HomeMy WebLinkAboutTHRESHOLD FIELD REPORTi I HKtbHULU I-ItLL) KtFUK I '�FCF 601 N. Congress Avenue OP `9 Unit 106A Qd� Delray Beach, FL 33445 ^% T: 561-265-6864 www.pennoni.com SITE !VISIT #12 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. OCEND18006 St. Lucie County Permit No. SLCrt1811-024 ,4 d Floor Balconies; SLC -1811-6z43 3nd Floo B nie—'° Location: 10978 S. Ocean Blvd., Jensen Beach, Fl- 0\ I I��// S Weather Condition&Tempature: Partly Cloudy/880 --%CCNSF?/s��� 4Q. �� Date: August 15, 2019 SegNNFo _ * N 9 2 , St. Contractor: RTI Construction �uCI�CoUnt� %7a® sT�A47)E��q��` i F a'� N Present: James RTIBarnes, nroni tt\ Frank, Construction1SVNA';S\' l Progress: Units 206 & 208 and Units 306 & 308 balcony edges. excavated with reinforcing in place: Comments: Arrived on site, as requested by the contractor to observe the following: 1. No problems found. Demo progress continues at Units 406 and 408 thru deck repairs. The repair on Units 506-508, 606-608 and 706-708 are completed. 2. Units 206 & 208 and Units 306 & 308 balconies excavation complete. The east, north, and south sides of the balcony have been excavated to expose the ends of two layers of approximately Y4 inch diameter welded. wire fabric reinforcing. (see Photographs 1-2) 3. Supplemental reinforcing has been added at 24" o/c per plan. 4. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. Install second coat Armatek 110 prior final pour. 5. Zinc anodes are in place at 2 feet o/c per plan. 6. OK to pour concrete per plan and specifications after anode installation. 7. Consolidate plastic concrete at time of placement by mechanical means. CC: Richard Rohde — North South Count ( richard.rohde(o)oplhotels.com) Livingston Adderley, RTI (jradderley@yahoo.com) By: VCfJ W' of James V. Barnes, Jr., Construction Administrator OCEND18006—SV #12 Photos August 15, 2019 Page 2 OPL Marriott Jensen Beach Balcony Repairs Photograph #01: 206 & 208 Surface Deck Repair Complete per Detail #1 Sheet 52.0 Photograph #02: 306 & 308 Surface Deck Repair Complete per Detail #1 Sheet 52.0 T� J RFCF� �a9 �,1p19 'Uc{pO�',Dd cot h'22e 601 N. Congress Avenue Unit 106A Delray Beach, Fl. 33445 T: 561-265-6864. www.pennonl.com THRESHOLD FIELD REPORT SITE VISIT,#09 Project: Courtyard Marriott Balcony Repairs McCarthy.Project No. OCENDI8 06 St. Lucie County Permit No. SLC 811-0243 nd Floor Balconies Location: 10978 S. Ocean Blvd. Jensen Beach, FL Date: July 25, 2019 Contractor: Miller Construction Present; James V, Barnes; Jr., Pennon) Frank, RTI Construction cool) Progress: Unit306 &308 Balcony edges excavated with reinforcing in place�'t Comments: Arrived on site; as requested by the contractor to observe the following: 1. Unit 306 & 308 balcony excavation complete. The east,, north, and south sides of the balcony have " been excavated to expose the ends of two layers of approximately ''/, Inch diameter welded wire fabric reinforcing. Repair of balcony nosing edge per detail #3 sheet S2.0. (See Photographs 1&2) 2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge bars. 3. SIKA Armatek 110 Epo-Cem to be added to the existing and new reinforcing, 4. (11) Zinc anodes are in place at 2 feet o/c per plan. Acceptable. 5, OK to pour concrete per plan and specifications after anode installation. 6. Consolidate plastic concrete at time of placement by mechanical means. CC: Richard Rohde— North South Const ( richard.rohde(a]oplhotels.com) Livingston Adderley, RTI (jradderley@yando.com ) James ``NN\'111�1 I. setmf. Ilz `\ Cif ••\'\�EN9F� .'f�.� 4F( N 4499,E 52 {_ OCEND18006 — SVH09 July 25, 2019 Page 2 North South Construction Marriott Balcony Repairs Photograph #01: Added #5 Repar per Detail #3 52.0 Photograph #02: Example of Current Edge Repair per Detail #3 52.0 a -� THRESHOLD FIELD REPORT RF�F 6'L- �Fo OC/P'ppd c�*hpP�or 601 N. Congress Avenue Unit 106A Delray Beach, FL33445 T:561-265-6864 www.pennoni.com SM VISIT #10 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. OCEND18006 St Lucie County Permit No. SLC-1811-0243 3ndFloor Balconies SLC-1811.0245 4`h Floor Balconies, SLC-1811.0246 5th Floor Balconies, SLC-1811-02486th Floor Balconies, SLC-1811-0249 Ph Floor Balconies Location: 10978 S. Ocean Blvd. Jensen Beach, FL Date: August 06, 2019 Contractor: Miller Construction Present: James V. Barnes, Jr., Pennoni Frank, RTI Construction Progress: Units 306 & 308 balcony edges repairs complete Comments: Arrived on site, as requested by the contractor to observe the following: 1. Units 306 & 308 balcony excavation completed. Repair of balcony nosing edge per detail #3 sheet S2:0. (See Photograph 1) 2. Units 606 & 608 balcony excavation was not complete and ready for Inspection due to rain and lightning delays today. Contractor requested reschedule for August 7, 2019 morning inspection. 3. Temporary shoring in place (See Photograph 2). CC: Richard Rohde —North South Const ( richard.rohde@oolhotels.com) Livingston Adderley, RTI (j radde rley@ya hoo.com) James ��//I'f.l 111111 n OCEND18006—SVN10 August 6,2019 Page 2 North South Construction Marriott Balcony Repairs Photograph 401: 306 & 308 Edge Repair Complete per Detail N3 Sheet S2.0 Photograph#02: Example of Temporary Shoring in Place per Section #1 Sheet S1.1