Post -Building Permit Addendum Engineer's Feld Observation Report #1
Date: April 30; 2015
SCANNED
To: Plan Reviewer By
St. Lucie County Building Department St. Lucie County
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: baniello & Associates, Inc.
2708 N Australian Avenue, Suite 9, West Palm Beach, FL 33407
Referenced Project: Concrete Restoration
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
Permit No. 1312-0243
Mathers Engineering Corporation visited the job site and made the following observations of the
ongoing concrete restoration and repairs of exterior balconies:
Site Observations from-4/7/15 thrn 4/29/15:
Units 202 — 702- The only repairs made on these units were to caulk existing cracks
along the balcony edges.
• Units 203 — 703: The only repairs made on these units were to caulk existing cracks
along the balcony edges.
Unit 705: Site observations were made progressively during the repair phase. A
complete full depth 12" edge repair was done for the entire width of the balcony. Steel
reinforcement was inspected, cleaned and coated, and where necessary, new rebars were
doweled and expoxied into existing concrete. Repair was subsequently waterproofed.
Concrete restoration work on this unit is completed.
Units 205 — 605: The only repairs made on these units were to caulk existing cracks
along the balcony edges.
Units 206 — 606: The only repairs made on these units were to caulk existing cracks
along the balcony edges.
• Units 207 — 607: The only repairs made on these units were to caulk existing cracks
along the balcony edges.
N
MATHERS ENGINEERING
CORPORATION
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
Fax: (772) 220-8686
EB#0004456
Unit 706/707: Site observations were made progressively during the repair phase. The
repairs included a vertical column repair lying on the common wall between the two
units. Steel reinforcement was inspected, cleaned and coated, and where necessary, new
rebars were doweled and expoxied into existing concrete. Concrete restoration work on
this column is completed.
Units 208 — 608: The only repairs made on these units were to caulk existing cracks
along the balcony edges.
• Unit 708: Site observations were made progressively during the repair phase. A
complete full depth 13" edge repair was done for the entire width of the balcony. Steel
reinforcement was inspected, cleaned and coated, and where necessary, new rebars were
doweled and expoxied into existing concrete. Repair was subsequently waterproofed.
Concrete restoration work on this unit is completed.
Unit 410: Site observations were made progressively during the repair phase. The only
repairs were a small edge repair at a guard rail post. Concrete restoration on this unit is
completed.
Unit 509: Site observations were made progressively during the repair phase. The
repairs included a partial depth repair near the sliding glass doors. Repair was
subsequently waterproofed. Concrete restoration work on this unit is completed.
• Unit 607: Site observations are ongoing. The balcony edge is undergoing a repair.
Concrete restoration work on this unit is not completed.
Limitations:
Our professional services have been performed, our findings obtained and our opinions prepared
in accordance with general accepted engineering principles and practices. This company is not
responsible for the conclusions, opinions or recommendations made by others based on our
findings.
2
h 2431 SE Dixie Highway
�-� Stuart, FL34996
Phone: (772) 287-0525
MATHERS ENGINEERING Fax: (772) 220-8686
CORPORATION EB#0004456
Post -Building Permit Addendum Engineer's Field Observation Report #1
Date: March 27, 2014
To: Plan Reviewer
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Daniello & Associates, Inc.
2708 N Australian Avenue, Suite 9, West Palm Beach, FL 33407
Referenced Project: Concrete Restoration
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
Permit No. 1312-0243
Mathers Engineering Corporation visited the job site for the following observations of the
ongoing concrete restoration and repairs of exterior balconies:
Site Observations:
Unit 505: Site observations indicated cracking along the balcony edge. Contractor was
instructed to chip out area for inspection. A complete full depth 12-inch edge repair was
made for the entire el. Steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were doweled and expoxied into the existing slab. Concrete repair
was made using.5,000 psi concrete bag mix. Repair area was subsequently waterproofed.
Existing guardrails were removed and new guard rails will be installed by a separate
railing company under separate permit.
