HomeMy WebLinkAboutRIGHT OF WAY PERMIT APPLICATION FORM_ t SCANNED
BY
St. Lucie County
RIGHT-OF-WAY PERMIT APPIJCATION FORM
ST.LUCIE COUNTY ENGINEERING DIVISION
Z300 VIRGINA AVENUE. 2'" FLOOR, FT. PIERCE, FL 349B2 (772) 462-1707
Submit via email at: Righ INVjI y_tjtnitfiistlncie_co.�
NAME OF APPLICANT _R q
Lt c
MAILING ADDRESS!tQQ tXffJ JYT 4'-Cf117Y j, V
cITY W t G yn R mch STATE _ T'L ZIP �""
EMAILyY aQ (0.1)QJW1/IhQ � PHONENO. ,$b -(Ji1D 1
TYPE OF PROJECT (CHECK ONE) ❑UTILITY ----COMMERCILSI.❑RESIDENTIAL 0 DEVELOPMENT ORDER (other)
Name of OWNER responsible tur facility alley installation_ �MiA1'-COfO (orollt•t' Qd! Aj1p+
PhoneN 'L 4- 2- 1-7'2- EMAIL_
PERMITTEE'S REPRESENTATIVE RESPONSIBLE FOR ADMINISTERING WORK WITHIN COUN/T'Yr RIGHT-OF-WAYAND
NOT'IFYING���I�OnIE NTY I !C� I� PHONE NO
MINIMUM OF 24 HOURS PRIOR1 ��LVI lI ;O�T lX NAME M�ty{yty��ll 11 111 I
1 \
Work shall commence on or about 040h(r 2,1 1018 with a duration of ) Z O days. (?4-hones prtornorrrerrquirerfj
CONTRACTOR'S NAME- R
��� � m Yi oa e " L
MAILING ADDRESS. 4n f) J6X-� tit- C ti7 I)r , .QjAi-f A 10 VAIPP, I ?L 3 1
As tite Applicant, we request permission to constmet improvement(s) within a C'onnty maintained Riglrt-of-Way or ensenrents
deeded to or maintained by St. Lucie county as public areas of the County. Below is a description of the type of worl(to be
performed in County Right -of -Way and name of County Road:
'.Rftkt boa Air poi°+ tfttTArl(.t sign on Cu; ►ib 14nq Vvi i d SI. LUC,c 81vd.
The following MUSThe submitted with an original signed copy of this application:
1) Detailed maintenance of traffic plan from FDOT's "Design Standards 600 Series". If traffic control requires detours,
and/or road closures, a Florida Registered Professional Engineer will be required to design, sign, and seal said plans.
2) Show on an attached plan(s) O1 "xIT' preferred) the location and character of the work, and detail the aspect of the work
that will disturb County maintained improvements (hereinafter referred to as "IMPROVEMENT'S").
Rd
Bp proccudlag with installation of work covered by this peamit, 1 agree to comply with the "GENERAL AND SPECIAL
CONDITIONS OF THE RIGHT-OF-WAY PERMIT".
//F —OQFF' CE Il. E ON 1' /� f I
RKII.IT--OP-WAY DESCRIP/TIONt �' �uCt i - t�U "-^�voo, UJ a.* , S O r UIUM- h%ou .iwt 4r ..d
✓L�_� T c-y.� Wa„(�a_LGu.oC.�_ Win.
U----"—.----------- --
REVIEWED BY ACQUISITIONS
The afarestated installation is herebypermitted under the following provisions:
DATE 10-I5-aolg
BOARD OFF COUNTY COMMISIONERS, ST. LUCIE COUNTY, FLORIDA
13Y�pSfwJrJ LL_ _.__DA•I'E�D I�v_itt
RIW PF.i
Count, •netneer-lieprescnlauce "'
HECEIVEb i&LF. ; .-o.
OCT 10 2018
OCT 10 2018
OCT I(p,.PIP
ENr-INFrPPrr
01VISp
ENGINFERINQ
1 / / ; • 1 tINN
The applicant declares that prior to filing this application, he/she has (1) ascertained the location of existing utilities that would be
affected by the proposed installation, and (2) notified such affected utility owners in writing regarding same, and (3) correlated the
proposed installation with owners of such utilities and determined that the proposed installation can be made without detriment to such
existing utilities. If granted a permit for construction of proposed installation on County rights -of -way, the applicant agrees to the
following:
1. Access: By application and acceptance of this permit, any employee of or person performing a duty for the County, is granted
access at any time to perform inspection or such duties as determined by and for the County.
2. Safety: All construction work shall comply with the safety provisions of all federal, state and local laws.
3. Traffic Control: Measures shall be provided during construction in accordance with the FDOT Design Standards 600 Series.
Traffic shall be maintained to the minimum applicable standard required for the type of site presence or by the County Engineer.
4. To Save Harmless the Board of County Commissioners and each and every member thereof from the payment of any
compensation or damages resulting from the exercise of rights and privileges herein granted.
5. In the event that modification or repair of the improvements on aforestated County right-of-way becomes necessary, to
promptly move/remove the installation permitted herein, as requested by the Board of County Commissioners of St. Lucie
County, Florida, at no cost to the County.
6. Removal of Installation: In the case of noncompliance with the requirements stated herein, the installation permitted herein
will be promptly brought into compliance or removed from County right-of-way by applicant at no cost to the County.
7. Repair of Improvements by Permittee:' Applicant agrees to promptly repair any damage/injury to improvements on County
right-of-way caused by reason of the exercise of rights and privileges herein granted, restoring same to a condition equal to
that which existed immediately prior to the infliction of such damage or injury in a manner satisfactoryto the County.
8. Permit Life:. If this permit is granted, it shall be valid for a period of 180 calendar days from date of approval subject to
termination by the County in the event that improvements on aforestated County right-of-way are to be
constructed/reconstructed, or in the event that such right-of-way shall be closed, abandoned, vacated or discontinued.
9. The attached sketch(s) covering details of the permitted installation shall be made a part of this permit. Deviations from the
approved work or maintenance of traffic plan shall require prior approval of the County Engineer.
10. Notification to County Engineer: The County Engineer's office shall be notified twenty-four (24) hours in advance of
starting work on County rights-of:way. New construction that is discovered to have begun without notification will be
subject to a stop work order until proper permits have been acquired. Unless the work activity is accomplished in
continuous work days (excluding weekends and holidays), re- notification shall be required upon any lapses.
11. Permit on Job Site: All projects requiring a County Right -Of -Way will be required to have a copy of the permit on the job site
and be able to produce said copy when requested. Failure to do so will be considered as operating without a valid permit and
operations shall cease and desist. Field work that is classified as maintenance will not be subject to the above. The. exception
on maintenance would be in the event excavation adjacent to a roadway is to be left open overnight. The County shall be
notified for the purpose of inspecting for adequate barricades, lights, etc.
12. Final Inspection: The County Engineer's office shall be notified by the applicant upon completion of the installation permitted
herein, so that a final inspection may be made.
13. Issuance of this permit in no way waives the authority and/or jurisdiction of any other governmental entity or existing facility
installed in accordance with applicable law. Applicant is solely responsible for ensuring that all other stakeholders affected
by the work or that have ownership of the work site, or portions thereof, have been adequately notified and have given
permission to perform work.
Rev. 8-3-18