Hi Lydia,
Increase in impervious area or any change in drainage patterns will be a different issue.
Yes, revised plans and drainage calculations are required to WQD for demonstrating the Water QL
Stormwater permit revision is required from SLC and SFWMD for increase of impervious area from BE
Thanks
Baby Thottakara
SCANNtL,
Civil Engineer, WQD
x2097
8O1G &. 2Q17
St. LUC Q CO1In},
„
BEST
places
to work
From: Lydia Galbraith
Sent: Tuesday, October 30, 2018 3:09 PM
To: Baby Thottakara <Thottakarab@stlucieco.org>
Cc: Patrick Dayan <DayanP@stlucieco.org>
Subject: RE: 7639 Commercial Circle, storm water permit #17-03, Bid permit 1605-0386
And I also notice that the new plans total impervious area 9308 sf.
From: Baby Thottakara
Sent: Tuesday, October 30, 2018 2:47 PM
To: Lydia Galbraith <galbraithl@stlucieco.org>
Cc: Patrick Dayan <DavanP@stlucieco.org>
Subject: RE: 7639 Commercial Circle, storm water permit #17-03, Bid permit 1605-0386
Lydia,
The stormwater permit was issued based on 8821 sq. ft. of proposed impervious area. For drainage
However their submittal for stormwater permit indicated the pavement is asphalt.
Thanks
Baby Thottakara
Civil Engineer, WQD
x2097
�B�EST
places
From: Lydia Galbraith
Sent: Tuesday, October 30, 2018 1:55 PM
To: Baby Thottakara <Thottakarab@stlucieco.org>
Cc: Patrick Dayan <DavanP@stlucieco.org>
Subject: 7639 Commercial Circle, storm water permit #17-03, Bld permit 1605-0386
Hi Baby,
Above storm water permit was issued last year for above address. Can you check in your records if the storm water permit was
why they apply for it. We don't issue separate building permit for new concrete parking area that should be part of the construc
Thank you,
Lydia CGaC6raith,
Zoning Specialist
Building and Code Regulation
(772)462-1555
galbraithl@stlucieco.org
�BEST
places
�o wnr(C
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to I
communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to I
communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public. records available to I
communications will be subject to public disclosure unless an exemption applies to the communication.. If you received this email in error, please notify the sender by reply e
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to I
communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email in error, please notify the sender by reply e
Planning ana Development
Services Department
Building & Code. Division
MEMORANDUM
TO: DAVID HAYS, ENGINEERING
FROM: LYDIA GALBRAITH, BUILDING & CODE DIVISION
DATE: October 30, 2018
SUBJECT: 7369 COMMERCIAL CIRCLE. PERMIT 1810-0470
Commercial project of metal building with site improvements. A storm water permit and driveway
permit were issued last year. The property is under construction. The contractor has submitted
plans to change the proposed parking area from asphalt to concrete. Please review the attached
civil drawings.
U
DEPARTMENT/TITLE
December 06, 2018 1 V iQ c)11
ST. LUCIE COUNTY Randy Rodgers, P.E. By Mail and Email
BOARD OF COUNTY Velcon Engineering, Inc.
COMNOSIONERS 590 NW Peacock Blvd, Suite 8
Poi St Lucie, FL 34986
LINDA BARTZ Reference: Elena Peluso Living Trust /7369 Commercial Circle
CHAIR Parcel ID #1335-802-0047-000-5
DISTRICT 3 Application for SLC Stormwater Permit # 17-03 (revised Dec 06, 2018)
Dear Mr. Rodgers,
CATHY TOWNSEND
VICE -CHAIR The Water Quality Division has reviewed the revised plans and request for eliminating the previously
DISTRICT 5 included site specific dry detention and parking lot curbing. Considering the assurance that the original
Master System for the Kings Highway Industrial Park meets all water quality and attenuation
requirements, SLC concur to the changes subject to the following conditions:
CHRIS DZADOVSKY
DISTRICT 1 Please provide notification to the County when the pre -construction meeting is scheduled so that
we may attend with the contractor and other parties.