Unit 507: Site observations indicated areas of balcony deck near living room sliding
glass doors that were cracking. Contractor was instructed to chip out area for inspection.
Partial depth repairs were made. Steel reinforcement was inspected, cleaned and coated,
and where necessary, new rebars were doweled and expoxied into the existing slab.
Concrete repair was made using 5,000 psi concrete bag mix. Repair area was
subsequently waterproofed. Existing guardrails were removed and new guard rails will
be installed by a separate railing company under separate permit.
MATHERS ENGINEERING
CORPORATION
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
Fax: (772) 220-8686
EB#0004456
Unit 602: Site observations indicated areas of balcony deck near living room and
bedroom sliding,glass doors that were cracking. Contractor was instructed to chip out
area for inspection. Partial depth repairs were made. Steel reinforcement was inspected,
cleaned and coated, and where necessary, new rebars were doweled and expoxied into the
existing slab. Concrete repair was made using 5,000 psi concrete bag mix. Repair area
was subsequently waterproofed. Existing guardrails were removed and new guard rails
will be installed'by a separate railing company under separate permit.
Unit 609: Site observations indicated areas of balcony deck near the bedroom sliding
glass doors were cracking. In addition, cracking was observed along the balcony edge.
Contractor was instructed to chip out near the sliding glass doors and to chip off the
balcony edge for inspection. A complete full depth 6-inch repair was made, and apartial
depth 6-inch repair behind the full depth repair was made for the full length of the edge.
Partial depth repairs were made by the bedroom sliding glass doors. Steel reinforcement
was inspected, cleaned and coated, and where necessary, new rebars were doweled and
expoxied into the existing slab. Concrete repair was made using 5,000 psi concrete bag
mix. Repair area was subsequently waterproofed. Existing guardrails were removed and
new guard rails will be installed by a separate railing company under separate permit.
• Units 201 thru 701: (Stack at the North end of the building)
Site observations indicated cracking along all balcony edges. Contractor was instructed
to start chipping away at the edge until good rebar was found. The same instructions
were given for Unit 401. After extensive test chipping, it was determined that Unit 201
and 401 needed "complete removal. Based on these observations and with Association
approval, it may determined that Units 201 thru 701 will have full deck replacement,
unless it is determined during demolition that the existing condition of the steel
reinforcement will allow for deck repairs.
Limitations:
Our professional services have been performed, our findings obtained and our opinions prepared
in accordance with general accepted engineering principles and practices. This company is not
responsible for the conclusions, opinions or recommendations made by others based on our
N2431 SE Dixie Highway
IV Iwo Stuart, FL 34996
Phone: (772) 287-0525
MATHERS ENGINEERING Fax: (772) 220-8686
CORPORATION EB#0004456
Post -Building Addendum Engineer's Field Observation Report #3Addendum Engineer's Field Observation Report #3
Date: June 23, 2014
To: Plan Reviewer
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Daniello & Associates, Inc.
2708 N Australian Avenue, Suite 9, West Palm Beach, FL 33407
Referenced Project: Concrete Restoration
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
Permit No. 1312-0243
Mathers Engineering Corporation visited the job site for the following observations of the
ongoing concrete restoration and repairs of exterior balconies:
Site Observations thru June 20, 2014:
Unit 101: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
.necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
Guardrails have not yet been installed.
Unit 201: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
Guardrails have not yet been installed.
Unit 301: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was.
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
Guardrails have not yet been installed.
N2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
MATHERS ENGINEERING Fax: (772) 220-8686
CORPORATION EB#0004456
• Unit 401: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
Guardrails have not yet been installed.
• Unit 501: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
Guardrails have not yet been installed.
Unit 601: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
The newly poured concrete deck has now been waterproofed. In addition, the sliding
glass doors have been reinstalled. Guardrails have not yet been installed.
Unit 701: Column Repairs at various locations on either side of the Sliding Glass Door
openings were made where needed. At these locations partial depth chipping was
performed, existing steel reinforcement was inspected, cleaned and coated, and where
necessary, new rebars were added. Also anodes were installed at strategic locations.
