copy for the bullding permit files. 7he Treatment
CettlAcate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
treatect chemical used, percent concentration and number of gallons used, to establish a venrlable record of
protective treatment if the soll chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CID, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014