Upon completion of the improvements and prior to requesting a Final Paving and Drainage Inspection,
SEAN MITCHELL please submit three (3) copies of "as -built" record plans signed and sealed by a professional land
DISTRICT 2 surveyor licensed to practice within the state of Florida. A signed and sealed letter of completion from
the Engineer of Record shall also be required. This letter must outline any and all substantial deviations
from the approved set of plans attached to this letter. The plans must depict, at a minimum, the location
FRANNIE HUTCHINSON and finished grades of all building centers, critical pavement spot elevations, and changes in grade or
DISTRICT 4 slope. The location, type, size, material and inverts of all drainage structures and pipes, the top of bank,
toe of slope and detail of control structure(s) for any and all Stormwater treatment facilities shall also be
depicted. Sufficient elevations for all accessible routes shall be provided to demonstrate compliance with
HOWARD N. TIPTON all applicable regulations. Please be advised, operators of construction activities that propose to clear,
COUNTY ADMINISTRATOR excavate or fill 1.0 acre of land or more over the life of the project are required to obtain coverage under
the Florida Department of Environmental Protection's National Pollutant Discharge Elimination System
DAN MCINTYRE "Generic Permit for Stormwater Discharge from Large and Small Construction Activities". The Notice
COUNTY ATTORNEY of Intent (NOI) to use the generic permit requires a Stormwater Pollution Prevention Plan (S WPPP) that
must be implemented to show compliance. Elements of a SWPPP include Best Management Practices
that will be utilized to minimize soil erosion and sedimentation from degrading the water quality of
MAILING ADDRESS downstream water bodies for any size project including less than 1.0 acre of disturbance. For more
2300 V IRGINIA AVENUE information, please contact the FDEP NPDES Stormwater Section and refer to section 1-7.7 of the Code
FORT PIERCE, FL 34982 of Ordinances of St. Lucie County, Florida.
If you have any questions or concerns regarding this matter, please do not hesitate to contact me directly
PHONE at (772) 462-2097 or email Inc at thottakarab@stlucieco.org.
(772) 462-2097 /n j Sincerely
TDD
(772)462-1428 Bab yThottakir E.
Civil Engineer, Water Quality Division
FAX Cc (email only):
(772) 462-2363 Don West, P.E. — Director, Public Works Kimberly Graham, P.E — County Engineer
File Patrick Dayan, P.E. — WQD Manager
E-MAIL EdmundBas— AssistantCountyEngineer
THOTrAI(ARAB@SrLUC IECO.ORG
WEBSITE
WWW.STLUCIECO.GOV
ST. LUC"IE W01) s'
1 Y ti• � _�
Lydia Galbraith
From: David Hays
Sent: Friday, November 09, 2018 5:07 PM
To: Lydia Galbraith
Cc: Baby Thottakara; Grant M. Chambers; Joe Cicio; Linda Pendarvis
Subject: 7369 Commercial Circle
Attachments: Construction and Driveway Review #1.docx
Reference: Building Permit #1810-0470
Attached are Engineering review comments for the plan design changes and driveway application.
David Hays, P.E., CFM
Senior Project Engineer
St. Lucie County Engineering Division
2300 Virginia Avenue
Ft. pierce, FL 34982
772-462-1491 (direct)
772-462-1707
haysd@stlucieco.org
2016'& 2017
�����a�UQ� np
BST
aces
o' �= sr.iuclEcduNrr
Please Note: Florida has very broad public records laws. Most written communications to or from County officials regarding County business are public records available to I
communications will be subject to public disclosure unless an exemption applies to the communication. If you received this email In error, please notify the sender by reply e
4
L VJ 1C WORKS
ENGINEERING DIVIS10N
November 9, 2018
Project:
7369 Commercial Circle
Ref:
Permit 1810-0470
To:
Lydia Galbraith
From:
David Hays
The plans dated October 17, 2018, received October 30, 2018 have been reviewed and the
following comments are offered:
1. On October 30, Engineering received the revised plans signed and sealed on October 17,
2018 by Randall Rogers, P.E., Velvon Engieering. The plans are significantly differing from,
the previously reviewed plans at DRC.
2. The plan set shall include a copy of the site topographic survey.
3. The plan set shall include a copy of the landscape plans. As discussed and provided in
my email on October 9, any revised plan should include no conflicts with the landscape
plan. This plan appears to eliminate the landscaping. ,
4. Provide a grading plan for the driveway, area between the road and eastern property line
and at the northern M.E.S.
5. A minimum five foot (5') deep turnout shall be provided beyond the western most parking
space for the width of the minimum allowable access aisle.
6. Planning should review the requirements and applicability of the parallel parking spaces.
7. The new northerly property boundary does not appear to include the previous buffer.
8. Cross Section A-3, appears to indicate asphalt for the paved area. Please clarify.
9. Provide a saw cut -butt joint detail.
10. The driveway slopes shall flow a minimum of 2% from the edge of travelway to the low
point in the driveway, a minimum of four feet (4') from the edge of travel.
11. The revised plan appears to eliminate potential stormwater runoff requirements. A SW
permit or modification is required from SLC Water Quality Division.
12. A separate utility connection permit has been issued for the site. The County Engineering
Division representative must be present during the WM tap.
Baby Thottakara
Grant Chambers
Linda Pendarvis
Joe Cicio
ST. LUCIE WORKS
Planning and Development
Services Department
Planning Division
MEMORANDUM
TO: David Hays, Engineering
FROM: Lydia Galbraith, Building and Code
DATE: February 26, 2019
SUBJECT: Peluso Building, 7369 Commercial Circle. Building permit 1605-0386 &
1810-0470
Attached final drainage specifications. Please review and inform if inspections in the building
permit can be signed off.
SCANNED
BY
St. Lucie County