HomeMy WebLinkAboutTHRESHOLD FIELD REPORT-fir; l`/1�7.1[i•91�:�11� lia,���1 at1�1®'I'►�' 601 N. Congress Avenue unit 1064 Delray Beach, FL33445 T: 561-265-6864 www.pennoni.com SITE VISIT ##16 Project: Courtyard MarriottBalcony Repairs Pennon! Project No. OCEND18006,� St. Lucie County Per I o. S[rC-1811.02 8- th Floor Balconies Location: 10978 S. Ocean Blvd., Jensen Beach, FL Weather Condition & Temperature: Partly Cloudy/ 82°+/-15-25mph Winds / 9:30am-11:30pm Date: September 12; 2019 S'L ��\\\\�I 3.ISEt "V //�i Contractor: RTI Construction t Lucie 4 52 '. Present: James V. Barnes, Jr., Pennon! COUnfY = Frank, RTI Construction o g6E F Progress: Units 500 & 502 balcony deck excavated with reinforcing in plaf-p�F,; Comments: �$A f0Nk 1V\\V Arrived on site, as requested by the contractor to observe the following: 1. Units 500 & 502 balcony excavation complete. The east, north, and south sides of the balcony have been excavated to expose the ends of two layers of approximately X inch diameter welded wire fabric reinforcing. Repair of balcony nosing edge per detail #t3 sheet S2.0. (See Photographs 1&2). Placement of the forms can be installed for the edge repair pour. 2. Supplemental reinforcing has been added at 24" o/c per plan. 3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. Install second coat Armatek 110 prior final pour. 4. Zinc anodes are in place at 2 feet o/c per plan. (6) anodes are to be in the repair. 2 anodes were loose and need to be reinstalled for proper connection. (See Photographs 3) 5. Isolate Base of Aluminum hand rails prior to pouring concrete as previously noted. 6. OK to pour concrete per plan and specifications after anode installation. 7. Consolidate plastic concrete at timeof placement by mechanical means. 8. Units 500 & 502 balcony mid deck of the balcony needs to excavated to expose the ends ofawo layers of approximately % inch diameter welded wire fabric -reinforcing. (See Photographs 4). CC: Richard Rohde — North South Const ( richard.rohde@oplhotels.com) Livingston Adderley,, RTI (jradderley@ya hoo.com ) By:T6aaree'AGanaea, 66. James V. Barnes, Jr., Construction Administrator Rolf, o -"INA P'N - Al OPL — Marriott Jensen Beach Balcony Repairs Photograph #03: 500 & 502 Deck Edge Repair Anode Needs Proper Installation Photograph#04: 500&50IDeck Mid Deck Repair Required per Detail #1Sheet 82.0 THRESHOLD FIELD REPORT 601 N. Congress Avenue Unit 106A Delray Beach, FL 33445 T: 561-265-6864 www.pennoni.com SITE VISIT #03 Project: Courtyard Marriott Balcony Repairs McCarthy Project No. OCEND18006 Martin County Permit No. SLC AM 0 448 6th Floor Balconies Location: 10978 S. Ocean Blvd. Jensen Beach, FL A Date: May 30, 2019 C �IpD Contractor: Miller Construction '7 p/Q®k Present: Robert J Selinsky P.E., Pennon! 4` John Radderley, RTI Construction Progress: Unit 612 Balcony formed with reinforcing in place Comments: W Arrived on site, as requested by the contractor to observe the following: 1. Unit 612 balcony excavation complete. The east, north, and south sides of the balcony have been excavated to expose the ends of two layers of approx. Y4 inch diameter welded wire fabric reinforcing. 2. Supplemental reinforcing has been added at 24" o/c per plan with (2) #5 continuous edge bars 3. SIKA Armatek 110 Epo-Cem has been added to the existing and new reinforcing. 4. Observed work is acceptable. See plan for placement of zinc anodes. 5. Coat base of aluminum handrail posts with Sikadur 32 prior to pouring repair mortar. 6. OK to pour repair mortar per plan and specifications after anode installation. 7. Consolidate plastic concrete at time of placement by mechanical means. \\���o®��� ISFCs CC: Richard Rohde —North South Const By: * No 49952 ( richard.rohdePoolhotels.com) Robert J. Selinsky PEE.411. #1�14,5�r� „ /� ee OCEND18006 — Site Visit p1 May 30, 2019 1 Page 2 Ocean Properties Courtyard Marriott Balcony Repairs jo IA 7 a .. ��. 'va4': • A e'pg6 a y 9 Photograph 2 — View of Balcony Repair with Railing Post in Need of Coating