Loading...
HomeMy WebLinkAboutTHRESHOLD FIELD REPORTSCANNED BY St. Lucie County THRESHOLD FIELD REPORT 601 N. Congress Avenue Unit 106A Delray Beach, Fl. 33445 T: 561-265.6864 www.pennonl.com SITE VISIT #11 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. OCEND18006 St. Lcie County Permit No. SLC-1811-0243 3nd Floor Balconies G-L99502924YUh Floor Balconies, SLC-1811-0246 51h Floor Balconies, SLC-1811-024861 Floor Balconies, SLC-1811-0249 Ph Floor Balconies Location: Date: Contractor: Present: Progress: Comments: 10978 S. Ocean Blvd. Jensen Beach, FL August 07, 2019 RTI Construction James V. Barnes, Jr., Pennoni Frank, RTI Construction W4 62 'Y �00 STATE /� : 1�` i Units 706 & 708; 606 & 608; 506 & 508 Balcony decks spall excavation completed Units 406 & 408; 306 & 308; 206 & 208 Balcony decks excavation not completed Arrived on site, as requested by the contractor to observe the following: 1. Unit 706 & 708; 606 & 608; 506 & 508 balcony excavation complete. The mid -deck spalling of the balcony has been excavated to expose the top of layers of approximately''/< inch diameter welded wire fabric reinforcing and some deck rebar. (See Photographs 1-4) 2. Zinc anodes are to be,placed at 2 feet o/c per plan. Location of anodes placement was determined and acceptable. SIKA Armatek 110 Epo-Cem is to be added to the existing and new reinforcing after addition cleaning of wire. Then after anode installation per plan and specifications, OK to pour concrete. Contractor must consolidate plastic concrete at time of placement by mechanical means to remove voids. 3. Units 406 & 408; 206 & 208 balcony surface excavation indicates that Thru-Deck repair is required. (See Photographs 5 & 6) 4. Units 306 & 308 balcony excavation was not complete.Contact engineer or provide additional phots when repair area is expose for review. CC: Richard Rohde North South Const By: �1l{l21QQ (i. ZiR%r2e�, �L ( richard.rohdeCapoolhotels.com) James V, Barnes, Jr., Construction Administrator Livingston Adderley, RTI (j radderley@ya hoo.com) OCEND18006—SV11011 August 7, 2019 Page 2 North South Construction Marriott Balcony Reoalrs Photograph #01: 706 & 708 Surface Deck Repair Complete per Detail #1 Sheet S2.0 Photograph #02: 606 & 608 Surface Deck Repair Complete per Detail #1 Sheet S2.0 OCEND18006—SV44011 August 7, 2019 Page 3 North South Construction Marriott Balcony Repairs Photograph #03: 506 & 508 Balcony Deck Repair Complete per Detail #1 Sheet 52.0 Photograph #04; 506 & 508 Surface Deck Repair Complete per Detail #15heet 52.0 OCEND18006 — SVNO11 August 7, 2019 Page 4 North South Construction Marriott Balcony Repairs Photograph ##05: 406 & 408 Balcony Decl<Top Surface Photograph #106: 406 & 408 Balcony Deck Under Surface n_ 100 607 N. Congress Avenue ,Unit 106A Delray Beach, Fl. 33446 T: 561-265-6864. www.pennoni.com SITE VISIT #18 Project: Courtyard Marriott Balcony Repairs Pennon) Project No. OCEND180.06 St. Lucie County Permit o. SLC -1814S th Floor Balconies Location: 10978 S. Ocean Blvd., Jensen Beach, FL \�� Weather Condition & Temperature: Sunny /'82° / 9 30am-12:30pm \\\ � •• • Z4 Date: September24,'2019 ` * N as 52 Contractor; RTI Construction .0. STATE 6,%(V Present: James V. Barnes, Jr., Pennoni: / ya� •C A / Frank, RTI Construction /iX,trS+s,'OAI 1{�a�\\\\\ Progress: Units 402' 404 balcony edge excavated with reinforcing in place. Comments: Arrived on site, as requested by the contractor to observe the following: 1. Units 402-404 balcony deck edge of the balcony has been excavated to expose. the ends of two layers of approximately % inch diameter welded wire fabric reinforcing. (See Photograph 1). Repair of balcony nosing edge per detail #1 sheet S2.0. 2. It was recommended that the contractor remove that portion.of tile over the repair for better access to the top portion of the repair before the pour as it,may obstruct the repair. 3. Supplemental reinforcing has been added per plan. Two new #5 rebars that were added need to be trimmed back to allow the proper concrete edge clearance of 1-1/2" at edge of the repair. (See Photograph 2) 4. SIKA Armatek 110 Epo-Cem needsto be added to the existing and new reinforcing. Then a second coat Armatek 110 needs to be applied to the repair prior final pour. 5. Zinc anodes are in place at 2 feet o/c per plan. (2) anodes are to be in the repair. Contractor to document and forward pictures before pouring repair. 6. OK.to pour concrete per plan and specifications after anode installation. 7. Consolidate plastic concrete at time of placement by mechanical means. CC: Richard Rohde — North South Const. By: �&LU:4 /,yaww' (richard.rohde@oplhotels.com) James V. Barnes, Jr., Construction Coordinator Livingston Adderley, RTI (lradderley@yahoo.com) OCEND18006 —SV #18 Photos September 24, 2019 Page 2 OPL Marriott Jensen Beach .Balcony Repairs U c} illtAAI}h Mn"fin � 1 " t • aas � T m k Photograph #01: 402 &404 Deck Edge Repair Complete per Detail #3 Sheet S2.0 Photograph #02: 402 & 404 Deck Edge Repair Rebar Requires Trim to Obtain Clearance I I KLP6 NULLy tl'ILLU tttl UKI 'P Cl ��Fo O 601- N. Congress Avenue �Pq (r Unit106A d?� Delray Beach, FL 33445 '4. PAP T: 561-265-6864 w .pennonl.conn SITE VISIT #15 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. OCEND18006 St. Lucie County Permit NWUC-C181t1':0245 th Fi or Balcony SLC-1811-0249 71h Floor Balcony Location: 10978'S. Ocean Blvd., Jensen Beach, FL Weather Condition & Temperature: Cloudy / 87° 9:30am-12pm Date: August 29, 2019 Contractor: RTI Construction Present: James V. Barnes, Jr., Pennoni Frank, RTI Construction Progress: Units 400-402 and 702 balcony deck damage assessment. Comments: Arrived on site, as requested by the contractor to observe the following: 1. Problems were found in the initial inspection as follows. Edge repair and under deck damage was marked. Units 400-402 deck repairs were discovered and are requiring repairs. Edge repair required at units 702. 2. Units 406-408 balcony repairs are completed. The mid deck of the balcony has been completed. 3. The contractor was Informed to consider the means and methods for securing the entire jobslte before the weekend in anticipation of the approaching Hurricane Dorian. CC: Richard Rohde— North South Const By: �&AL4 0?/, F6Y Wz' 64 , ( richard.rohde@oplhotels.com) James V. Barnes, Jr., Construction Administrator Liv(j alngston ol dderley@ aho.com) \\�\���S J. N 49 2,. SJ�TE OF 0CEND18006—SV It15 Photos August 15, 2019 Page 2 OPL Marriott Jensen Beach Balcony Repairs Photograph #01: 400 & 402 Under Deck Requires Repair Completed per Detail #1 Sheet 52.0 Photograph #02: 700 Edge Deck Repair Required per Detail #3 Sheet 52.0