Columns were repoured using 5,000 psi concrete.
The newly poured concrete deck has now been waterproofed. In addition, the sliding
glass doors have been reinstalled. Guardrails have not yet been installed.
Limitations:
Our professional services have been performed, our findings obtained and our opinions prepared
in accordance with general accepted engineering principles and practices. This company is not
responsible for the conclusions, opinions or recommendations made by others based on our
indnjjiA,11!1l f-
�� l
�6t� IZ V
4
.I/f.I fi) t 4111 Y4d� 2
MATHERS ENGINEERING
CORPORATION
FINAL CLOSE-OUT ON RESTORATION WORK
Date: November 01, 2018
To: Mr. Joe Cicio, Plan Reviewer
St. Lucie.County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Daniello &Associates, Inc.
2708 N. Australian Avenue, Suite 9
West Palm Beach, FL 33407
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0526
EB#004456
SC
qN
st <p�/ec Un0
ty
Referenced -Project: Concrete Railing Replacement and Concrete Restoration for Units 602, 702,
101, 201, 301, 401, 501, 701 and column repair in front of Unit 605 on catwalk
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
The completed concrete restoration did not reduce the structural integrity of the remaining existing structural
systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's
components and elements outside the renovation area of this permit do not have their current wind load
resistant capacity or gravity load capacity compromised by the completed concrete restoration.
Mathers Engineering Corporation performed onsite inspections and reports to the building department as the
job progressed. Repairs required minor shoring. Work such as concrete repair and addition of steel
reinforcement was inspected. The enclosed Record Drawings (Sheets 1, 2 and 3) show the areas of
restoration and repair, and are made part of this final close-out document approval.
At the time the work was completed, Unit 201 had a full depth repair and the work has been completed. The
unit owner has failed to install new shutters. The Association has mandated that the owner of Unit 201 board
up the balcony deck during the entire hurricane season until they install new shutters.
Materials used an work performed to date has been substantially completed in conformance with the
specifications outlined in the IRCI Guideline No. 03730, as well as the applicable 2010 Florida Building
Codes and updates, other industry guidelines, or standard engineering practices.
Approv
William J. Mathers, PE
Florida License #19658
Special Inspector FL License
—
STATE OF (X�
11OR%10,, __
i/ONAt-0���
WSCANNED
• WN BY
MATHERS ENGINEERING St. Lucie County
CORPORATION
FINAL CLOSE-OUT ON RESTORATION WORK
Date: November 01, 2018
To: Mr. Joe Cicio, Plan Reviewer
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Daniello &Associates, Inc.
2708 N. Australian Avenue, Suite 9
West Palm Beach, FL 33407
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#004456
RFCF�FD
NOp 09zole
Pe !,ItrIn
to a Coin ®nt
Referenced Project: Concrete Railing Replacement and Concrete Restoration for Units 602, 702,
101, 201, 301, 401, 501, 701 and column repair in front of Unit 605 on catwalk
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
The completed concrete restoration did not reduce the structural integrity of the remaining existing structural
systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's
components and elements outside the renovation area of this permit do not have their current wind load
resistant capacity or gravity load capacity compromised by the completed concrete restoration.
Mathers Engineering Corporation performed onsite inspections and reports to the building department as the
job progressed. Repairs required minor shoring. Work such as concrete repair and addition of steel
reinforcement was inspected. The enclosed Record Drawings (Sheets 1, 2 and 3) show the areas of
restoration and repair, and are made part of this final close-out document approval.
At the time the work was completed, Unit 201 had a full depth repair and the work has been completed. The
unit owner has failed to install new shutters. The Association has mandated that the owner of Unit 201 board
up the balcony deck during the entire hurricane season until they install new shutters.
Materials used an work performed to date has been substantially completed in conformance with the
specifications outlined in the IRCI Guideline No. 03730, as well as the applicable 2010 Florida Building
Codes and updates, other industry guidelines, or standard engineering practices.
