SITE VISIT ##16
Project: Courtyard MarriottBalcony Repairs
Pennon! Project No. OCEND18006,�
St. Lucie County Per I o. S[rC-1811.02 8- th Floor Balconies
Location: 10978 S. Ocean Blvd., Jensen Beach, FL
Weather Condition & Temperature: Partly Cloudy/ 82°+/-15-25mph Winds / 9:30am-11:30pm
Date: September 12; 2019 S'L ��\\\\�I 3.ISEt "V //�i
Contractor: RTI Construction
t Lucie 4 52 '.
Present: James V. Barnes, Jr., Pennon! COUnfY
=
Frank, RTI Construction o g6E F
Progress: Units 500 & 502 balcony deck excavated with reinforcing in plaf-p�F,;
Comments: �$A
f0Nk 1V\\V
Arrived on site, as requested by the contractor to observe the following:
1. Units 500 & 502 balcony excavation complete. The east, north, and south sides of the balcony
have been excavated to expose the ends of two layers of approximately X inch diameter welded
wire fabric reinforcing. Repair of balcony nosing edge per detail #t3 sheet S2.0. (See Photographs
1&2). Placement of the forms can be installed for the edge repair pour.
2. Supplemental reinforcing has been added at 24" o/c per plan.
3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. Install second
coat Armatek 110 prior final pour.
4. Zinc anodes are in place at 2 feet o/c per plan. (6) anodes are to be in the repair. 2 anodes were
loose and need to be reinstalled for proper connection. (See Photographs 3)
5. Isolate Base of Aluminum hand rails prior to pouring concrete as previously noted.
6. OK to pour concrete per plan and specifications after anode installation.
7. Consolidate plastic concrete at timeof placement by mechanical means.
8. Units 500 & 502 balcony mid deck of the balcony needs to excavated to expose the ends ofawo
layers of approximately % inch diameter welded wire fabric -reinforcing. (See Photographs 4).
CC: Richard Rohde — North South Const
( richard.rohde@oplhotels.com)
Livingston Adderley,, RTI
(jradderley@ya hoo.com )
By:T6aaree'AGanaea, 66.
James V. Barnes, Jr., Construction Administrator
Rolf,
o
-"INA
P'N
- Al
OPL — Marriott Jensen Beach Balcony Repairs
Photograph #03: 500 & 502 Deck Edge Repair Anode Needs Proper Installation
Photograph#04: 500&50IDeck Mid Deck Repair Required per Detail #1Sheet 82.0
THRESHOLD FIELD REPORT
601 N. Congress Avenue
Unit 106A
Delray Beach, FL 33445
T: 561-265-6864
www.pennoni.com
SITE VISIT #03
Project: Courtyard Marriott Balcony Repairs
McCarthy Project No. OCEND18006
Martin County Permit No. SLC AM 0 448 6th Floor Balconies
Location: 10978 S. Ocean Blvd.
Jensen Beach, FL A
Date: May 30, 2019
C �IpD
Contractor: Miller Construction '7 p/Q®k
Present: Robert J Selinsky P.E., Pennon! 4`
John Radderley, RTI Construction
Progress: Unit 612 Balcony formed with reinforcing in place
Comments:
W
Arrived on site, as requested by the contractor to observe the following:
1. Unit 612 balcony excavation complete. The east, north, and south sides of the balcony have
been excavated to expose the ends of two layers of approx. Y4 inch diameter welded wire
fabric reinforcing.
2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge
bars
3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing.
4. Observed work is acceptable. See plan for placement of zinc anodes.
5. Coat base of aluminum handrail posts with Sikadur 32 prior to pouring repair mortar.
6. OK to pour repair mortar per plan and specifications after anode installation.
7. Consolidate plastic concrete at time of placement by mechanical means. \\���o®��� ISFCs
CC: Richard Rohde —North South Const By: * No 49952
( richard.rohdePoolhotels.com) Robert J. Selinsky PEE.411. #1�14,5�r�
„ /� ee
OCEND18006 — Site Visit p1 May 30, 2019 1 Page 2
Ocean Properties Courtyard Marriott Balcony Repairs
jo
IA
7
a
.. ��. 'va4': • A e'pg6
a
y
9
Photograph 2 — View of Balcony Repair with Railing Post in Need of Coating