SITE !VISIT #12
Project: Courtyard Marriott Balcony Repairs
McCarthy Project No. OCEND18006
St. Lucie County Permit No. SLCrt1811-024 ,4 d Floor Balconies;
SLC -1811-6z43 3nd Floo B nie—'°
Location: 10978 S. Ocean Blvd., Jensen Beach, Fl- 0\ I I��//
S
Weather Condition&Tempature: Partly Cloudy/880 --%CCNSF?/s���
4Q. ��
Date: August 15, 2019 SegNNFo _ * N 9 2 ,
St.
Contractor: RTI Construction �uCI�CoUnt� %7a® sT�A47)E��q��`
i F a'� N
Present: James RTIBarnes, nroni tt\
Frank, Construction1SVNA';S\' l
Progress: Units 206 & 208 and Units 306 & 308 balcony edges. excavated with
reinforcing in place:
Comments:
Arrived on site, as requested by the contractor to observe the following:
1. No problems found. Demo progress continues at Units 406 and 408 thru deck repairs. The
repair on Units 506-508, 606-608 and 706-708 are completed.
2. Units 206 & 208 and Units 306 & 308 balconies excavation complete. The east, north, and
south sides of the balcony have been excavated to expose the ends of two layers of
approximately Y4 inch diameter welded. wire fabric reinforcing. (see Photographs 1-2)
3. Supplemental reinforcing has been added at 24" o/c per plan.
4. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. Install
second coat Armatek 110 prior final pour.
5. Zinc anodes are in place at 2 feet o/c per plan.
6. OK to pour concrete per plan and specifications after anode installation.
7. Consolidate plastic concrete at time of placement by mechanical means.
CC: Richard Rohde — North South Count
( richard.rohde(o)oplhotels.com)
Livingston Adderley, RTI
(jradderley@yahoo.com)
By: VCfJ W' of
James V. Barnes, Jr., Construction Administrator
OCEND18006—SV #12 Photos August 15, 2019 Page 2
OPL Marriott Jensen Beach Balcony Repairs
Photograph #01: 206 & 208 Surface Deck Repair Complete per Detail #1 Sheet 52.0
Photograph #02: 306 & 308 Surface Deck Repair Complete per Detail #1 Sheet 52.0
T�
J
RFCF�
�a9 �,1p19
'Uc{pO�',Dd
cot h'22e
601 N. Congress Avenue
Unit 106A
Delray Beach, Fl. 33445
T: 561-265-6864.
www.pennonl.com
THRESHOLD FIELD REPORT SITE VISIT,#09
Project: Courtyard Marriott Balcony Repairs
McCarthy.Project No. OCENDI8 06
St. Lucie County Permit No. SLC 811-0243 nd Floor Balconies
Location: 10978 S. Ocean Blvd.
Jensen Beach, FL
Date: July 25, 2019
Contractor: Miller Construction
Present; James V, Barnes; Jr., Pennon)
Frank, RTI Construction cool)
Progress: Unit306 &308 Balcony edges excavated with reinforcing in place�'t
Comments:
Arrived on site; as requested by the contractor to observe the following:
1. Unit 306 & 308 balcony excavation complete. The east,, north, and south sides of the balcony have
" been excavated to expose the ends of two layers of approximately ''/, Inch diameter welded wire
fabric reinforcing. Repair of balcony nosing edge per detail #3 sheet S2.0. (See Photographs 1&2)
2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge bars.
3. SIKA Armatek 110 Epo-Cem to be added to the existing and new reinforcing,
4. (11) Zinc anodes are in place at 2 feet o/c per plan. Acceptable.
5, OK to pour concrete per plan and specifications after anode installation.
6. Consolidate plastic concrete at time of placement by mechanical means.
CC: Richard Rohde— North South Const
( richard.rohde(a]oplhotels.com)
Livingston Adderley, RTI
(jradderley@yando.com )
James
``NN\'111�1 I. setmf. Ilz
`\ Cif ••\'\�EN9F� .'f�.�
4F( N 4499,E 52 {_
OCEND18006 — SVH09 July 25, 2019 Page 2
North South Construction Marriott Balcony Repairs
Photograph #01: Added #5 Repar per Detail #3 52.0
Photograph #02: Example of Current Edge Repair per Detail #3 52.0
a -�
THRESHOLD FIELD REPORT
RF�F
6'L- �Fo
OC/P'ppd
c�*hpP�or
601 N. Congress Avenue
Unit 106A
Delray Beach, FL33445
T:561-265-6864
www.pennoni.com
SM VISIT #10
Project: Courtyard Marriott Balcony Repairs
McCarthy Project No. OCEND18006
St Lucie County Permit No. SLC-1811-0243 3ndFloor Balconies
SLC-1811.0245 4`h Floor Balconies, SLC-1811.0246 5th Floor Balconies,
SLC-1811-02486th Floor Balconies, SLC-1811-0249 Ph Floor Balconies
Location: 10978 S. Ocean Blvd.
Jensen Beach, FL
Date: August 06, 2019
Contractor: Miller Construction
Present: James V. Barnes, Jr., Pennoni
Frank, RTI Construction
Progress: Units 306 & 308 balcony edges repairs complete
Comments:
Arrived on site, as requested by the contractor to observe the following:
1. Units 306 & 308 balcony excavation completed. Repair of balcony nosing edge per detail #3 sheet
S2:0. (See Photograph 1)
2. Units 606 & 608 balcony excavation was not complete and ready for Inspection due to rain and
lightning delays today. Contractor requested reschedule for August 7, 2019 morning inspection.
3. Temporary shoring in place (See Photograph 2).
CC: Richard Rohde —North South Const
( richard.rohde@oolhotels.com)
Livingston Adderley, RTI
(j radde rley@ya hoo.com)
James
��//I'f.l 111111
n OCEND18006—SVN10 August 6,2019 Page 2
North South Construction Marriott Balcony Repairs
Photograph 401: 306 & 308 Edge Repair Complete per Detail N3 Sheet S2.0
Photograph#02: Example of Temporary Shoring in Place per Section #1 Sheet S1.1