Approved, \\\\�\PM .MA�z
\����) • GENSF ytcfj SCANNED
3: PE 1 9658 '•N BY
= St. Lucie County
STATE OF ,��`
!r
William J. athers, PE ii0%..tOR%V ,-'gF NN
Florida License # 19658 Z// ONA1-��\��
Special Inspector FL License #SI-/`rS�!W111111110
OWN
MATHERS ENGINEERING
CORPORATION
November 28, 2018
N
Mr. William E. Durden, Plans Examiner
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
N
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
EB#004456
Referenced Project: Concrete Restoration for Units 602, 702, 101, 201, 301, 401, 501, 701 and
column repair in front of Unit 605 on catwalk.
For Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
Permit No: 1811-0187
Dear Mr. Durden:
This responds to your comments dated 11/16/2018 for the after the fact permit for those units
separated out from the original permit #1312-0243.
As requested, I have enclosed copies of our original signed and sealed threshold reports for concrete
restoration made to the units referenced above.
These original signed and sealed reports were filed timely under the prior concrete restoration
permit 41312-0243 as the work was being completed. Accordingly, we are providing the Building
Department with copies of our original threshold reports so that they may be filed under this new
after the fact permit. \\\\\\\\\ I I I I I Iq �,
Approved, F
ENS ytc
.��
PE 19 58 N
* '
SpTATE OF ;
William J. Mathers, PE ^Y SS/ONAI.�G���
Florida License #19658 �,///11 1111110
Special Inspector FL License #SI-55
MATHERS ENGINEERING
CORPORATION
FINAL CLOSE-OUT ON RESTORATION WORK
Date: November 01, 2018
To: Mr. Joe Cicio, Plan Reviewer
St. Lucie County Building Department
2300 Virginia Avenue
Fort Pierce, FL 34982
Contractor: Daniello &Associates, Inc.
2708 N. Australian Avenue, Suite 9
West Palm Beach, FL 33407
2431 SE Dixie Highway
Stuart, FL 34996
Phone: (772) 287-0525
E
RECEIVED B#004456
Nov a 9 pole
Permauna t) ®rtment
St, Lucl® roNIT6y
c e y
St uNFO
County
Referenced Project: Concrete Railing Replacement and Concrete Restoration for Units 602, 702,
101, 201, 301, 401, 501, 701 and column repair in front of Unit 605 on catwalk
for Atlantis III by The Sea Condominium
Located at 10200 S. Ocean drive, Jensen Beach, FL 34957
The completed concrete restoration did not reduce the structural integrity of the remaining existing structural
systems and, therefore, a requirement to upgrade them by this permit was not warranted. Existing building's
components and elements outside the renovation area of this permit do not have their current wind load
resistant capacity or gravity load capacity compromised by the completed concrete restoration.
Mathers Engineering Corporation performed onsite inspections and reports to the building department as the
job progressed. Repairs required minor shoring. Work such as concrete repair and addition of steel
reinforcement was inspected. The enclosed Record Drawings (Sheets 1, 2 and 3) show the areas of
restoration and repair, and are made part of this final close-out document approval.
At the time the work was completed, Unit 201 had a full depth repair and the work has been completed. The
unit owner has failed to install new shutters. The Association has mandated that the owner of Unit 201 board
up the balcony deck during the entire hurricane season until they install new shutters.
Materials used an work performed to date has been substantially completed in conformance with the
specifications outlined in the IRCI Guideline No. 03730, as well as the applicable 2010 Florida Building
Codes and updates, other industry guidelines, or standard engineering practices.
Approved, \�x\%IIIIII///�/�
PP \���\\ 1MJ. MAry
�vV.•�\GENs" F,pN i
19658
L/MATE OF ; tr
'1 �4
William J. Mathers, PE �i/Oc� PC0RIOP•G�����
Florida License #19658 //// ss/0-NA1-Ea
Special Inspector FL License #Sf4s' l I I I I 11l
K,